SE BSR Circle PWD Bulandshahr
SE BSR Circle PWD Bulandshahr
Construction work of boundary wall and watchman room around the land of Public Works Department near the fire station located on Hamidpur-Sikandrabad-Kuchesar road in Block BB Nagar of District Bulandshahr
2026_CEMRT_1127082_1
3019/96M/E-Tender/Bsr Circle/2025-26 Dt.16.03.26
Open Tender
Civil Works - Buildings
Percentage
180 days
Bulandshahr
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹6.1 L
Yes
SE BSR Circle PWD Bulandshahr
25 Mar 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
20 Mar 2026 - 23 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width aswell as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil.(as per D.S.R. item No:2.6.1).Including all taxes, royalties, supply of all materials,labours, tools & plants etc. required for proper compeletion of the work.(All compelete but excluding G.S.T.) | |||||
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominalsize derived from natural sources) (as per D.S.R. item No:4.1.6).Including all taxes, royalties, supply of all materials,labours, tools & plants etc. required for proper compeletion of the work.(All compelete but excluding G.S.T.) | |||||
| 3Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand). (as per D.S.R. item No:6.1.1).Including all taxes, royalties, supply of all materials,labours, tools & plants etc. required for proper compeletion of the work.(All compelete but excluding G.S.T.) | |||||
| 4Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand). (as per D.S.R. item No:6.4.1).Including all taxes, royalties, supply of all materials,labours, tools & plants etc. required for proper compeletion of the work.(All compelete but excluding G.S.T.) | |||||
| 5Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (as per D.S.R. item No:5.2.2).Including all taxes, royalties, supply of all materials,labours, tools & plants etc. required for proper compeletion of the work.(All compelete but excluding G.S.T.) | |||||
| 6Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.. (as per D.S.R. item No:5.22.6).Including all taxes, royalties, supply of all materials,labours, tools & plants etc. required for proper compeletion of the work.(All compelete but excluding G.S.T.) | |||||
| 712 mm cement plaster of mix :1:4 (1 cement: 4 coarse sand). (as per D.S.R. item No:13.4.1).Including all taxes, royalties, supply of all materials,labours, tools & plants etc. required for proper compeletion of the work.(All compelete but excluding G.S.T.) | |||||
| 8Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm). (as per D.S.R. item No:13.46.1).Including all taxes, royalties, supply of all materials,labours, tools & plants etc. required for proper compeletion of the work.(All compelete but excluding G.S.T.) | |||||
| 9Structural steel work in single section, fixed with or without connectingplate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.. (as per D.S.R. item No:10.1).Including all taxes, royalties, supply of all materials,labours, tools & plants etc. required for proper compeletion of the work.(All compelete but excluding G.S.T.) | |||||
| 10Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work. (as per D.S.R. item No:13.61.1).Including all taxes, royalties, supply of all materials,labours, tools & plants etc. required for proper compeletion of the work.(All compelete but excluding G.S.T.) | |||||
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.35 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Tendernotice_2.pdf
PDF • 1.69 MB
BOQ_2102131.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .