Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹23.5 LAdmitted-Finance 11 G ASHOK PALACE 877 EAST PARK ROAD KAROL BAGH CENTRAL DELHI DELHI 110005 | CENTRAL DELHI | DELHI | 110005 | ₹23.5 L | Admitted-Finance |
| 2 | ₹51.9 LAdmitted-Finance PLOT NO 1201 PHASE 4 GIDC VITHAL UDHYOGNAGAR BEHIND BERGER PAINTS DISTRICT ANAND GUJARAT INDIA VITHAL UDHYOGNAGAR ANAND | ₹51.9 L | Admitted-Finance |
| 3 | ₹2.6 CrAdmitted-Finance 10 A KIRITSINH PARMAR 10 A KRISHNA INDUSTRIAL ESTATE NEAR SUKHRAMPURA POST OFFICE NAGERWELL HANUMAN ROAD RAKHIAL | ₹2.6 Cr | Admitted-Finance |
| 4 | ₹8.0 CrAdmitted-Finance 701 SWASTIK DISA CORPORATE PARK LBS MARG OPP SHREYAS CINEMA GHATKOPAR WEST MUMBAI MAHARASHTRA 400086 | MUMBAI SUBURBAN | MAHARASHTRA | 400086 | ₹8.0 Cr | Admitted-Finance |
| 5 | ₹9.7 CrAdmitted-Finance PLOT NO 129 NEAR KASHIRAM TEXTILE MILL NAROL ROAD AHMEDABAD GUJARAT 382405 | AHMADABAD | GUJARAT | 382405 | ₹9.7 Cr | Admitted-Finance |
| Sl No | Description | Qty | Unit | Aegis Valves Industries Pvt. Ltd. | Sap Indutries Ltd. | advance valves pvt ltd | OCEAN VALVES MANUFACTURING COMPANY | Panchvati Valves And Flanges Pvt.Ltd. | A.V.VALVES LTD | HAWA ENGINEERS LIMITED | oswal Industries Limited | VITON ENGINEERS PVT LTD | FLOWJET VALVES PVT. LTD. | nilon valves private limited | Flovel Valves Pvt Ltd | STAR ENGINEERS | ZED VALVES COMPANY PRIVATE LIMITED | JAYANT ENGINEERING & MARKETING PVT LTD |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00SUPPLY OF ITEMS, AS PER MR / RFQ | ||||||||||||||||||
| 1.00 | ITEM_CODE: 51301ZZZ0091ZZZZZ
[ITEM_DESC: VLV.GATE, SHEET 51301 2.0 INCH, LOCK OPEN] | 2 | Nos. | 17,954 ₹21,185.72 | 9,400 ₹11,092 | - | 17,000 ₹20,060 | 16,480 ₹19,446.4 | 18,212 ₹21,490.16 | 12,890 ₹15,210.2 | 31,794 ₹37,516.92 | - | 12,060 ₹14,230.8 | 19,600 ₹23,128 | - | 9,200 ₹10,856 Lowest | 11,950 ₹14,101 | 21,054 ₹24,843.72 |
| 2.00 | ITEM_CODE: 51301ZZZ009ZZZZZZ
[ITEM_DESC: VLV.GATE, SHEET 51301 2.0 INCH] | 84 | Nos. | 7,54,068 ₹8,89,800.24 | 3,90,600 ₹4,60,908 | - | 71,40,000 ₹84,25,200 | 6,83,928 ₹8,07,035.04 | 7,14,504 ₹8,43,114.72 | 3,94,800 ₹4,65,864 | 8,60,748 ₹10,15,682.64 | 3,35,160 ₹3,95,488.8 Lowest | 5,06,520 ₹5,97,693.6 | 5,71,200 ₹6,74,016 | - | 3,86,400 ₹4,55,952 | 4,17,900 ₹4,93,122 | 8,11,188 ₹9,57,201.84 |
| 3.00 | ITEM_CODE: 51301ZZZ011ZZZZZZ
[ITEM_DESC: VLV.GATE, SHEET 51301 3.0 INCH] | 19 | Nos. | 2,12,800 ₹2,51,104 | 1,27,300 ₹1,50,214 | - | 1,90,000 ₹2,24,200 | 1,91,976 ₹2,26,531.68 | 2,86,558 ₹3,38,138.44 | 1,50,765 ₹1,77,902.7 | 4,47,184 ₹5,27,677.12 | 1,31,100 ₹1,54,698 | 1,71,000 ₹2,01,780 | 1,80,500 ₹2,12,990 | - | 1,24,450 ₹1,46,851 Lowest | 1,51,525 ₹1,78,799.5 | 2,92,182 ₹3,44,774.76 |
| 4.00 | ITEM_CODE: 51301ZZZ0131ZZZZZ
[ITEM_DESC: VLV.GATE, SHEET 51301 4.0 INCH, LOCK OPEN] | 3 | Nos. | 52,524 ₹61,978.32 | 28,800 ₹33,984 | - | 37,500 ₹44,250 | 44,145 ₹52,091.1 | 66,957 ₹79,009.26 | 36,795 ₹43,418.1 | 93,792 ₹1,10,674.56 | 28,500 ₹33,630 Lowest | 35,100 ₹41,418 | 63,000 ₹74,340 | - | 32,400 ₹38,232 | 37,425 ₹44,161.5 | 70,074 ₹82,687.32 |
| 5.00 | ITEM_CODE: 51301ZZZ013ZZZZZZ
[ITEM_DESC: VLV.GATE, SHEET 51301 4.0 INCH] | 27 | Nos. | 4,08,240 ₹4,81,723.2 | 2,59,200 ₹3,05,856 | - | 2,97,000 ₹3,50,460 | 3,86,721 ₹4,56,330.78 | 5,86,413 ₹6,91,967.34 | 2,87,415 ₹3,39,149.7 | 8,00,307 ₹9,44,362.26 | 2,40,300 ₹2,83,554 Lowest | 3,15,900 ₹3,72,762 | 4,32,000 ₹5,09,760 | - | 2,86,200 ₹3,37,716 | 2,96,325 ₹3,49,663.5 | 5,95,431 ₹7,02,608.58 |
| 6.00 | ITEM_CODE: 51301ZZZ0151ZZZZZ
[ITEM_DESC: VLV.GATE, SHEET 51301 6.0 INCH, LOCK OPEN] | 2 | Nos. | 53,410 ₹63,023.8 | 28,800 ₹33,984 | - | 33,000 ₹38,940 | 42,184 ₹49,777.12 | 76,822 ₹90,649.96 | 39,800 ₹46,964 | 86,080 ₹1,01,574.4 | 38,000 ₹44,840 | 36,000 ₹42,480 | 48,000 ₹56,640 | - | 28,100 ₹33,158 Lowest | 41,950 ₹49,501 | 73,392 ₹86,602.56 |
| 7.00 | ITEM_CODE: 51301ZZZ0152ZZZZZ
[ITEM_DESC: VLV.GATE, SHEET 51301 6.0 INCH, LOCK CLOSED] | 1 | Nos. | 26,705 ₹31,511.9 | 14,400 ₹16,992 | - | 16,500 ₹19,470 | 21,092 ₹24,888.56 | 38,411 ₹45,324.98 | 22,110 ₹26,089.8 | 46,411 ₹54,764.98 | - | 18,000 ₹21,240 | 24,000 ₹28,320 | - | 14,050 ₹16,579 Lowest | 24,975 ₹29,470.5 | 39,576 ₹46,699.68 |
| 8.00 | ITEM_CODE: 51301ZZZ015ZZZZZZ
[ITEM_DESC: VLV.GATE, SHEET 51301 6.0 INCH] | 39 | Nos. | 7,06,680 ₹8,33,882.4 | 5,59,455 ₹6,60,156.9 | - | 5,85,000 ₹6,90,300 | 8,03,439 ₹9,48,058.02 | 14,74,629 ₹17,40,062.22 | 8,17,245 ₹9,64,349.1 | 11,06,313 ₹13,05,449.34 | 5,61,600 ₹6,62,688 | 7,02,000 ₹8,28,360 | 8,19,000 ₹9,66,420 | - | 5,46,000 ₹6,44,280 Lowest | 6,62,025 ₹7,81,189.5 | 13,30,524 ₹15,70,018.32 |
| 9.00 | ITEM_CODE: 51301ZZZ0161ZZZZZ
[ITEM_DESC: VLV.GATE, SHEET 51301 8.0 INCH, LOCK OPEN] | 4 | Nos. | 1,57,040 ₹1,85,307.2 | 90,000 ₹1,06,200 | - | 86,000 ₹1,01,480 Lowest | 1,29,492 ₹1,52,800.56 | 2,41,008 ₹2,84,389.44 | 1,14,640 ₹1,35,275.2 | 2,23,036 ₹2,63,182.48 | 1,06,000 ₹1,25,080 | 1,22,400 ₹1,44,432 | 1,52,000 ₹1,79,360 | - | 93,600 ₹1,10,448 | 1,19,500 ₹1,41,010 | 1,18,792 ₹1,40,174.56 |
Tender Value
Refer Docs
EMD Value
₹4 L
Closing Date
29 Dec 2025, 12:00 pmClosed
Ms. Sangitta Ghuliani, Sr.GM (SCM)
EIL GURUGRAM
VALVE- GATE, GLOBE AND CHECK (CAST-CS) FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)
2025_EIL_886409_2
SG/B933-000-WB-MR-3119/100
Open Tender
Miscellaneous Goods
Supply
150 days
AS PER BIDDING DOCUMENT
AS PER BIDDING DOCUMENT
15 documents required · 15 mandatory
₹0
₹4 L
Yes
27 Jun 2026
12 Dec 2025
30 Dec 2025
12 Dec 2025
29 Dec 2025
12 Dec 2025
PREAMBLE TO SCHEDULE of PRICE (SOP) / SCHEDULE OF RATES (SOR) (FOR INDIAN BIDDERS)
Name of Item : VALVE- GATE, GLOBE & CHECK (CAST-CS)
RFQ No:SG/B933-000-WB-MR-3119/100
NAME OF BIDDER:
OFFER REFERENCE NO:
1 The quoted prices shall be inclusive of all Scope of Supply, Freight, P&F and testing requirements as specified in the enclosed MR. Scope of Supply shall be strictly as per Material Requisition and other documents which are part of RFQ.
3 Bidder must quote the price in enclosed Schedule of Price (SOP) formats only. The formats shall not be changed and/or retyped. For any deviation to the formats, offer may be rejected.
4 Quoted prices are firm and fixed till complete execution of the entire order except the Price Variations applicable, as mentioned in Bid Data Sheet (BDS).
5 The quoted prices shall be inclusive of all testing requirements as specified in the Bidding Document.
6 In case of discrepancies in the Item Description/Quantity in this SOP, description/quantity etc. as per MR shall prevail.
8 This Schedule of Prices comprises the following : - SCHEDULE OF PRICES ( BOQ1) - DETAILS OF BUILT-IN-CIF VALUE OF IMPORT CONTENT (INDIAN BIDDERS) (FORMAT-B1)
9 i). GST rate has been prefilled as 18.00%, which can be edited by the bidders. ii) It is mandatory for bidders to mention GST rate against each item.The GST Rates have been pre-filled in respective columns , Bidders shall confirm/quote the applicable GST Rates as per their own assessment. Any GST rate submitted in respective columns in price bid shall be deemed to be considered as bidder's submission only.
Notes: i) Bidders must submit this preamble with their bid along with priced offer. ii) Bidders are requested to enter their name in the each page of Schedule of Price provided in the e-tender portal for submission of price bid
Select, Excess (+), Less (-)
Tender Inviting Authority: EIL on behalf of BPCL
Name of Item: VALVE- GATE, GLOBE & CHECK (CAST-CS)
RFQ No: SG/B933-000-WB-MR-3119/100
Notes:- 01). GST rate has been prefilled as 18.00%, which can be edited by the bidders. 02) It is mandatory for bidders to mention GST rate against each item.The GST Rates have been pre-filled in respective columns , Bidders shall confirm/quote the applicable GST Rates as per their own assessment. Any GST rate submitted in respective columns in price bid shall be deemed to be considered as bidder's submission only.
Name of the Bidder/ Bidding Firm / Company :
Sl. No. BLOCK No./ Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency GST Amount in Rs. P UNIT FREIGHT CHARGES UPTO PROJECT SITE (In Figures; to be entered by the Bidder) (excluding GST) in Rs (To be filled by bidder) Rate of GST in % on Freight Charges (To be filled by bidder) Rate of GST in % on Freight Charges (To be filled by bidder) Total Mandatory spare charges(MR item no 4.0) Including Freight in Rs Rate of GST in % on Mandatory spare Charges (To be filled by bidder) Per diem Charges of Spervision ( MR item no 8.0 ) Excluding GST in Rs Rate of GST in % on Supervision Charges (To be filled by bidder) HSN / SAC Code TOTAL AMOUNT excluding taxes in Rs. P TOTAL AMOUNT including taxes Rs. P TOTAL AMOUNT In Words
0 SUPPLY OF ITEMS, AS PER MR / RFQ 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
1 Item1 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2 item2 84 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
3 Item3 19 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
4 Item4 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
5 Item5 27 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
6 Item6 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
7 Item7 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
8 Item8 39 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
9 Item9 4 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
10 Item10 13 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
11 Item11 12 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
12 Item12 21 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
13 Item13 20 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
14 Item14 9 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
15 Item15 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
16 Item16 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
17 Item17 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
18 Item18 9 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
19 Item19 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
20 Item20 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
21 Item21 89 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
22 Item22 12 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
23 Item23 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
24 Item24 4 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
25 Item25 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
26 Item26 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
27 Item27 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
28 Item28 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
29 Item29 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
30 Item30 5 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
31 Item31 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
32 Item32 7 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
33 Item33 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
34 Item34 6 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
35 Item35 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
36 Item36 28 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
37 Item37 5 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
38 Item38 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
39 Item39 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
40 Item40 10 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
41 Item41 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
42 Item42 4 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
43 Item43 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
44 Item44 51 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
45 Item45 32 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
46 Item46 144 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
47 Item47 28 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
48 Item48 28 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
49 Item49 15 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
50 Item50 12 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
51 Item51 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
52 Item52 6 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
53 Item53 7 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
54 Item54 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
55 Item55 5 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
56 Item56 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
57 Item57 196 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
58 Item58 9 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
59 Item59 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
60 Item60 46 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
61 Item61 8 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
62 Item62 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
63 Item63 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
64 Item64 37 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
65 Item65 10 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
66 Item66 40 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
67 Item67 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
68 Item68 25 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
69 Item69 5 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
70 Item70 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
71 Item71 48 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
72 Item72 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
73 Item73 14 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
74 Item74 5 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
75 Item75 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
76 Item76 5 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
77 Item77 9 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
78 Item78 10 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
79 Item79 286 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
80 Item80 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
81 Item81 70 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
82 Item82 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
83 Item83 37 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
84 Item84 5 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
85 Item85 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
86 Item86 116 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
87 Item87 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
88 Item88 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
89 Item89 130 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
90 Item90 42 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
91 Item91 49 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
92 Item92 61 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
93 Item93 16 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
94 Item94 16 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
95 Item95 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
96 Item96 131 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
97 Item97 11 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
98 Item98 4 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
99 Item99 9 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
100 Item100 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
101 Item101 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
102 Item102 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
103 Item103 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
104 Item104 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
105 Item105 15 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
106 Item106 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
107 Item107 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
108 Item108 23 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
109 Item109 127 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
110 Item110 55 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
111 Item111 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
112 Item112 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
113 Item113 89 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
114 Item114 7 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
115 Item115 6 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
116 Item116 12 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
117 Item117 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
118 Item118 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
119 Item119 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
120 Item120 45 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
121 Item121 22 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
122 Item122 6 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
123 Item123 8 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
124 Item124 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
125 Item125 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
126 Item126 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
127 Item127 6 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
128 Item128 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
129 Item129 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
130 Item130 10 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
131 Item131 22 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
132 Item132 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
133 Item133 10 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
134 Item134 4 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
135 Item135 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
136 Item136 5 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
137 Item137 30 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
138 Item138 4 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
139 Item139 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
140 Item140 14 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
141 Item141 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
142 Item142 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
143 Item143 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
144 Item144 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
145 Item145 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
146 Item146 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
147 Item147 13 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
148 Item148 4 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
149 Item149 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
150 Item150 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
151 Item151 4 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
152 Item152 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
153 Item153 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
154 Item154 4 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
155 Item155 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
156 Item156 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
157 Item157 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
158 Item158 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
159 Item159 20 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
160 Item160 4 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
161 Item161 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
162 Item162 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
163 Item163 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
164 Item164 4 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
165 Item165 6 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
166 Item166 9 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
167 7 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
168 7 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
169 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
170 22 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
171 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
172 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
173 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
174 32 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
175 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
176 6 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
177 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
178 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
179 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
180 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
181 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
182 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
183 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
184 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
185 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
186 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
187 18 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
188 4 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
189 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
190 10 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
191 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
192 7 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
193 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
194 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
195 5 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
196 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
197 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
198 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
199 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
200 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
201 17 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
202 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
203 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
204 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
205 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
206 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
207 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
208 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
209 24 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
210 19 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
211 9 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
212 4 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
213 11 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
214 1 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
215 8 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
216 13 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
217 10 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
218 10 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
219 30 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
220 10 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
221 6 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
222 8 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
223 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
224 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
225 5 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
226 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
227 4 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
228 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
229 4 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
230 49 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
231 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
232 31 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
233 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
234 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
235 2 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
236 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
237 4 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
238 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
239 4 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
240 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
241 3 Nos. Excess(+) Full Conversion INR 18 18 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select %
Quoted Rate in Words
FORMAT B1 (CIF)
DETAILS OF BUILT-IN-CIF VALUE OF IMPORT CONTENT (INDIAN BIDDERS)
NAME OF BIDDER:
ITEMWISE BREAK-UP OF BUILT-IN-CIF VALUE OF IMPORT CONTENT, ITEM DETAILS OF IMPORT CONTENT AND RATES OF IMPORTS DUTY CONSIDERED AND INCLUDED IN QUOTED SUPPLY PRICE
DESCRIPTION CIF value of Import Content included in quoted supply prices (INR) RATE OF CUSTOM DUTY INCLUDED IN QUOTED FOT DESPATCH POINT PRICES
Rate in Figures Rate in Words
TOTAL CIF VALUE
1 The CIF Value(s) indicated by the vendor shall be deemed to be the maximum value(s) for the purpose of payment of variation in Basic Custom Duty and Customs Social Welfare Surcharge.
2 Bidder to consider input tax credit of IGST available at their end (in case of import of raw materials / component) in their prices.
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 30.10 MB
BOQ_935017.xls
BOQ • 0.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .