| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.5 LAdmitted-Finance 00 GONDA VISHNUPURI COLONEY GONDA GONDA UTTAR PRADESH 271002 | GONDA | UTTAR PRADESH | 271002 | -27.99% | ₹32.5 L | L1 | Admitted-Finance |
| 2 | L2₹38.0 LAdmitted-Finance | -15.64% | ₹38.0 L | L2 | Admitted-Finance |
| 3 | L3₹39.3 LAdmitted-Finance KE 3 KARMYOGI NAGAR NH 2 MATHURA | MATHURA | MATHURA | UTTAR PRADESH | -12.79% | ₹39.3 L | L3 | Admitted-Finance |
Updated dates
Tender Value
₹45.1 L
EMD Value
₹2.3 L
Closing Date
6 Dec 2025, 5:00 pmClosed
Executive Engineer
MVDA, MATHURA
WORK NO. 06 VRINDAVAN STHIT RUKMANI VIHAR SE KESHAV DHAM KO JANE VALE MARG PAR NALA DHAKNA EVAM SUDRIDIKARAN KA KARYA
2025_UPMVD_1090087_6
14/MVDA/2025-26 2B
Open Tender
Civil Works
90 days
MATHURA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
Secretary
₹2.3 L
13 Feb 2026
13 Nov 2025
8 Dec 2025
13 Nov 2025
6 Dec 2025
13 Nov 2025
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. dsr 2023 i.no 15.56
15 mm cement plaster on rough side of single or half brick wall of mix : dsr 2023 i.no 13.5.1
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. In cement mortar dsr 2023 i.no 15.7.4
Cartage of dismentled material 3km distance UPPWDSOR 2023-24 S.NO 3 page .no. 16A
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)
dismantling interlocking tiles work in roads laid in dry sand incluiding stacking with 50 m lead gor thickness of tile 60 mm to 80mm sor 2023 ch 17i.no22
Laying of interlocking Tile including/providing a base layer of fine sand below tiles & jointing with mortar including supply of all materials labour etc required for proper completion of the work.
Supply & Laying of precast concrete Block ( Interlocking tiles) for paving of thickness 80mm rubber mould Coloured (Compressive strength not less then 30Mpa as specified in IS:15658 and weight 4.50kg) as jindal,naval or equivalant Including 25mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work as specified in IS 15658:2006. as directed by E/I. SN0.16 New item page 52 chapter 20 UPPWDSOR 2022-23
Neat cement punning. DSR-2023, Item No-13.18
Providing, laying spreading & compacting of granular sub base (GSB) by providing close graded (Fr-1) materials, sprading in uniform layers with Mortor Graded on prepared surface, mixing by mix I n placed method with Rotovater at OMC and compacting with in layers with smooth wheeled Vibratory Roller to achieve the desired density, complete as per MoR &H clause 401& as directed by Engineer Incharge including all machine charges & including all labour, T& P etc req for proper completion of work. Analysis rate
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. DSR 2023 I.NO 10.2
Applying priming coat: with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work including cost of all materials,labour T&P etc. Required for paper completion of work.so2023 ch 15i.n 9
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture. DSR-2023, Item No-13.48.3
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. DSR-2023, Item No-13.62.1
Providing and placing in position 100 mm thick factory made machine batched & machine mixed Precast RCC Rectangular Covers on drains of footpath of various sizes, of M-25 grade cement concrete for RCC work, including cost of centering, shuttering, reinforcement of 8 mm dia TMT bars of Fe 500 grade @ maximum 100mm c/c on both ways , neat cement punning on finished surface, properly encased on all edges with 1.6 mm thick , 100 mm wide MS sheet duly painted over priming coat , reinforcement to be welded at edges with MS sheet and providing 2 Nos. 12 mm dia bar for hooks etc i/c cost of cartage, all leads & lift, handling at site etc. all complete as per direction of Engineer-in-Charge.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 2023 I.NO 5.1.2
Fencing with RCC post place at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fxed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used DSR 2023 Item no 16.7.1
1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 2023 I.NO 4.1.3
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. DSR 2023-24 I.NO 5.22.6
Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platform dsr 2023 i.no 5.9.3
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
TD.pdf
Tender Documents • 2.20 MB
BOQ_2001856.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid