| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.1 CrAccepted-AOC 545 G T ROAD HOWRAH WEST BENGAL 711101 | HOWRAH | HOWRAH | WEST BENGAL | 711101 | ₹34.1 Cr Quoted ₹34.4 Cr | L1 | Accepted-AOC Being Reasonable and Accepted |
| 2 | L2₹34.7 Cr+₹28.4 L (0.83%)Rejected-AOC | ₹34.7 Cr+₹28.4 L (0.83%) | L2 | Rejected-AOC Other Than L1 |
| 3 | L3₹35.1 Cr+₹74.1 L (2.16%)Rejected-AOC 203 A GOKUL ARCADE VILE PARLE EAST MUMBAI 400 057 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400057 | ₹35.1 Cr+₹74.1 L (2.16%) | L3 | Rejected-AOC Other Than L1 |
| 4 | L4₹35.9 Cr+₹1.5 Cr (4.46%)Rejected-AOC | ₹35.9 Cr+₹1.5 Cr (4.46%) | L4 | Rejected-AOC Other Than L1 |
| 5 | L5₹36.3 Cr+₹1.9 Cr (5.55%)Rejected-AOC | ₹36.3 Cr+₹1.9 Cr (5.55%) | L5 | Rejected-AOC Other Than L1 |
| Sl No | Description | Qty | Unit | MC Gandhi and Sons L5 | PANCHDEEP CONSTRUCTIONS LIMITED L1 | Som Projects Pvt. Ltd. L4 | TALWADEKARS INDIA BUILDCON L2 | PRIME CIVIL INFRASTRUCTURES PVT LTD L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE 'A' PART-I - BUILDINGS & STRUCTURES INCLUDING INTERNAL & EXTERNAL SERVICES AS DEFINED IN ANNEXURE-I TO XV Note: This schedule is not pre-priced by MES and the rate indicated as "Rs 0.00" under Col 6 signifies this fact only | ||||||||
| 1.10 | Design and Construction of Multi-storeyed ORs Married Accommodation (S+17) Floors (01 Tower) for 68 DUs including stilt Parking at Colaba, Mumbai including all internal services and external services as defined in Annexure-I to XV (excluding Sch 'A' Part II to XI), complete as detailed in scope of work and other documents of tender, complete all as specified and directed | 1 | Lump Sum | 33,81,30,329.7 ₹33,81,30,329.7 | 31,40,00,000 ₹31,40,00,000 | 32,50,00,000 ₹32,50,00,000 | 30,96,64,661 ₹30,96,64,661 Lowest | 32,30,69,094.66 ₹32,30,69,094.66 |
| 1.20NOTE: Schedule ‘A’ Part II to IX items which are Prepriced by MES, Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only. | ||||||||
| 2.00 | Total amount of Sch ‘A’ Part II (Road, Culverts and Hard Standing ) | 1 | Lump Sum | 45,00,809.77 ₹45,00,809.77 Lowest | 51,90,175 ₹51,90,175 | 72,37,788.69 ₹72,37,788.69 | 81,50,115 ₹81,50,115 | 60,82,175.37 ₹60,82,175.37 |
| 3.00 | Total amount of Sch ‘A’ Part III (Area Drainage) | 1 | Lump Sum | 7,76,383.24 ₹7,76,383.24 Lowest | 8,30,780 ₹8,30,780 | 12,63,071.24 ₹12,63,071.24 | 12,28,307 ₹12,28,307 | 11,58,780.9 ₹11,58,780.9 |
| 4.00 | Total amount of Sch 'A' Part-IV (Sewage Disposal) | 1 | Lump Sum | 15,76,629.85 ₹15,76,629.85 Lowest | 18,00,420 ₹18,00,420 | 22,03,239.15 ₹22,03,239.15 | 26,68,142 ₹26,68,142 | 20,21,320.32 ₹20,21,320.32 |
| 5.00 | Total amount of Sch ‘A’ Part V (Chain Link Fencing) | 1 | Lump Sum | 3,68,347 ₹3,68,347 | 1,92,452 ₹1,92,452 Lowest | 2,85,859.64 ₹2,85,859.64 | 3,04,217 ₹3,04,217 | 2,62,256.55 ₹2,62,256.55 |
| 6.00 | Total amount of Sch ‘A’ Part VI (External Water Supply) | 1 | Lump Sum | 44,082.23 ₹44,082.23 | 15,029 ₹15,029 Lowest | 25,487.54 ₹25,487.54 | 26,609 ₹26,609 | 16,029.9 ₹16,029.9 |
