Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.6 LAccepted-AOC | ₹24.6 L Quoted ₹25.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹26.1 LRejected-Finance HOUSE NO 214 WARD NO 2 TEHSIL SUJANPUR DISTT HAMIRPUR HP | HAMIRPUR | HIMACHAL PRADESH | 174304 | ₹26.1 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹27.1 LRejected-Finance BABU RAM THAKUR NIWAS BELOW UTTAM GAS AJANCY DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹27.1 L | L3 | Rejected-Finance Rejected |
| 4 | Not Admitted-Fee/PreQual/Technical R O VILL P O BHOLAR TEH JUBBAL DISTT SHIMLA HP | SHIMLA | HIMACHAL PRADESH | 171001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | RAJNEESH THAKUR L2 | SAHIL CHAUHAN L1 | Babu Ram L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in earth work and disposal of all excavated earth upto a lead of 20 metres and lift upto 1.50 metres, disposed earth to be levelled and neatly dressed complete in all respect within all lead and lifts as per the direction of Engineer-in-Charge. | 79.6 | Cum | 465 ₹37,014 | 460 ₹36,616 | 500 ₹39,800 |
| 2.00 | Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal size) and curing complete excluding cost of centering and shuttering including all leads and lifts. a) Foundation and plinth | 18.75 | Cum | 9,730 ₹1.8 L | 9,700 ₹1.8 L | 9,800 ₹1.8 L |
| 3.00 | Providing and laying cement concrete 1:4:8(1cement:4sand:8graded stone aggregate of 40mm nominal size)and curing complete excluding cost of form work including all leads and lifts: a) Foundation and Plinth. | 208.25 | Cum | 10,555 ₹22.0 L | 10,500 ₹21.9 L | 11,000 ₹22.9 L |
| 4.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in situ reinforced concrete and plain concrete work including all leads and lifts: | ||||||
| 4.01 | Vartical surface such as wall (any thickness). | 183.33 | Cum | 555 ₹1.0 L | 500 ₹91,665 | 550 ₹1.0 L |
| 5.00 | Boulder/Stone Filling behind the retaining wall. | 33.75 | Cum | 2,614 ₹88,223 | 2,600 ₹87,750 | 2,700 ₹91,125 |
Tender Value
₹25.6 L
EMD Value
₹51,104
Closing Date
13 Oct 2025, 11:00 amClosed
Executive Engineer
JSV Division Rohru
SH R R of 50 Mtr long R Wall at Rohru and Samala
2025_HPIPH_116913_1
No.JSV-RD-AB-Tnd/2025- 4320-70
Open Tender
Civil Works
90 days
near Radha Swami petrol pump
Tender Documents
7 documents required · 7 mandatory
₹500
Yes
EE Rohru
₹51,104
Yes
19 Jan 2026
4 Oct 2025
13 Oct 2025
4 Oct 2025
13 Oct 2025
4 Oct 2025
Amount
Excavation in earth work and disposal of all excavated earth upto a lead of 20 metres and lift upto 1.50 metres, disposed earth to be levelled and neatly dressed complete in all respect within all lead and lifts as per the direction of Engineer-in-Charge.
Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal size) and curing complete excluding cost of centering and shuttering including all leads and lifts. a) Foundation and plinth
Providing and laying cement concrete 1:4:8(1cement:4sand:8graded stone aggregate of 40mm nominal size)and curing complete excluding cost of form work including all leads and lifts: a) Foundation and Plinth.
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in situ reinforced concrete and plain concrete work including all leads and lifts:
Vartical surface such as wall (any thickness).
Boulder/Stone Filling behind the retaining wall.
RAJNEESH THAKUR (BID ID -568796)
Babu Ram (BID ID -568853)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid