Tender Value
₹17.6 Cr
EMD Value
₹35.2 L
Closing Date
13 Oct 2026, 2:30 pm
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
Above/Below/Par
HQ TENDER
30 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Similar Nature of Works means: "Survey including Setting out of alignment and preparation of land acquisition proposals for railway corridors/highways/ Metro projects".
49 conditions · 6 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tender/technical bid will be evaluated based on bid capacity formula detailed as Annexure-VI and proforma-II failing which offer shall be considered as incomplete and will be rejected summarily. (Applicable for works costing more than Rs.10.00 crore).
Tenders have been invited for and on behalf of the President of India for the work mentioned as per NIT.
Tender documents are not transferable .
It is understood that you are agreed to abide by the conditions those are laid down in the tender document when you submit the tender.
The tender document includes various chapters, drawings and annexures as enclosed, those are integral parts of the tender documents.
Rates enter in to rate page shall only be considered. Rates offered in any other form /letter by the tenderer shall not be considered.
Tenders other than in form of e-Tendering shall not be accepted against this tender. For this purpose, tenderers are required to submit their offer in IREPS.
In case of any difficulty faced by the tenderer while submitting their bid in the IREPS website assistance from help desk available with the website may be sought.
Railway Administration will not be responsible for any delay/difficulties /inaccessibility of the down loading facility for any reason whatsoever. In case of any discrepancy between the tender documents down loaded from internet and the master copy available in the offices, the latter shall prevail and will be binding on the tenderer(s). No claim on this account will be entertained.
Joint venture will be permitted in the tender value more than Rs.10.00 Crs.
Tenderer(s) has to go through the "Guideline & Conditions" of JOINT VENTURE included in Tender document carefully. Non- compliance of any conditions mentioned in the guideline of JV is liable to result in the tender being rejected.
General information about the project/work is attached separately. However the tenderer(s) are advised to visit the site for appreciation before submitting of tender.
Name & mailing address of the Tenderer(s) shall be clearly mentioned in ENGLISH language.
All the information requested for Tender shall be answered in the ENGLISH language. Where information is provided in another language, this shall be accompanied by a translation of its pertinent parts into ENGLISH. This translation will govern and be used for interpreting the information.
The railway reserves the right to:
Amend the scope and value of the work.
Reject or accept any tender; and
Cancel the tender process and reject any or all tenders, at any time.
The tenderer(s) have to fill up all the documents as stated in document.
Tenderer(s) are compulsorily required to indicate page number in the check list against relevant documents submitted by him / them.
In case of two packet system of tendering, the Second packet (Finance Bid) of only eligible tenderers found in the first packet (Technical Bid) will be opened.
Incomplete tenders are liable to be rejected without further correspondence.
If any one or more of the detailed information furnished in the tenderer's documents is proved to be false at any stage, the contractor/ firm will be debarred then and there, from all the commitments connected with the tender and his/their tender/contract will be rejected/terminated and further action will be taken as per extant rules.
Clarification of Bids: To assist in the examination, evaluation & comparison and prequalification of the Tender, the Railway may, at its discretion, ask any Bidder for a clarification of its Bid. Any clarification submitted by a Bidder that is not in response to a request by the Railway shall not be entertained or considered. The Railway request for clarification and the response of the bidder in this regard shall be in writing. However, if a Bidder does not provide clarification of its bid by the date and time communicated in the Railway request for clarification, the bid shall be evaluated as per the documents submitted along with the bid.
The Railway reserves the right to reject any or all offers without assigning any reasons and his decision shall be final and binding.
Clause 6 (Care In Submission Of Tenders), Part-I of Standard General Conditions of Contract - 2022.
(a)(i) Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the r a t e s he enters in the tender f o r m s a r e adequate and all inclusive t o accord w i t h t h e provisions in Clause-37 o f the Standard General Conditions o f Contract f o r t h e completion of works to the entire satisfaction of the Engineer.
(ii) Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017(CGST)/ Integrated Goods and Services T a x A c t , 2017(IGST)/ Union Territory Goods and Services Tax Act, 2017(UTGST)/ respective state's State Goods and Services Tax Act (SGST) also, as notified b y Central/State G ov t & as amended from tim e t o tim e and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates.
(iii) The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to railway immediately a f t e r t h e a w a r d o f contract, without w h i c h no payment shall be released to the contractor. The contractor shall be responsible for deposition of applicable GST to the concerned authority.
(iv)In case the successful tenderer is not liable t o be registered under CGST/IGST/UTGST/ SGST Act, the railway shall deduct the applicable GST from his/their b i l l s u n d e r r e v e r s e charge mechanism (RCM) and deposit t h e same to the concerned authority.
PRICE VARIATION clause shall be applicable for tenders having value above Rs. 2 Crores.
The Bid Security shall be deposited either in cash through e payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure- VIA and shall be valid for a period of 90days beyond the bid validity period.
Tender notice attached shall also form part of tender document.
Rate Contract for facilitating Land Acquisition for Railway projects of Northeast Frontier Railway (Construction) in NFR Jurisdiction for a period of 3 years.
CE-CON-SUR-LA-2026-07~NFRCON
CE-CON-SUR-LA-2026-07
Open
Works - General
36 Months
Kamrup, Assam
₹0
₹35.2 L
15 Sept 2026
15 Sept 2026
29 Sept 2026
5 items across 1 schedule · ₹17,61,15,690 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Up dated Pre-construction survey including establishment of control points along the proposed alignment (with the help of previously ploted alignment or as directed by the Railway Engineer suiting the local condition), and establishment of vertical control by fly leveling on traverse points which will also act as temporary bench mark for vertical control along the corridor using auto level, taking topography by total station along the best suited route to undetake modification as required to avoid built up area and other obstructions with such longitudinal and transverse level in order to obtain the optimum alignment for new BG Railway line including taking details up to 100 m on either side of centre line for recording important features such as bridges, roads, rivers, nullahs, canals, overhead electric wire crossings, buildings etc. and all other incidental works, fly and fly back the bench mark level from Rly bench mark and GTS to site at every 500M. The work includes pegging out of alignment @ 50m centre to centre on straight and 20m centre to centre on curves (payment for concrete pillars is included) including setting out of transition curves and working out quantities of earthwork in cutting /filling, bridges (Minor/Major), tunnels, level crossings etc. The rate also includes submission of four copies of report. The survey is to be done in terms of Para-420 to 474 of Indian Rly. Code for Engg Deptt. 2003. The rate also includes preparation and submission of six copies of the folllowing and also provide softcopy in Autocad (i) Index map to scale 2.5 km to 1 cm (ii) Index plan (iii) Plan for station yards (iv) Project sheets with full detail as required as per latest Engg. Code. Note :- The levels shall be taken at every 20 meter interval and each 3 meter for cross section upto 30 meter beyond toe/edge of bank/ cutting of BG formation for cross section to work out earth work quantity ; Manufacturing , supplying and planting of concrete/RCC (1:2:4) pillars of different size at every 500m interval along the centre line of the alignment and at approaches of major bridges for Bench Marks of Curves etc. with contractor's own materials (cement, sand aggregate) labour, tools & plants including all royalties and taxes applicable. | Kilometre | 1500.00 | 18,101.22 | 2,71,51,830 |
| 2 | Drone Videography for the section in NFR jurisdiction covering Bihar, Assam, West Bengal , Arunachal Pradesh, Nagaland, Meghalaya, Mizoram, Manipur, Tripura & Sikkim by using UAV/Drone by capturing high resolution videography and delivering the geotagged videos along with a player facility to load and link image/drawings/other files etc. and linkage to GIS map like Google, Bhuvan etc. with overlay/sync facility should be available and row,alignment,structure, chainage and other important details can be incorporated in it. (As per Railway Board Letter No.2015/Track-1/24(1)/18/1 dated 09.10.2017 & No.2015/Track 1/24(1)/18/1 Vol- 1 dated 19.03.2019) . Deliverables include : 1. Raw 4k quality geotagged videos. 2. Merged Seamless Geo-tagged Video of at least 1920 X 1080 format (full HD) resolution with all annotations. 3. Facilities like Web and mobile (android and iOS) compatibility, Video Zoom in and Zoom out option, Different speed viewing option, Basic measurement function, Video download function, annotation addition including GPS coordinates, Various resolution viewing option, Visualising and comparing Geovideos of 2 different period in sync, option to take HD picture of any asset visible in video. 4. Desktop and Web based Geovideo application platform facility to load & link image/Drawings/other files etc. and linkage to GIS Map like Google, Bhuvan etc. with overlay/sync facility should be available. Right of Way as per L-section, alignment, structures, Chainage & other important details can be incorporated in it. (As per Railway Board Letter No.2015/Track-1/24 (1)/18/1 dated09.10.2017 & No.2015/Track 1/24 (1)/18/1 Vol -1 dated 19.03.2019) 5. Web based Geovideo application platform for entire contract currency period from issue of LOA as well as additional 1-year period from DOC/extended DOC. Secured login Id & password to access the videos and data 6. Submission of Videography/ digital data, images in DVD/External Drive to Dy. CE office as per instructions of Engineer in Charge. 7. Georeferenced Still images of important structures as decided by railway Engineer-in- charge. 8. Video Should be edited Showing All Obligation points. | Kilometre | 1500.00 | 7,221.99 | 1,08,32,985 |
| 3 | Preparation of Land Plans using Total Station / DGPS along the proposed alignment for identification and measurement of land to be acquired and properties lying in the proposed land, requires for superimposition of revenue record. It also includes collecting details such as owner of land and property, type of structure, numbers of floors, number of trees, land use pattern such as agriculture, commercial, barren, forest, etc. and collection of all necessary revenue survey maps and forest maps required for preparation of Land Acquisition proposals including mutation. Note: -Payment Schedule: Payment will be made when Land Plans are approved by Railway & State Officials. Districts involved. Land plans to be physically verified at field and presence of representatives mandatory during joint site visits with Land, Revenue and Forest officials. | Kilometre | 1500.00 | 11,039.58 | 1,65,59,370 |
| 4 | Preparation of Land Acquisition proposals in Ten Copies as per revenue departments requirements of concerned States including collection of property cards. Preparation of statement of area to be acquired along with Land owners detailes etc. This item includes submission of proposal in required format to respective revenue officials for the publication of notifications under various sections of Land Acquisition act with latest amendments or any other relevant act amended subsequently to accelerate acquisition of Land along with follow up for joint measurement order. | Kilometre | 1500.00 | 6,047.67 | 90,71,505 |
| 5 | Preparation of 20A in prescribed format and then subsequently assisting in complete Land Acquisition process following 20B, 20C, 20D, 20E, 20F, 20G, 20H, 20I or any other relevant sections of Land Acquisition Act and Liaisoning with Revenue Official after notification.The declaration of the same to all the owners of land by distribution of notice affixing the notice at notice board of every village office , Panchayat ,Tahsil office as well as announcement (Munadi) in every village by speaker for awareness and information to field Survey.. 2. Offset fixing on revenue Map with help of Revenue Official 3. Total boundary station Marking 4.Validation of record of missing khasra etc. Preparation Grievance sheet if any. 5.Joint Measurement along with Revenue Authority and Acquiring Agency (DEPARTMENT) for the purpose of acquisition of land. It will also include the cost of any surveying work, if required using theodolite or Total stations with all skilled/unskilled men power, equipment , tools and plants , all transportation etc. Complete making necessary arrangements for transferring the land title to NFR DEPARTMENT with all legal formalities like purchase of stamp papers, typing work involved handing /taking over of land ,attending the Revenue Department for necessary stamping and registration there of etc. | Kilometre | 1500.00 | 75,000 | 11,25,00,000 |
| Schedule total | ₹17,61,15,690 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
1.TopPage_1.pdf
ATTACHMENT
2Index_1.pdf
ATTACHMENT
3.CheckList_1.pdf
ATTACHMENT
4.NIT_1.pdf
ATTACHMENT
5.Appendix_3.pdf
ATTACHMENT
6GIofWork.pdf
ATTACHMENT
7.MainDOC_2.pdf
ATTACHMENT
8.CMB_2.pdf
ATTACHMENT
9MakeInIndia_2.pdf
ATTACHMENT
10.ScopeSpecialConditionsofWork.pdf
ATTACHMENT
11SpecialSpecification_compressed.pdf
ATTACHMENT
12PVCClausemain.pdf
ATTACHMENT
13.FinalForms.pdf
ATTACHMENT
TenderNotice_2.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .