Tender Value
₹14.1 L
EMD Value
₹28,200
Closing Date
12 Oct 2026, 3:00 pmDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE OFFICER , (DR. JANARDAN PRASAD VERMA )
EO
NAGAR PARISHAD SHEIKHPURA
EXECUTIVE OFFICER (DR. JANARDAN PRASAD VERMA )
EO
Construction of R.C.C. Drain & Paver Block road from house of Umashankar shaw to Chandan Shaw house & from house of Ramsharan shaw to Chandrika Shaw house in ward no. 11.
140885
NIT NO- 07/2026-27_Group 34
Open Tender
CIVIL
Jamui
• Registration
• GST
• PAN
• ITR
• Tools and Equipment
• Existing Commitment
• Affidavit
• All other document as per NIT
CIVIL
PERCENTAGE
L1
1
9 documents required · 9 mandatory
₹2,500
Processing Fee: 1180
₹28,200
Office Nagar Parishad Jhajha
1 Oct 2026
1 Oct 2026
15 Oct 2026
5 Oct 2026
12 Oct 2026
5 Oct 2026
7 Oct 2026
B.O.Q. for :- Construction of R.C.C. Drain & Paver Block road from house of Umashankar shaw to Chandan Shaw house & from house of Ramsharan shaw to Chandrika Shaw house in ward no. 11.
(i) Estimated Cost Rs:- 1405062.00
(ii) Cost of B.O.Q Rs:- 2500.00
(iiI) Earnest Mony Rs:- 28200.00
(iV) Last date of Sale of B.O.Q :-
(v) Time of Completion :-
(vi) Date and Time of receiving Tender :-
(vii) Date and time of Opening the Tender :-
(Viii) Place of sale of B.O.Q & Reciving of Tender :- Nagar Parisad JhaJha
( iX) Issue to Name of Agency ) :- ………………………………………………………………………………
(x) Mode of payment :- D D / Case M R NO …………………………… Date …………………………
S.N. Item of Work Qty Unit Rate Amount
1 Earth work in excavation in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m . including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m (Bcd SOR 2.8.1) 82.63 M³ 360.70 29803.00
2 Excavating, supplying and filling of local earth (including royalty but excluding cairriage cost) by mechanical transport upto a lead of 3km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. If local earth is available at more than 3 km lead the actual lead must be approved by compitent authority. cairraiage of material will be paid seperately and calculated after deducting initial lead (Bcd SOR 2.25.A). 48.89 M³ 411.70 20128.00
3 Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete. (Bcd SOR 2.28) 26.45 M³ 287.30 7598.00
4 Providing brick fiat soling with designation 100A one brick joints filled with local sand including cost of watering, royalty aand all taxes, all complete as per approved desing, specification and direction of E/I .{S.O.R BCD item No 11.72} 161.48 M² 283.30 45747.00
5 Providing and laying in position cement concrete of specified grade exluding the cost of centring and shuttering-all work upto plinth level 1:3:6 (1 Cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) (Bcd SOR 4.1.5) 10.54 M³ 3434.00 36182.00
6 Brick work with bricks of class designation 100A in foundations and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand ) {S.O.R BCD item No 6.1.12/1} 24.41 M³ 5017.90 122492.00
7 Providind 12 mm cement plaster of mix: 1:4(1 cement: 4 coarse sand) with Neat cement punning 1:5 mm thick {S.O.R BCD item No 13.11.2 + 13.26} 69.70 M² 193.40 13480.00
8 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring ,shuttering, finishing and reinforcement-All work puto plinth level 1:1:5:3 (1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size) (Bcd SOR 5.1.2) 47.24 M³ 4688.30 221469.00
9 Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. (Bcd SOR 5.22.7) 3542.89 kg 92.60 328072.00
10 Providing and laying factory made coloured chamfered edge Cement Concrete paver blocks of required strength, thickness & size/shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of fine sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with jamuna sand and cutting of paver blocks as per required size and pattern,finishing and sweeping extra sand in footpath, parks, lawns, drive ways or light traffic parking etc.complete as per manufacturer’s specifications & direction of Engineer-in-Charge. 60mm thick C.C.paver block of M-35 grade with approved colour, design & pattern.{S.O.R BCD item No 11.78} 134.14 M² 714.00 95773.00
11 Centring and shuttering including strutting, propping etc. and removal of form for.foundation, footings,bases of columns etc. for mass concrete. {S.O.R BCD item No 5.9.1} 39.81 M² 211.60 8425.00
i Walls (any thickness) including attached pilasters. Butteresses, plinth and string courses etc {S.O.R BCD item No 5.9.2} 355.58 M² 375.10 133377.00
12 Carriage of material
ii Coarse Sand (15p+1k)=16 km. 32.61 M³ 584.50 19062.00
v Paver Blocks 4325.88 Nos 2338.60 10116.00
13 Difference Cost of Materials
i Cement 479.71 Bag 0.937 449.00
14 Add GST 5.36 % (Difference GST Rate) Rs 70615.00
15 Seigniorage Fee 10 % Rs 13006.00
16 Sign Board and Photography Rs 4000.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT NO- 07_2026-27.pdf
NIT • 2.34 MB
34.xlsx
NIT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .