Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹60.1 LAdmitted-Fee/PreQual/Technical/Finance 08 MOHD YOUSUF SHAH TREHGAM TREHGAM KUPWARA JAMMU KASHMIR 193224 UDYAM JK 12 0025751 | KUPWARA | JAMMU AND KASHMIR | 193224 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹62.1 L+₹2.0 L (3.41%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹67.4 L+₹7.4 L (12.3%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹71.9 L+₹11.8 L (19.7%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹74.6 L+₹14.6 L (24.2%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹73.2 L
EMD Value
₹1.5 L
Closing Date
18 Jun 2026, 4:00 pmClosed
Executive Engineer RnB Division Gurez
Executive Engineer RnB Division Gurez
Construction of Major Works 2 0ver 2 Roomed double Storey Building at MS Dangan Village Gulshanpora Block Bagtore
2026_PWDJK_312114_1
Fresh E-NIT No 15 of 2026-27 EE-RnB-Grz-2051-57 E-tendering Dated-10-06-2026
Open Tender
Civil Works
Percentage
720 days
Gurez
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,600
Executive Engineer RnB Division Gurez
₹1.5 L
Executive Engineer RnB Division Gurez
22 Jun 2026
11 Jun 2026
19 Jun 2026
11 Jun 2026
18 Jun 2026
11 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil | 5 | Sqm | 2,412 | ₹12,060 |
| 2 | Earth work in excavation by mechinical means(hydraulic excavation) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed within a lead of 50mtrs.All kinds of soil : | 86.76 | Cum | 256.85 | ₹22,284.31 |
| 3 | Providing and laying Stone solling in Foundation trenches / inside plinth including compacting, watering Including cost of carrriage and head loads . Etc complete . | 30.67 | Cum | 1,200 | ₹36,804 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 gradedstone aggregate 40mm nominal) | 21.43 | Cum | 5,202.9 | ₹1,11,498.15 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level - 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded aggregate 20 mm nominal size) | 20.72 | Cum | 7,788.4 | ₹1,61,375.65 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: in 1:2:4 (1 Cement : 2 coarse sand : 4 aggregate 40 mm nominal size ) | 50.99 | Cum | 6,540.45 | ₹3,33,497.55 |
| 7 | Reinforced Cement Concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement with 1:1.5:3 ( 1cement : 1.5 coarse sand : 3 graded stone aggregate of 20mm normal size aggregate. | 49.13 | Cum | 9,821.85 | ₹4,82,547.49 |
| 8 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) excld.carriage of bricks | 101.16 | Cum | 7,571.55 | ₹7,65,938 |
| 8.01 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 96 | Cum | 1,455.65 | ₹1,39,742.4 |
| 9 | Providing and fixing of wood work in frames of doors windows clestory windows wrought frame of first class imported wood /KD wood. Including cost of carrriage and head loads . Etc complete . | 2.06 | Cum | 55,000 | ₹1,13,300 |
stage.html
html • 0.03 MB
finance_1010321.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_1010321.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .