| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.4 LAccepted-AOC | ₹58.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹59.0 LRejected-Finance | ₹59.0 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | BALA SEENI AYYALU CONTRACTER L2 | MR.K.MARIALOUISPANDIAN L1 |
|---|---|---|---|---|---|
| 1.00Providing 7 Nos Cement Concrete Road at Sayamalai Panchayat in Kuruvikulam Panchayat Union in Tenkasi District under CGF Savings and Interest Pack No.KKLM01 | |||||
| 2.001.Providing CC Pavement in East Street at Arachipetty Village in Sayamalai Panchayat in Kuruvikulam Panchayat Union. | |||||
| 3.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 8.99 | Cum | 199.82 ₹1,796.38 | 197.82 ₹1,778.4 Lowest |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 41.49 | Cum | 5,648.12 ₹2,34,340.5 | 5,591.64 ₹2,31,997.14 Lowest |
| 5.00 | Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155) | 101.12 | Sqm | 368.65 ₹37,277.89 | 364.96 ₹36,904.76 Lowest |
| 6.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. | 10.34 | Cum | 6,408.68 ₹66,265.75 | 6,344.6 ₹65,603.16 Lowest |
| 7.00 | Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 37 | Cum | 209.45 ₹7,749.65 | 207.36 ₹7,672.32 Lowest |
| 8.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum | 30.33 | Cum | 7,682.88 ₹2,33,021.75 | 7,606.05 ₹2,30,691.5 Lowest |
| 9.00 | Supllying and fixing Bitumenpad 12mm thick for expansion joints at every 4.50m intervals inculding cost of material conveyance to site,cutting finishing etc., complete. | 10.13 | Sqm | 514.09 ₹5,207.73 | 508.95 ₹5,155.66 Lowest |
| 10.002.Providing CC Pavement in Kulakkara samy kovil Street at Arachipetty Village in Sayamalai Panchayat in Kuruvikulam Panchayat Union. | |||||
Tender Value
₹59.2 L
EMD Value
₹60,000
Closing Date
3 Mar 2026, 3:00 pmClosed
Project Director
DRDA,Tenkasi
Providing 7 Nos Cement Concrete Road at Sayamalai Panchayat in Kuruvikulam Panchayat Union in Tenkasi District under CGF Savings and Interest fund 2025-26 Pack No.KKLM01
2026_RDTN_664479_7
DIPR/1306/Tender/2026/SPL Fund TSI
Open Tender
Civil Works
Works
120 days
DRDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹60,000
DRDA,Tenkasi
4 Aug 2026
23 Feb 2026
3 Mar 2026
23 Feb 2026
3 Mar 2026
23 Feb 2026
27 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing 7 Nos Cement Concrete Road at Sayamalai Panchayat in Kuruvikulam Panchayat Union in Tenkasi District under CGF Savings and Interest Pack No.KKLM01 | - | - | - | - |
| 2 | 1.Providing CC Pavement in East Street at Arachipetty Village in Sayamalai Panchayat in Kuruvikulam Panchayat Union. | - | - | - | - |
| 3 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 8.99 | Cum | 197.84 | ₹1,778.58 |
| 4 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 41.49 | Cum | 5,592.2 | ₹2,32,020.38 |
| 5 | Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155) | 101.12 | Sqm | 365 | ₹36,908.8 |
| 6 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. | 10.34 | Cum | 6,345.23 | ₹65,609.68 |
| 7 | Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 37 | Cum | 207.38 | ₹7,673.06 |
| 8 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum | 30.33 | Cum | 7,606.81 | ₹2,30,714.55 |
| 9 | Supllying and fixing Bitumenpad 12mm thick for expansion joints at every 4.50m intervals inculding cost of material conveyance to site,cutting finishing etc., complete. | 10.13 | Sqm | 509 | ₹5,156.17 |
| 10 | 2.Providing CC Pavement in Kulakkara samy kovil Street at Arachipetty Village in Sayamalai Panchayat in Kuruvikulam Panchayat Union. | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Document.pdf
Tender Documents • 1.20 MB
BOQ_798289.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].