| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹34.5 LAdmitted-Finance | -43.00% | ₹34.5 L | L1 | Admitted-Finance |
| 2 | L2₹37.7 LAdmitted-Finance KHARPORA TEHSIL BANIHAL DISTRICT RAMBAN J K UT | BANIHAL | RAMBAN | JAMMU AND KASHMIR | -37.86% | ₹37.7 L | L2 | Admitted-Finance |
| 3 | L3₹41.8 LAdmitted-Finance | -30.99% | ₹41.8 L | L3 | Admitted-Finance |
| 4 | L4₹44.1 LAdmitted-Finance | -27.18% | ₹44.1 L | L4 | Admitted-Finance |
| 5 | L5₹44.3 LAdmitted-Finance | -26.88% | ₹44.3 L | L5 | Admitted-Finance |
Tender Value
₹60.6 L
EMD Value
₹1.2 L
Closing Date
5 May 2026, 5:00 pmClosed
Executive Engineer PMGSY Division Ramban
Executive Engineer PMGSY Division Ramban HQ Batote
Permanent Restoration of Sangaldan to Tatapani road, Package No. JK14-592, Stage-Upg., Block sangaldan Distt. Ramban, Length 5.40 kms by way of construction of Crated walling , Semi pucca RWall , Pucca Edge wall in stretches and approach wall
2026_JKRRD_147422_3
e NIT No EE/PMGSY/DR/71 of 2026_27 Dated_ 29/04/2026
Open Tender
Civil Works - Roads
120 days
Executive Engineer PMGSY Division Ramban
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer PMGSY Division Ramban
₹1.2 L
Executive Engineer PMGSY Division Ramban HQ Batote
11 May 2026
30 Apr 2026
6 May 2026
30 Apr 2026
5 May 2026
30 Apr 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soils : | 937.2 | Cum | 479.3 | ₹4,49,199.96 | item 01 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soils | 15.4 | Cum | 256.85 | ₹3,955.49 | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 7.75 | Cum | 4,826.5 | ₹37,405.38 | - |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 105.2 | Cum | 7,504.6 | ₹7,89,483.92 | - |
| 5 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with Cement mortar 1:6 (1 Cement : 6 coarse sand) | 22.95 | Cum | 5,402.9 | ₹1,23,996.56 | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 74.8 | sqm | 628.95 | ₹47,045.46 | - |
| 7 | Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like in Cement mortar 1:6 (1 Cement : 6 coarse sand) (with 70% available stones) | 57.2 | Cum | 6,318.44 | ₹3,61,414.77 | - |
| 8 | Dry random rubble masonry with hard stone in foundation and plinth/ superstructure with bond stone. | 11.15 | Cum | 3,262.1 | ₹36,372.42 | - |
| 9 | Providing and laying of coping 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 14 | sqm | 416.5 | ₹5,831 | - |
| 10 | Construction of crate work by way of handpacking of stones in wire crates including cost of stones & crates | 1,866.24 | Cum | 1,823.46 | ₹34,03,013.99 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_229965.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid