| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC ASSAM | HAILAKANDI | ASSAM | 788152 | ₹2.3 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹2.3 CrRejected-Finance ASSAM AS | KOKRAJHAR | ASSAM | 783331 | ₹2.3 Cr | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Dhruba Jyoti Saikia L2 | DEEPAK CHETRY L1 |
|---|---|---|---|---|---|
| 1.00 | 1. Construction of Road from Harmoti Bogoli Tiniali Road Via Bogoli Reserve Forest Gate from Ch. 0.00 m to Ch. 2205.00 m (L=2.205 KM) Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (i) By Manual Means
(a)In area of non thorny jungle | 1.32 | Ha | 52,995.08 ₹69,953.51 | 52,995.08 ₹69,953.51 |
| 2.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto pg q p 1000 m as per Technical Specification Clause 301.5 | 6,378.24 | Cum | 258.21 ₹16.5 L | 258.21 ₹16.5 L |
| 3.00 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
(i) Private Land | 1,779.44 | Cum | 400 ₹7.1 L | 339.68 ₹6.0 L |
| 4.00 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 1,249.69 | Cum | 2,000 ₹25.0 L | 1,749.69 ₹21.9 L |
| 5.00 | Providing laying spreading and compacting stone aggregates of specific sizes to WBM specification including in uniform thickness hand picking rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber applying and brooming stone screenbinding materials to fill up the interstices of coarse aggregate watering an dcompacting to the required density grading 2 as per technical specification clause 405. 3)Grading-II. A) By Manual Means | 624.84 | Cum | 5,000 ₹31.2 L | 4,390.67 ₹27.4 L |
| 6.00 | Providing laying spreading and compacting stone aggregates of specific sizes to WBM specification including spreading in uniform thickness handpicking rolling with smooth wheel roller 80-100kN stages to proper grade and camber applying and brooming stone screening binding materials to fill up the interstices of coarse aggregate watering and compacting to the required density grading 2 as per Technical Specification Clause 405. 3) Grading-III | 625.36 | Cum | 4,416.07 ₹27.6 L | 4,416.07 ₹27.6 L |
| 7.00 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 8,331.25 | Sqm | 39.78 ₹3.3 L | 39.78 ₹3.3 L |
| 8.00 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 8,331.25 | Sqm | 13.33 ₹1.1 L | 13.33 ₹1.1 L |
| 9.00 | Semi - Dense Bituminous Concrete: Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5% of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.508. complete in all respect. including carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) (Including cost of testing of materials at site and laboratory as directed by the deptt.)
(a) With hydrated lime/cement as filler ( refer table 500-9 of
MoSRT&H specification)
(I)'with 60/70 or VG-30 grade bitumen
for GradingII(10 mm nominal size) | 249.94 | Cum | 9,941.27 ₹24.8 L | 9,941.27 ₹24.8 L |
| 10.00 | Providing Hump type speed breaker SDBC | 5.49 | Cum | 9,941.27 ₹54,577.57 | 9,941.27 ₹54,577.57 |
Tender Value
₹2.3 Cr
EMD Value
₹4.5 L
Closing Date
14 Aug 2025, 2:00 pmClosed
CE, PWD(Roads), Assam, Chandmari, Ghy-3
CE, PWD(Roads), Assam, Chandmari, Ghy-3
MMPPNA_RIDF_XXXI_25_26_316 Construction of Road from (1) Harmoti Bogoli Tiniali Road via Bogoli Reserve Forest Gate from Ch. 0.00 m to Ch. 2205.00 m (L-2.205 KM) (2) Khakanbari Tiniali to Silonibari Station Road via AAG Line from Ch. 0.00 m to Ch. 13
2025_PWD_45926_25
CE/DEV/TB/60/2025-26/06 Dtd- 14.07.2025
Open Tender
Civil Works – Roads
270 days
Ranganadi
Please refer Tender Documents
5 documents required · 5 mandatory
₹4,500
₹4.5 L
Yes
CE, PWD(Roads), Assam, Chandmari, Ghy-3
30 Mar 2026
28 Jul 2025
14 Aug 2025
28 Jul 2025
14 Aug 2025
28 Jul 2025
28 Jul 2025 - 1 Aug 2025
4 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 18.94 MB
Tendernotice_2.pdf
PDF • 25.44 MB
Tendernotice_3.pdf
PDF • 0.60 MB
BOQ_73027.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid