| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.4 LAccepted-AOC 267 1 B KULAKARAI STREET PATTRAVAKKAM NEXT TO SIDCO 145 CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹29.4 L Quoted ₹32.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹38.4 LRejected-AOC NO 16 11 ANBAZHAGAN NAGAR MAIN ROAD MINJUR 601203 | THIRUVALLUR | TAMIL NADU | 601203 | ₹38.4 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | MICRO SPARES L1 | SAHIRA ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.10 | Charges for Repair / renewal of defective / eroded Eco coils of size 44.5 mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test. Including consumable and hire charges for T&P's. | 320 | times | 4,900 ₹15.7 L | 5,800 ₹18.6 L |
| 1.20 | Charges for / Renewal of dummied / sagged eco coils 5nos of size of 44.5 mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder. Including consumable and hire charges for T&P's. | 300 | Nos | 4,900 ₹14.7 L | 5,800 ₹17.4 L |
| 2.00 | ARC FILLING: Grinding of Boiler tubes for arc filling of size 150 mm x 25 mm2 area for 3 layer and Charges IBR Welder for Arc filling of area 150mmx25mm2 by 3 layer. Including consumable and hire charges for T&P's.
. | 8 | Nos | 5,200 ₹41,600 | 6,200 ₹49,600 |
| 3.00 | Charges for providing assistance in Boiler tube thickness survey and conducting Boiler tube thickness survey in Economiser coil area and hire charges for ultrasonic thickness gauge and T&P’s. | 700 | Points | 23 ₹16,100 | 25 ₹17,500 |
| 4.00 | Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work. Including consumable and hire charges for T&P's. | 1 | Time | 14,500 ₹14,500 | 16,500 ₹16,500 |
| 5.00 | Charges for fin welding by cleaning, surface preparation and welding. Including Consumable and hire charges for T&P's. | 20 | mtrs | 700 ₹14,000 | 900 ₹18,000 |
| 6.00 | Charges for fixing shrouding at erosion prone Boiler tubes & bends by Tag old/ new welding. Including consumable and hire charges for T&P's. | 40 | Nos. | 270 ₹10,800 | 400 ₹16,000 |
| 7.00 | Charges for conducting tube thickness survey by physical verification in boiler Economiser area, arranging necessary lighting inside the Boiler. Including consumable and hire charges for T&P's. | 1 | No. | 29,500 ₹29,500 | 35,000 ₹35,000 |
| 8.00 | Charges for cutting, removal of existing damaged cassette baffles which are formed like fissure, blister, twist, wrinkle, bulge from Economiser upper & lower bank coils and devoluted to stores. Including consumable and hire charges for T&P's. | 5 | Nos. | 1,500 ₹7,500 | 2,500 ₹12,500 |
| 9.00 | Charges for renewal of existing dislodged / worn out End shields/ cassette baffles which are provided in the various coil assemblies such as in the Eco & lower and upper bank to avert the flue gas erosion by new ones including the charges for transporting from stores to work spot, consumable and hire charges for T&P's. | 12 | Nos. | 1,050 ₹12,600 | 1,300 ₹15,600 |
Tender Value
Refer Docs
EMD Value
₹35,900
Closing Date
8 Jul 2025, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II Repair Rectification of eroded tubes in Economizer coil Renewal of dummied coil and other allied works during annual overhaul for the year 2025 26
2025_EB_573290_1
CE SE MI NCTPS I 55 25 26
Open Tender
Power/Energy Projects/Products
45 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹35,900
Yes
26 Mar 2026
25 Jun 2025
9 Jul 2025
25 Jun 2025
8 Jul 2025
25 Jun 2025
Amount
Charges for Repair / renewal of defective / eroded Eco coils of size 44.5 mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test. Including consumable and hire charges for T&P's.
Charges for / Renewal of dummied / sagged eco coils 5nos of size of 44.5 mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder. Including consumable and hire charges for T&P's.
ARC FILLING: Grinding of Boiler tubes for arc filling of size 150 mm x 25 mm2 area for 3 layer and Charges IBR Welder for Arc filling of area 150mmx25mm2 by 3 layer. Including consumable and hire charges for T&P's. .
Charges for providing assistance in Boiler tube thickness survey and conducting Boiler tube thickness survey in Economiser coil area and hire charges for ultrasonic thickness gauge and T&P’s.
Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work. Including consumable and hire charges for T&P's.
Charges for fin welding by cleaning, surface preparation and welding. Including Consumable and hire charges for T&P's.
Charges for fixing shrouding at erosion prone Boiler tubes & bends by Tag old/ new welding. Including consumable and hire charges for T&P's.
Charges for conducting tube thickness survey by physical verification in boiler Economiser area, arranging necessary lighting inside the Boiler. Including consumable and hire charges for T&P's.
Charges for cutting, removal of existing damaged cassette baffles which are formed like fissure, blister, twist, wrinkle, bulge from Economiser upper & lower bank coils and devoluted to stores. Including consumable and hire charges for T&P's.
Charges for renewal of existing dislodged / worn out End shields/ cassette baffles which are provided in the various coil assemblies such as in the Eco & lower and upper bank to avert the flue gas erosion by new ones including the charges for transporting from stores to work spot, consumable and hire charges for T&P's.
Charges for bending of various size of boiler tubes. Including consumable and hire charges for T&P's.
SAHIRA ENTERPRISES (BID ID -1394300)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_684970.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid