| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹84,306Accepted-AOC 2 116 K KARSHINI ILLAM NEW SUNDARAM NAGAR WEST KORAMPALLAM TUTICORIN 628 101 | TUTICORIN | TAMIL NADU | 628101 | 1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical BUILDING NO 69 30 BAJANAI KOIL STREET VADAPALANI CHENNAI 600 026 | CHENNAI | CHENNAI | TAMIL NADU | 600026 | - | Rejected-Technical BQR 1 not Satisfied. | |
| 3 | Rejected-Technical | - | Rejected-Technical BQR 1 not Satisfied |
Tender Value
₹1.2 L
EMD Value
₹1,100
Closing Date
28 Sept 2021, 2:00 pmClosed
CE / TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II BM Unit V Painting of Condensate Storage Tank inner area and overhauling boiler fill pump, hot well make up pumps and related valves including the cost of paint and other all required materials during 2021 2022 overhaul
2021_EB_210314_1
CE TTPS SE M II No 269 2021 2022
Open Tender
Miscellaneous Works
Item Rate
8 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹1,100
Yes
15 Nov 2022
11 Sept 2021
29 Sept 2021
11 Sept 2021
28 Sept 2021
11 Sept 2021
Charges for cutting and removal of corroded/damaged CST tank inner side wall panel, top panel and bottom plates, leading and lifting etc and devolution to central stores including all consumables such as oxygen acetylene gas etc and T&P’s complete.
Charges for welding eroded initial welding joints in the CST tank inner side wall panel, top panel and bottom plates and including all consumables & T&P's etc.
Charges for cleaning & painting the inner surface of CST with one coat of Epoxy grey paint including the cost of paint and all other consumables.
Charges for leading, lifting and arranging platform and scaffolding where required in the boiler and dismantling after completion of work.
Hot well make up pump / Boiler fill pump overhauling: Dismantling of suction spool pieces, pump casing, shaft, sleeves, ring, impeller drive end bearing housing, non drive end bearing housing and overhauling of mechanism for any wear inside the casing impeller gland changing repairing of any parts reassembly of all above and aligning with motor
Replacement of valves / overhauling: Charges for changing the worn-out 150 NB / 40 gate valves, NRV or Diaphragm valve / overhauling of 150NB gate valves or NRV / Diaphragm valves in Hot well make up pump suction and delivery sides. o middle support Bars, releasing the chain blocks and normalizing.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .