| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹68.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹69.4 L+₹1.2 L (1.78%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹73.5 L+₹5.3 L (7.76%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹99.3 L
EMD Value
₹2.0 L
Closing Date
7 Jul 2026, 4:00 pmClosed
Executive Engineer Jal Shakti PHE Division Kathua
Executive Engineer Jal Shakti PHE Division Kathua
BOQ
2026_PHE_313308_3
enit 22 of 2026-27
Open Tender
Civil Works - Water Works
Percentage
90 days
Kathua
SBD
2 documents required · 2 mandatory
₹3,000
Executive Engineer Jal Shakti PHE Division Kathua
₹2.0 L
14 Jul 2026
23 Jun 2026
8 Jul 2026
23 Jun 2026
7 Jul 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavatedearth as directed:
All kinds of soil. | 2,044 | Cum | 479.3 | ₹9,79,689.2 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 648 | Cum | 187.3 | ₹1,21,370.4 |
| 3 | Hand Packing of Stone into Crates excluding Cost of Stones and Crates | 1,944 | Cum | 371.15 | ₹7,21,515.6 |
| 4 | Supply of stones | 1,652.4 | Cum | 700 | ₹11,56,680 |
| 5 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge : Above 40 mm nominal bore | 440 | Mtrs | 121.65 | ₹53,526 |
| 6 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge : below 40 mm nominal bore | 280 | Mtrs | 109.65 | ₹30,702 |
| 7 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 80mmφ(M) | 300 | Mtr | 1,151.2 | ₹3,45,360 |
| 8 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc.
80mmφ(L) | 2,600 | Mtr | 878.25 | ₹22,83,450 |
| 9 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc.
65mmφ(L) | 1,000 | Mtr | 745.1 | ₹7,45,100 |
| 10 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc.
50mmφ(L) | 800 | Mtr | 532.8 | ₹4,26,240 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_1013946.xls
BOQ • 0.30 MB
Corrigendum22SASCIKAthua.pdf
PDF • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .