Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.0 LAccepted-AOC CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | ₹8.0 L | 1 | Accepted-AOC Accepted as L-1 bidder |
| 2 | Rejected-Technical WARD NO 09 KOTMA COLLIERY DISTT ANUPPUR MP 484336 | ANUPPUR | MADHYA PRADESH | 484336 | - | - | Rejected-Technical L-3 Bidder, Tech Evaluation not done. |
| 3 | Rejected-Technical WARD NO 03 JAMUNA COLLIERY DISTT ANUPPUR MP 484444 | ANUPPUR | MADHYA PRADESH | 484444 | - | - | Rejected-Technical L-2 bidder, Tech Evaluation not done. |
Tender Value
₹16.6 L
EMD Value
₹20,700
Closing Date
31 Oct 2022, 5:00 pmClosed
General Manager (Operation)
Office of General Manager JK Area, Kotma, Anuppur, MP, 484444
Construction of 25 nos. ventilation stoppings in proposed development panel 40LE/19D and 34LE/19D and transporting, loading, unloading, laying haulage rope and track line (1120m) and dismantling of track line in Bartarai Colliery,JK Area.
2022_SECL_259836_1
SECL/JK/GM(O)/22-23/eT/27 Date 19.10.2022
Open Tender
Miscellaneous Works
Item Rate
240 days
BARTARAI COLLIERY, AMADAND UG SUB AREA, JK AREA
AS PER NIT
3 documents required · 3 mandatory
₹20,700
17 Feb 2023
19 Oct 2022
1 Nov 2022
19 Oct 2022
31 Oct 2022
20 Oct 2022
19 Oct 2022 - 24 Oct 2022
Amount
Groov cutting for stopping and manhole by chiesel/pick axe and hammer in
Hard stone
Coal/Shale
Brick masonary in UG in cement/lime mortar (1:6)
Height of 1.5meter from floor
Height of 1.5 meter to 3.0 and above
12 MM thick cement plasrer. (Both side).
Loading of all kinds of building material into tub at incline mouth.
Unloading of all kinds of material at destination point in UG.
Pushing of tubs for every 30.0 Mtr. After free pushing of first 30.0 meter (80/30=2.67 say 3pushing) so 3*6.25 =18.75
Transportation of material with tramming & pushing,coupling & uncoupling with haulage for a distance every 500 Mtr or part there of and bringing the empty tubs to surface.
Lead for 10 nos stopping - 1840/500=3.68 say 4 lead so 197.71*4= 790.84
Lead for 15 nos. stopping- 1550/500=3.1 say lead 3 so 197.71*3=593.13
Cleaning of malma, muck slurry and removal of debries from the galleries.
Cost of material
Cement
Brick (clamp brunt)
Transporting, loading, unloading and laying of track line
Transporting, loading, unloading of haulage rope
Laying of haulage rope
Dismantling of track line from 40LE panel and staking in 34 LE/17D for use of 34LE/19D panel
Total impact of GST for the purpose of CTC
DWIVEDI TRADERS
ANJANI KUMAR GAUTAM
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .