Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.0 LAccepted-AOC | ₹49.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹49.4 LRejected-Finance NO 46 B CHURCH STREET VELLAGOUNDANPATTI VILLAGE AYYAPURAM POST KADAYANALLUR TALUK TENKASI DISTRICT | TENKASI | TAMIL NADU | 626140 | ₹49.4 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | MR.TAMIL SELVAN, CONTRACTOR L1 | ANTONY CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Construction of Kitchen Shed and Dinning Hall to Community Hall in Ramanathapuram Village and Panchayat | |||||
| 2.00Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete | |||||
| 3.00 | For Foundation | 131.46 | Cum | 263.65 ₹34,659.43 Lowest | 265 ₹34,836.9 |
| 4.00 | For Septic tank | 15.18 | Cum | 263.65 ₹4,002.21 Lowest | 265 ₹4,022.7 |
| 5.00 | Cement concrete 1:4:8 mix using 40mm ISS HBGS metal laid in layers not more than 15cm thick inculding cost and coveyance of all materials to site, labour charges for mixing ,laying,compacting and curing etc complete., For Foundation - Base Concrete | 32.49 | Cum | 5,376.35 ₹1,74,677.61 Lowest | 5,380 ₹1,74,796.2 |
| 6.00Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete | |||||
| 7.00 | Below Basement | 43.85 | Cum | 6,125.5 ₹2,68,603.18 Lowest | 6,130 ₹2,68,800.5 |
| 8.00 | Above Basement | 49.41 | Cum | 6,218.32 ₹3,07,247.19 Lowest | 6,225 ₹3,07,577.25 |
| 9.00 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site | 8,158 | kgs | 91.82 ₹7,49,067.56 Lowest | 95 ₹7,75,010 |
| 10.00Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. | |||||
Tender Value
₹50 L
EMD Value
₹50,000
Closing Date
3 Mar 2026, 3:00 pmClosed
Project Director
DRDA,Tenkasi
Construction of Kitchen Shed and Dinning Hall to community Hall Building in Ramanathapuram Panchayat in Sankarankovil Panchayat Union in Tenkasi District under CGF Savings and Interest Fund 2025-26 Package No. SNKL 5
2026_RDTN_664479_12
DIPR/1306/Tender/2026/SPL Fund TSI
Open Tender
Civil Works
Works
120 days
DRDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹50,000
DRDA,Tenkasi
4 Aug 2026
24 Feb 2026
3 Mar 2026
24 Feb 2026
3 Mar 2026
24 Feb 2026
27 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Kitchen Shed and Dinning Hall to Community Hall in Ramanathapuram Village and Panchayat | - | - | - | - |
| 2 | Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete | - | - | - | - |
| 3 | For Foundation | 131.46 | Cum | 263.78 | ₹34,676.52 |
| 4 | For Septic tank | 15.18 | Cum | 263.78 | ₹4,004.18 |
| 5 | Cement concrete 1:4:8 mix using 40mm ISS HBGS metal laid in layers not more than 15cm thick inculding cost and coveyance of all materials to site, labour charges for mixing ,laying,compacting and curing etc complete., For Foundation - Base Concrete | 32.49 | Cum | 5,379.04 | ₹1,74,765.01 |
| 6 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete | - | - | - | - |
| 7 | Below Basement | 43.85 | Cum | 6,128.56 | ₹2,68,737.36 |
| 8 | Above Basement | 49.41 | Cum | 6,221.43 | ₹3,07,400.86 |
| 9 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site | 8,158 | kgs | 91.87 | ₹7,49,475.46 |
| 10 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Documrnt.pdf
Tender Documents • 1.00 MB
BOQ_798913.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].