Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 LAccepted-AOC | 1 | Accepted-AOC Tender Finalished | |
| 2 | Rejected-Technical | - | Rejected-Technical Hightest Tender Value |
Tender Value
Refer Docs
EMD Value
₹1,760
Closing Date
7 Nov 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer(B.Pt)
Pappakudi Panchayat Union
Construction of Horizontal Soakpit at Kumarasamiyapuram - Pappakudi Panchayayt at Pappakudi Panchayat Union.
2023_RDTN_383473_2
15th CFC Block Panchayat A2/4210/2023
Open Tender
Civil Works
Works
90 days
Pappakudi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,760
Yes
11 Nov 2023
30 Oct 2023
7 Nov 2023
30 Oct 2023
7 Nov 2023
30 Oct 2023
Amount
Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth
Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
cement concrete 1:2:4 mix using 20 mm ISS metal including cost conveyance of all materials to site and labour charges for mixing, laying, and curing complete for 10 cum
Centering below GL: Supplying and erecting centering shuttering inclu necessary supports for plane surface in foundation and basement and in all floors for C column footing column plinth beam, beams, roof slabs, staircase steps, bed blo critical pier etc
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Filling the soak pit with 40mm metal as per specification
Colour washing two coats using approved colour pigments including cost conveyance of all materials to site and all labour charges etc complete
Collection and supply of Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Collection and supply of gravel and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
RCC Precast Slbs using RCC 1:2:4 using 20mm gauge hard broken granite stone jelly
MICHAEL ANTONY I
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_456934.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .