Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 LAccepted-AOC VILLAGE KAIRU DISTRICT BHIWANI | BHIWANI | HARYANA | 127021 | 1 | Accepted-AOC Rates are on lowest side | |
| 2 | 2₹1.2 L+₹10,839 (9.55%)Rejected-Finance 1506 SECTOR 16 17 HISAR SECTOR 16 17 HISAR 125001 | HISAR | HISAR | HARYANA | 125001 | 2 | Rejected-Finance Rates are on higher side as compare to L1 | |
| 3 | 3₹1.3 L+₹18,519 (16.3%)Rejected-Finance 58 6 GANDHI NAGAR JIND 126102 | JIND | JIND | HARYANA | 126102 | 3 | Rejected-Finance Rates are on higher side as compare to L1 | |
| 4 | 4₹1.3 L+₹20,919 (18.4%)Rejected-Finance | 4 | Rejected-Finance Rates are on higher side as compare to L1 | |
| 5 | 5₹1.4 L+₹30,519 (26.9%)Rejected-Finance | 5 | Rejected-Finance Rates are on higher side as compare to L1 |
| Sl No | Description | Qty | Unit | SUSHIL KUMAR L3 | Sanjeev Construction Company L4 | NEW POWER INDIA COMPANY L5 | Mahender Singh Contractor L2 | Naveen Kumar Contractor L1 |
|---|---|---|---|---|---|---|---|---|
| 1.10 | All Pumping set install at water works, Boosting station, Including of Pumps and Motor of various capacity including all electric fitting , Panel Board, starter,Cable, Volt Meter, Ampmeter etc. inside/outside Campus complete in all respects (August 2025 to March 2026 = Total 8 Months) | 8 | Per Month | 10,000 ₹80,000 | 1,300 ₹10,400 Lowest | 6,000 ₹48,000 | 5,180 ₹41,440 | 4,728.39 ₹37,827.12 |
| 1.20 | Comprehensive Maintenance and repair of existing distribution as well as head work pipelines of all types (DI/CI/AC/PVC) removal and relaying IPB, including IPB block if required, demolising C/C by Mechnical /Manual and all sizes at various depths, including new sluice valves, new non-return valves, leakages and repair of illegal/not functional Water supply connections. Work includes excavation on any surface, bailing out, refilling i.e. Soil etc. material and labour cost, machine/equipment hire Including cost and repair/replacement of new Sluice valves components of all sizes (M.S. spindle, G.M. chuck nut and CI special, nut bolts, rubber jain, glain dori, grease, etc.). Includes opening/fitting, carriage charges from site to workshop and back at site and all repair related works as per Engineer-in-Charge`s direction, complete in all respects. (August 2025 to March 2026 = Total 8 Months) | 8 | Per Month | 5,000 ₹40,000 | 7,000 ₹56,000 | 6,000 ₹48,000 | 5,180 ₹41,440 | 4,728.39 ₹37,827.12 Lowest |
| 1.30 | Provision for Consumeables Items i.e. Bush , cotton, Glain Dori, Grease, Lubricant oil, Mobil oil, Nut and Bolt, Rubber Sheet, Transformer Oil etc.(August 2025 to March 2026 = Total 8 Months) | 8 | Per Month | 1,500 ₹12,000 Lowest | 8,500 ₹68,000 | 6,000 ₹48,000 | 5,180 ₹41,440 | 4,728.39 ₹37,827.12 |
Tender Value
₹1.4 L
EMD Value
₹2,768
Closing Date
4 Aug 2025, 3:00 pmClosed
SHASHIKANT
Hisar PHED No. 2
Operation and Maintenance of Pumping Machinery, Leakages of Pipe line and consumeable
2025_HRY_461609_1
202530E3CADD 866A 4AD0 88F2 927F580B1D44565PUH
Open Tender
Civil Works
Works
250 days
BHOJRAJ GUNZAR
As per DNIT
3 documents required · 3 mandatory
₹500
₹2,768
Yes
23 Sept 2025
28 Jul 2025
4 Aug 2025
28 Jul 2025
4 Aug 2025
28 Jul 2025
Amount
All Pumping set install at water works, Boosting station, Including of Pumps and Motor of various capacity including all electric fitting , Panel Board, starter,Cable, Volt Meter, Ampmeter etc. inside/outside Campus complete in all respects (August 2025 to March 2026 = Total 8 Months)
Comprehensive Maintenance and repair of existing distribution as well as head work pipelines of all types (DI/CI/AC/PVC) removal and relaying IPB, including IPB block if required, demolising C/C by Mechnical /Manual and all sizes at various depths, including new sluice valves, new non-return valves, leakages and repair of illegal/not functional Water supply connections. Work includes excavation on any surface, bailing out, refilling i.e. Soil etc. material and labour cost, machine/equipment hire Including cost and repair/replacement of new Sluice valves components of all sizes (M.S. spindle, G.M. chuck nut and CI special, nut bolts, rubber jain, glain dori, grease, etc.). Includes opening/fitting, carriage charges from site to workshop and back at site and all repair related works as per Engineer-in-Charge`s direction, complete in all respects. (August 2025 to March 2026 = Total 8 Months)
Provision for Consumeables Items i.e. Bush , cotton, Glain Dori, Grease, Lubricant oil, Mobil oil, Nut and Bolt, Rubber Sheet, Transformer Oil etc.(August 2025 to March 2026 = Total 8 Months)
Mahender Singh Contractor (BID ID -1310134)
SUSHIL KUMAR (BID ID -1309960)
Sanjeev Construction Company (BID ID -1310078)
NEW POWER INDIA COMPANY (BID ID -1310115)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .