| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Technical NOCHIPALAYAM AUTHUR PO KARUR 2 | L1 | Admitted-Technical Conditions to be compiled | ||
| 2 | L2₹2.3 L+₹21,484.86 (10.2%)Admitted-Technical | L2 | Admitted-Technical Conditions to be compiled | ||
| 3 | L3₹2.4 L+₹30,345.51 (14.5%)Admitted-Technical | L3 | Admitted-Technical Conditions to be compiled | ||
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Additional Security Deposit copy not uploaded | ||
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Additional Security Deposit and Current year Income Tax copy also not uploaded |
Tender Value
₹3.0 L
EMD Value
₹3,000
Closing Date
11 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Executive Engineer, WRD
O/o the Executive Engineer, WRD, Mettur Dam Division, Mettur Dam-1
Special Repairs to the canal reach from mile 0-2-200 to 0-3-000 of distributory canal at mile 9-6-425 of Mettur East Bank Canal.
2026_WRD_716734_1
NIT NO.04/DB/MDD/2026-27
Open Tender
Civil Works
Lump-sum
90 days
at mile 9-6-425 of Mettur EBC
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹3,000
17 Nov 2026
22 Oct 2026
12 Nov 2026
22 Oct 2026
11 Nov 2026
22 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing the scrub jungle including removal of roots and disposing off etc., complete complying with standard specification and as directed by the departmental officers. | 1,525 | m2 | 6.36 | ₹9,699 |
| 2 | Earthwork Open excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc., complete complying with standard specification and as directed by the departmental officers | 19.35 | M3 | 131.89 | ₹2,552.07 |
| 3 | Plain Cement Concrete 1 : 4 : 8 (One Cement, four sand and Eight metal) using 40 mm jelly for foundation and basement including dewatering if found necessary and laid in layers of not more than 15cm tk etc.,complete complying with standard specification and as directed by the departmental officers | 4.85 | M3 | 5,690.6 | ₹27,599.41 |
| 4 | Supplying and erecting steel centering for sides and soffits including supports and strutting upto 3.0m height for Plain surfaces such as retaining walls using MS sheets of size 90 X 60 cms and "B.G.10" gauge, stiffened with M.S angles of size 25 X 25 X 3 mm by boarding laid over silver oak (country wood) joists of size 10 X 6.5 cms (spaced at about 90 cms centre to centre) and supported by casurina props of size 10 to 13 cms dia (spaced at 75 cm centre to centre at suitable intervels) etc., complete complying with standard specifications and as directed as directed by the departmental officers. | 42.5 | m2 | 1,089.1 | ₹46,286.75 |
| 5 | Supplying, fabricating and placing in position of RTS steel rods for all R.C.C works as per the design given including cost of steel and binding including cost of steel and binding wire etc., complete complying with standard specification. (The contractor will have to make his own arrangements for the supply of MS Plain Rod/RTS Rod and binding wire) for the work to work site as per GOMS. No. 303/PW(R1/Dept/Dt. 26.05.1998 & got tested before use on the work. | 1.55 | qtl | 9,192.45 | ₹14,248.3 |
| 6 | Reinforced Cement Concrete 1:2:4 (One Cement, Two sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying,finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 16.8 | M3 | 8,712.15 | ₹1,46,364.12 |
| 7 | Earthwork excavating and depositing on bank within initial lead and lift in hard stiff clay etc., conveying to site through lorries with an average lead of 5 kms including sectioning etc., complete complying with standard specification as directed by the departmental officers. | 23 | M3 | 190.8 | ₹4,388.4 |
| 8 | GST 18% | 25 | Nos | 5 | ₹125 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
Condition10.pdf
Tender Documents • 0.70 MB
BOQ_860968.xls
BOQ • 0.34 MB
10C96425.pdf
PDF • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .