Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.0 LAccepted-AOC 195 FLAT NO 5068 2ND FLOOR MODERN HOUSING COMPLEX MANIMAJRA CHANDIGARH | CHANDIGARH | CHANDIGARH | CHANDIGARH | ₹23.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹23.4 LRejected-Finance 2313 3 SECTOR 45 C CHANDIGARH | ₹23.4 L | L2 | Rejected-Finance L2 |
Tender Value
₹26.2 L
EMD Value
₹52,411
Closing Date
17 Jul 2026, 3:00 pmClosed
Executive Engineer SWM MC Chd
Room No. 612 6th floor MC Building Sector 17 Chandigarh
Strengthening of Storm water drainage system for smooth disposal of rain water at various locations in Sector-43, Chandigarh.
2026_MCC_93935_1
MCC/EE/SWM/2026/66
Open Tender
Civil Works
Percentage
180 days
Chandigarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
₹52,411
31 Jul 2026
10 Jul 2026
17 Jul 2026
10 Jul 2026
17 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1:5 m in width or 10 sqm or plan) including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soils. (DSR 2.8.1) | 1,072.76 | P.Cum | 185 | ₹1,98,460.6 |
| 2 | Carriage of Material by Mechanical Transport including loading, unloading and stacking Earth up to 3 km (DSR 1.1.2) | 430 | P.Cum | 150 | ₹64,500 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – All work up to plinth level: 1:5:10 (1 cement : 5 manufactured sand derived from recycled concrete Aggregate (RCA): 10 graded stone aggregate 40 mm nominal size (DSR 4.1.10A) | 16.93 | P.Cum | 4,000 | ₹67,720 |
| 4Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : (DSR 19.6) | |||||
| 4.01 | 450 mm dia. R.C.C. pipe (DSR 19.6.5) | 304.88 | P.Mtr | 1,250 | ₹3,81,100 |
| 4.02 | 300 mm dia. R.C.C. pipe (DSR 19.6.4) | 129.19 | P.Mtr | 820 | ₹1,05,935.8 |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) Cement mortar 1:4 (1 cement : 4 coarse sand) (DSR 6.1.1) | 136.89 | P.Cum | 5,900 | ₹8,07,651 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand i/c manufactured sand derived from Recycled concrete Aggregate (RCA) upto 25% : 4 graded stone aggregate 40 mm nominal size Recycled concrete Aggregate (RCA) upto 25%). (NSI based on DSR 4.1.4) | 13.08 | P.Cum | 5,700 | ₹74,556 |
| 7 | 12 mm cement plaster finished with a floating coat of neat cement of mix 1:4 (1cement: 4 fine sand) (DSR 13.7.2) | 555.99 | P.Sqm | 305 | ₹1,69,576.95 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform. (DSR 5.9.3) | 54.37 | P. Sqm | 610 | ₹33,165.7 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 12.44 MB
BOQ_115119.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].