| 7.00 | Total amount of Sch ‘A’ Part VII (External Electric Supply) | 1 | Lump Sum | 2,86,685.87 ₹2,86,685.87 Lowest | 3,00,117 ₹3,00,117 | 4,15,533.45 ₹4,15,533.45 | 3,96,206 ₹3,96,206 | 3,22,118.95 ₹3,22,118.95 |
| 8.00 | Total amount of Sch ‘A’ Part VIII (Demolition/ Dismantling) | 1 | Lump Sum | 63,05,236.99 ₹63,05,236.99 | 60,00,000 ₹60,00,000 Lowest | 62,36,634.02 ₹62,36,634.02 | 87,31,286 ₹87,31,286 | 62,36,634.02 ₹62,36,634.02 |
Tender Value
₹36.6 Cr
EMD Value
₹15 L
Closing Date
21 Jul 2025, 6:00 pmClosed
Chief Engineer Pune Zone
HQ Chief Engineer Pune Zone Pune - 411001
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) FOR PROVISION OF OR MARRIED ACCOMODATION (68 DUs, S PLUS 17 FLOORS) AT COLABA.
2025_MES_708610_1
84610
Open Tender
Civil Works
Lump-sum
900 days
Colaba
Class SS and Category a(i)
Also refer NIT and PQC criteria
8 documents required · 8 mandatory
₹3,000
GE (West) Colaba
₹15 L
Yes
HQ Chief Engineer Pune Zone
23 Oct 2025
16 May 2025
28 Jul 2025
16 May 2025
21 Jul 2025
30 Jun 2025
17 May 2025 - 24 May 2025
27 May 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SCHEDULE 'A' PART-I - BUILDINGS & STRUCTURES INCLUDING INTERNAL & EXTERNAL SERVICES AS DEFINED IN ANNEXURE-I TO XV
Note: This schedule is not pre-priced by MES and the rate indicated as "Rs 0.00" under Col 6 signifies this fact only | - | - | - | - |
| - | Design and Construction of Multi-storeyed ORs Married Accommodation (S+17) Floors (01 Tower) for 68 DUs including stilt Parking at Colaba, Mumbai including all internal services and external services as defined in Annexure-I to XV (excluding Sch 'A' Part II to XI), complete as detailed in scope of work and other documents of tender, complete all as specified and directed | 1 | Lump Sum | - | - |
| 2 | Total amount of Sch ‘A’ Part II (Road, Culverts and Hard Standing ) | 1 | Lump Sum | 60,82,175.37 | ₹60,82,175.37 |
| - | Total amount of Sch ‘A’ Part III (Area Drainage) | 1 | Lump Sum | 11,58,780.95 | ₹11,58,780.95 |
| - | Total amount of Sch 'A' Part-IV (Sewage Disposal) | 1 | Lump Sum | 20,21,320.32 | ₹20,21,320.32 |
| - | Total amount of Sch ‘A’ Part V (Chain Link Fencing) | 1 | Lump Sum | 2,62,256.55 | ₹2,62,256.55 |
| - | Total amount of Sch ‘A’ Part VI (External Water Supply) | 1 | Lump Sum | 16,029.9 | ₹16,029.9 |
| - | Total amount of Sch ‘A’ Part VII (External Electric Supply) | 1 | Lump Sum | 3,22,118.95 | ₹3,22,118.95 |
| - | Total amount of Sch ‘A’ Part VIII (Demolition/ Dismantling) | 1 | Lump Sum | 62,36,634.02 | ₹62,36,634.02 |
| - | Total amount of Sch 'A' Part-IX (Site Clearance, Excavation & Earthwork) | 1 | Lump Sum | 8,29,662.83 | ₹8,29,662.83 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tenderdocument.pdf
Tender Documents • 11.30 MB
BOQ.xls
BOQ • 0.37 MB
Tenderdocument_2.pdf
Tender Documents • 5.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .