Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 CrAdmitted-Finance | -9.98% | ₹3.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.2 Cr+₹19.8 L (6.64%)Admitted-Finance | -4.00% | ₹3.2 Cr+₹19.8 L (6.64%) | L2 | Admitted-Finance |
| 3 | L3₹3.3 Cr+₹33.0 L (11.1%)Admitted-Finance R O FIRDOUS COLONY BUCHPORA SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | +0.00% | ₹3.3 Cr+₹33.0 L (11.1%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
Tender Value
₹3.9 Cr
EMD Value
₹7.8 L
Closing Date
20 Jun 2026, 2:00 pmClosed
Ex. Engineer R and B Division Shopian
Shopian
Restoration,Renovation and Development of Kapal Mochan Temple at Nagbal Deegam Shopian.
2026_PWDJK_311627_1
13/1511-20/RnB/SPN/e-tender of 05-06-2026
Open Tender
Civil Works
Percentage
540 days
Shopian
Please refer Tender documents.
16 documents required · 16 mandatory
₹5,500
Ex. Engineer R and B Division Shopian
₹7.8 L
Superintending Engineer PWD (RnB) Circle Pulwama/S
24 Jul 2026
5 Jun 2026
23 Jun 2026
6 Jun 2026
20 Jun 2026
6 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of New Kapal Mochan Temple. | |||||
| 2 | Earth work in excavation by Mechanical means (Hydraulic Excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All Kinds of soil | - | Cum | 0.2 | - |
| 3 | Providing and laying stone soling duly hand packed in maintaning level and section including all carriages complete | 1 | Cum | 0.8 | ₹0.8 |
| 4Providing and laying in position cement concrete 1:4:8 (1 Cement:4 Corase sand: 8 grade stone aggregate 40 mm nominal size crushed including curing but excluding the cost of centring and shuttering. All work upto plinth level including all carriages complete | |||||
| 5 | Providing and laying in position of reinforced cement concrete 1:1.5:3 (1 Cement, 1.5 Corase sand: 3 grade stone aggregate 20mm nominal size crushed including curing but excluding the cost of cantering, shuttering, finishing and reinforcement all work upto plinth level including all carriage complete | 1 | Cum | 0.2 | ₹0.2 |
| 6 | Providing and laying in position cement concrete 1:2:4 (1
Cement:2 Corase sand: 4 grade stone aggregate 20 mm
nominal size crushed including curing but excluding the
cost of centring and shuttering. All work upto plinth level
including all carriages complete | 1 | Cum | 0.4 | ₹0.4 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centering, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including all carriages complete | - | Cum | 0.4 | - |
| 8 | Reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all
complete Thermo-Mechanically Treated bars of grade Fe 500D or more. Inculding all carriages complete | 1 | Kgs | 0.8 | ₹0.8 |
| 9Centering and shuttering (fresh kit ply) including strutting, propping etc. and removal of form work including applying of shuttering oil: | |||||
| 9.01 | Foundations, footings, bases of columns etc. for mass concrete. | 1 | Sqm | 0.2 | ₹0.2 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.58 MB
Tendernotice_2.pdf
PDF • 1.65 MB
BOQ_1009004.xls
BOQ • 1.03 MB
extension_KP.pdf
PDF • 0.53 MB
Corrigendum.pdf
PDF • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .