| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.0 LAccepted-AOC | ₹14.0 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹14.8 LRejected-AOC | ₹14.8 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M/S. SRI RAJALAKSHMI RNTERPRISES L2 | M/S. KALPANA INDUSTRIES L1 |
|---|---|---|---|---|---|
| 1.00RENEWAL BT FROM PANAPAKKAM TO PATTARANTHANGAL ARUNTHATHI COLONY ROAD @ PANAPAKKAM PANCHAYAT IN 0/0-1/044 KM | |||||
| 2.00 | Clearing the Scrub jungles with uprooting as per standard specifications | 375.84 | m2 | 10 ₹3,758.40 | 6 ₹2,255.04 |
| 3.00 | Earth work excavation in all soils and subsoils to full depth as may be directed except hard rock requiring blasting but inclusive of shoring ,strutting,sectioning etc as per ss20A. | 281.88 | m3 | 300 ₹84,564 | 245 ₹69,060.60 |
| 4.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | 8.74 | m2 | 6,500 ₹56,810 | 6,145 ₹53,707.30 |
| 5.00 | Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | 3,142 | m2 | 35 ₹1.1 L | 28.5 ₹89,547 |
| 6.00 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5 | 78.55 | m3 | 12,000 ₹9.4 L | 11,745 ₹9.2 L |
| 7.00Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | |||||
| 8.00 | KM 0/0-1/0 | 60 | m3 | 750 ₹45,000 | 745 ₹44,700 |
| 9.00 | KM 1/0-1/044 | 2.64 | m3 | 760 ₹2,006.40 | 750 ₹1,980 |
| 10.00 | Provision For HM Stone Charges | 4 | nos | 770 ₹3,080 | 755 ₹3,020 |
Tender Value
₹14.1 L
EMD Value
₹35,400
Closing Date
13 Feb 2026, 3:00 pmClosed
Block Development Office Tiruvalangadu
Block Development Office Tiruvalangadu
RENEWAL BT FROM PANAPAKKAM TO PATTARANTHANGAL ARUNTHATHI COLONY ROAD at PANAPAKKAM PANCHAYAT IN 0/0-1/044 KM
2026_RDTN_652635_1
2016/2025/A2/ Panapakkam CC Road
Open Tender
Civil Works
120 days
Block Development Office Tiruvalangadu
Class III
4 documents required · 4 mandatory
₹0
₹35,400
Yes
17 Feb 2026
7 Feb 2026
13 Feb 2026
7 Feb 2026
13 Feb 2026
7 Feb 2026
RENEWAL BT FROM PANAPAKKAM TO PATTARANTHANGAL ARUNTHATHI COLONY ROAD @ PANAPAKKAM PANCHAYAT IN 0/0-1/044 KM
Clearing the Scrub jungles with uprooting as per standard specifications
Earth work excavation in all soils and subsoils to full depth as may be directed except hard rock requiring blasting but inclusive of shoring ,strutting,sectioning etc as per ss20A.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Provision For HM Stone Charges
Provision For KM Stone Charges
Provision For Sign Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_782536.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
btroadpanapakkam.pdf
Tender Documents • 1.22 MB
BOQ_782536.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid