| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.7 LAccepted-AOC | L1 | Accepted-AOC LOWEST AND REASONABLE BID | |
| 2 | L2₹39.8 L+₹6.1 L (18.0%)Rejected-Finance | L2 | Rejected-Finance other than lowest | |
| 3 | L3₹41.8 L+₹8.1 L (24.1%)Rejected-Finance RCP GURUDWARA ROAD WARD NO 29 SURATGARH SRI GANGANAGAR 335804 | SURATGARH | SRI GANGANAGAR | RAJASTHAN | 335804 | L3 | Rejected-Finance other than lowest |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
28 Jun 2023, 6:00 pmClosed
Lt Col Priyesh Srivastava
GE (AF) SURATGARH
GRASS CUTTING AROUND AIRFIELD IN TECH AREA AND DRAIN CLEANING, CULVERT CLEANING AND ALLIED WORKS IN TECH AREA AT AF STN SURATGARH
2023_MES_599873_1
8078/E8
Open Tender
Civil Works
Item Rate
180 days
GE (AF) SURATGARH
AS PER TENDER DOCUMENTS
10 documents required · 10 mandatory
₹500
GE (AF) SURATGARH
₹80,000
Yes
30 Jun 2023
31 May 2023
30 Jun 2023
31 May 2023
28 Jun 2023
14 Jun 2023
Amount
BOQ (GRASS CUTTING AROUND AIRFIELD IN TECH AREA AND DRAIN CLEANING, CULVERT CLEANING AND ALLIED WORKS IN TECH AREA AT AF STN SURATGARH)
Cutting wild growth i.e. grass, shurbs, bushes etc upto 150 mm from ground level by using tractor with jungle jim including removing outside of runway field area, complete all as specified and directed by Engineer-in-Charge. Note:- Tenderer shall provide tractor with jungle jim, driver, diesel/petrol including T& P shall be included in quoted rate.
Cutting wild growth i.e. grass, shurbs, bushes etc upto 50mm from ground level by hand hold brush cuttter (diesel/petrol) including removing outside of runway field area, complete all as specified and directed by Engineer-in-Charge. Note:- Tenderer shall provide machine, bush cutter ,T&P & diesel/petrol and shall be included in quoted rate.
Cutting wild growth i.e. grass, shurbs, bushes etc upto 50mm from ground level by hand hold grass Sword with manual labour including removing outside of runway field area complete all as specified and directed by Engineer-in-Charge. Note:- Tenderer shall provide necessary T&P & and rate shall be included in quoted in rate.
Supply and stacking of 40mm graded crushed stone aggregate, complete all as directed by Engineer-in-charge. Note:- Stacking of aggregate in the shape of trapezoidal/ square/Rectangular
Supply and stacking of 63mm graded crushed stone aggregate, complete all as directed by Engineer-in-charge. Note:- Stacking of aggregate in the shape of trapezoidal /square/Rectangular
Supply and stacking of 63mm to 100mm graded crushed stone aggregate, complete all as directed by Engineer-in-charge. Note:- Stacking of aggregate in the shape of trapezoidal /square/Rectangular
Supply and stacking of fine aggregate (coarse sand), complete all as directed by Engineer-in-charge. Note:- Stacking of aggregate in the shape of trapezoidal /square/Rectangular
Supply only 400 micron polythene film (transparent) as per IS-2508 : 2016, complete all as directed by Engineer-in-Charge.
S&F for self adhesive reflective tape background including preparation of surfaces as taking down of existing self adhesive reflective tape background including alphabets/numbers/letters in DTGM/cautionary boards/sign boards complete all as specified and directed. Note:- Alphabets/numbers/letters shall be measured and paid separately.
S&F for self adhesive retro reflective tape including preparation of surfaces as existing tape for alphabets/numbers/letters in DTGM/ cautionary boards/sign boards complete all as specified and directed. Note:- Qty shall be measured based on length/width and height of letters cut from a square/rectangular sheet.
M&L for replacement of existing sign board of size exc 0.36sqm and not exc 0.81sqm with following specifications or as directed by Engineer-in-Charge (a) Main frame for sign board shall be made of aluminium square/rectangular hollow section not less than 38.10mmx38.10mmx1.20mm including S&F of polycarbonate sheet of size exc 0.36sqm and not exc 0.81sqm both side of aluminium frame. (b) The height of bottom side of board shall be minimum 300mm above ground level or as per users requirement and the board shall be fixed minimum 300mm below ground level with PCC 1:4:8, type D2, (using 40 mm graded crushed stone aggregate). (c) The numbers/letters/digit/sign/lines/arrows, etc. made of retro reflective tape having reflective tape background shall be fixed over 2mm thick Polycarbonate sheet of approved colour. Note : Before procurement/supply, sample of board shall be produced by the contractor for approval of GE.
M&L for replacement of existing sign board of size exc 0.36sqm and not exc 0.81sqm with following specifications or as directed by Engineer-in-Charge (a) Main frame for sign board shall be made of aluminium square/rectangular hollow section not less than 38.10mmx38.10mmx1.20mm including S&F of polycarbonate sheet of size exc 0.36sqm and not exc 0.81sqm both side of aluminium frame. (b) The height of bottom side of Board shall be minimum 300mm above ground level or as per users requirement and the board shall be fixed minimum 300mm below ground level with PCC 1:4:8, type D2 (using 40mm graded crushed stone aggregate). (c) The numbers/letters/digit/sign/lines/arrows, etc. made of retro reflective tape having reflective tape background shall be fixed over 2mm thick polycarbonate sheet of approved colour. Note : Before procurement/ supply, sample of board shall be produced by the contractor for approval of GE.
Forming 25mm wide new expansion joint using pre-formed filler board and filled with polyurethane joint filling sealant using mechanical means upto full depth (depth minimum above the back up rod dia 32mm) with minimum movement accommodation factor (MAF) + or - 30% conforming to the requirement of BS:5212, BS-4252 and EN-141875-2003 for hydrolysis/water resistance test including two coats of primer and providing 10 mm dia, approved quality closed cell polythene back up rod complete all as specified and directed. Note: (i) Edges of joints shall be rounded up by mechanical means at the time of final cutting. (ii) Initial cutting shall be carried out within 24-36 hours of casting. (iii) Final cutting, rounding of edges, use and waste of back up rod to avoid deposition of foreign materials in the joint upto final filling of joints shall be carried out after 28 days (iv) Applying masking tape on the edges of joint to prevent accidental slippage of sealant on top surfaces and to give a neat finish to the sealant and removing the masking tape after sealant is applied as required. Make Choksey chemicals/ Sika India Pvt. Ltd. / Pidilite Idustries Ltd/ M/s AMEYA Dye Chem Pvt Ltd (ADPL) / M/s Cipy Polyurethane Pvt Ltd / AI Stone / BASS / STP Ltd / Denson / BostiK
M&L for application of high strength quick setting repair mortar applied above PQC surface like PTT , dispersal, links & loops with bostic/Dr fixit/STP on the repaired surface after proper mixing in ratio of 10kg of HSQS :1.2 lit of water by volume and applying coats of the mix in a span of as per manufacture instruction all other details complete as per manufacturers specification or as directed by Engr-in-Charge.
M&L for application of SBR latex based polymer emulsion based single component styrene butadiene co-polymer applied above PQC surface like PTT , dispersal, links & loops with bostic/Dr fixit/STP on the repaired surface after proper mixing in ratio of latex and OPC cement 1:2 by volume and applying coats of the mix in a span of as per manufacture instruction all other details complete as per manufacturers specification or as directed by Engr-in-Charge.
Removal of soil/muddy soil by mechanical means (hydraulic excavator or tractor ) / manual means in drains , including dressing of sides and cleaning of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 500m from drain complete all as specified and directed.
Removal of soil/muddy soil/ grass/vegetation by mechanical means (Hydraulic excavator or tractor ) / manual means in drains (not exceeding 1.5 m in depth ), including dressing of sides and cleaning of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 250 m from drain complete all as specified and directed by Engr-in-Charge
Removal of soil/muddy soil/ grass/vegetation by manual means in drains under culverts including dressing of sides and cleaning of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 250 m from drain complete all as specified and directed by Engr-in-Charge
Removal of soil/muddy soil/ grass/vegetation by mechanical means (Hydraulic excavator or tractor ) / manual means in drains (exceeding 1.5 m in depth ), including dressing of sides and cleaning of bottoms, lift more than 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 250 m from drain complete all as specified and directed by Engr-in-Charge
Rough excavation not exceeding 1.50 metre deep for cleaning existing drains and bed of culverts over the drain including cutting of small bushes, small tree girth not exc 30 cm, complete all as specified and directed by Engineer-in-Charge.
Spreading and levelling excavated approved soil in layers not exceeding 25cm thick including watering and well ramming complete all as specified and directed.
Removal of muddy soil including cutting small bushes, small trees girth not exc 30 cm and removing excavated materials exc 1.5 KM and not exc 5.00 KM and depositing where directed at a level not exc 1.5 metre above the starting point in soil including levelling complete all as specified.
Removal of concertina coil dia 915 mm when stretched laid in drain before cleaning and relaying the same after drain cleaning including nailing/grouting with cement and securing etc complete all as specified and directed by Engineer-in-Charge.
De-watering of septic tanks/soakage wells and sewage line/flood sump/Drain by pumping with trolley mounted pump sets including carrying the waste water in closed containers and unloading it out side the MoD land at location shown by Engr-in-Charge at a distance n. exc 5 km from the starting point including removing the existing manholes cover and replacing the same, septic tanks/ soakage wells of any size/depth complete all as specified and as directed by the Engr-in-Charge
Demolition of brick work or stone boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches , pillars etc & removing debries out of MoD land, complete all as specified and directed by the Engineer-in-Charge.
Demolition of bricks (laid flat or on edge) or brick tiles in floors, channels, kerbs, aprons, etc. (each layer), laid dry or laid dry and pointed, complete all as specified and directed by Engineer-in-Charge.
M&L for brick work using sub class 'B' bricks straight or curved on plan exceeding 6 mtr mean radius built in CM 1:4, complete all as specified and as directed by the Engr-in-charge
Brickwork with sub class 'B' bricks , straight or curved on plan not exc 6m mean raidus (except brick) built in cement mortar 1:4 , complete all as specified and directed by Engineer-in-Charge. Note: Servicable bricks retrieved from item no 26 shall be used after proper cleaning and washing of old bricks.
Bricks laid on edge, using sub class ‘B’ bricks old size, grouted in cement mortar 1:6 and pointed in cement mortar 1:3 as in flooring laid to herring-bone pattern or diagonally including necessary surface dressing in any type of soil complete all as specified and directed by Engineer-in-Charge.
Demolition of cement concrete (below or above ground level) ground floors and paving any description and in any position and removal of rubbish in low lying area complete all as specified and directed by Engineer-in-Charge.
M&L for plain cement concrete 1:4:8 type D2 using 40mm graded stone aggregate as in foundations complete all as specified and as directed by the Engr-in-charge
M&L for PCC 1:3:6 type C1 using 20mm graded stone aggregate as in drains, surface channels complete all as specified and as directed by the Engr-in-charge
M&L for raking out joints and pointing to brick work or brick tiles, laid flat, in floors, surface channels, roofs, etc, complete all as specified and directed by Engineer-in-Charge.
Extra for forming fair finished drain or channel 30cm inner girth in cement concrete using extra cement including forms, moulds mitre/stopped ends complete all as specified and as directed by the Engr-in-charge
M&L PCC 1:2:4 type B1 using 20 mm grade aggregate as in copings, cills and other similar works all as specified and directed by Engineer-in-charge
Taking down of cement plaster on brick or stone wall including raking out joints, hacking for key, scrubbing down with water and removal of rubbish in low lying area complete all as specified and directed by Engineer-in-Charge.
M&L for rendering 15mm thick in cement mortar 1:4 on fair faces of brick/concrete including finishing the surface even and fair without using extra cement complete all as specified and directed by Engineer-in-Charge.
Contract Amount shall be derived after deducting the amount of Schedule of Credit in General Summary on serial page No 17 of tender documents.
H S BUILDERS
SRI SAI CONSTRUCTION COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .