Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 47 EZHIL NAGAR PUDUKKOTTAI 622 005 | PUDUKKOTTAI | TAMIL NADU | 622005 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹86,000
Closing Date
23 Feb 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
District Collector/Chairman
DRDA, Pudukkottai
SCPAR - 2020-2021 - PACKAGE No. 10 - Karambakudi Block in Pudukkottai District
2021_RDTN_194100_1
SCPAR - 2020-2021 - Package No.10- PUDUKKOTTAI Dt.
Open Tender
Civil Works - Roads
Item Rate
180 days
Pudukkottai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹86,000
24 Feb 2021
5 Feb 2021
23 Feb 2021
5 Feb 2021
23 Feb 2021
5 Feb 2021
90 days
Amount
Improvements to Suriyanviduthi Vilaripatti road to Karaithoppu in Km 0/0- 0/480 in Vanadanviduthi Panchayat
Clearing and grubbing road land including uprooting wild Vegetation grass ,Bushes,scrubbs ,sapling and trees of girths upto 300mm,removal of stumps of such trees cut earlie and disposalof unserviceable material and stacking of serviceable materials to be used or auctioned,upto a lead of 1000 m including removel and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201
Earth Work excavation and depositing on bank with initial lead and lift in all clauses of soils such as hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams as per SS20A including sectioning and breaking clods for widenting and raising the berms.
Picking the existing Wornout BT Surface 50mm to 100mm thick including all labour charges etc .. Complete
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24cum of gravel for blindage per 10 sqm including cost and conveyance of all materials and stacking to department gauge for premeasurement, labour charges for spreading metal and gravel hand packing to camber, watering with all leads for water and compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM unprimed surface using 4.00 kg of emulsion bitumen for 10 sqm area including cost of bitumen including labour charges for preparing the surface and applying the required quantity of emulsio bitumen as tack coat etc.
Providing and laying premix carpet with seal coat type A for 20mm thickness using 0.18cum of 13.2mm IRC HBG metal and 0.09cum of 11.2mm IRC with 14.6kg of bitumen for premixing 10sqm of premix carpet and 0.09cum of 6.70mm IRC HBG metal with 9.8kg of bitumen for seal coat type A per 10 sqm including cost and conveyance of all materials of the work site and stacking them to the departmental gauge for premeasurement heating the bitumen in bitumen boiler heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet appklication of bitumen for seal coat over premix carpet including labour charges for spreading seal coat seperately over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete as per clause 509 of MOST specifications.
Providing and laying gravel for berms including cost and conveyance of all materials to site and stacking to depart mental for premeasurement and labour charges for spreading and hire charges including all labour charges etc., complete.
Provision for HM Stones
Improvements to Karupparkovil road to Karuvelankulam Road km 0/0 -1/0 in Vandanviduthi Panchayat
Clearing and grubbing road land including uprooting wild Vegetation grass ,Bushes,scrubbs ,sapling and trees of girths upto 300mm,removal of stumps of such trees cut earlie and disposalof unserviceable material and stacking of serviceable materials to be used or auctioned,upto a lead of 1000 m including removel and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201
Earth Work excavation and depositing on bank with initial lead and lift in all clauses of soils such as hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams as per SS20A including sectioning and breaking clods for widenting and raising the berms.
Picking the existing Wornout BT Surface 50mm to 100mm thick including all labour charges etc .. Complete
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24cum of gravel for blindage per 10 sqm including cost and conveyance of all materials and stacking to department gauge for premeasurement, labour charges for spreading metal and gravel hand packing to camber, watering with all leads for water and compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM unprimed surface using 4.00 kg of emulsion bitumen for 10 sqm area including cost of bitumen including labour charges for preparing the surface and applying the required quantity of emulsio bitumen as tack coat etc.
Providing and laying premix carpet with seal coat type A for 20mm thickness using 0.18cum of 13.2mm IRC HBG metal and 0.09cum of 11.2mm IRC with 14.6kg of bitumen for premixing 10sqm of premix carpet and 0.09cum of 6.70mm IRC HBG metal with 9.8kg of bitumen for seal coat type A per 10 sqm including cost and conveyance of all materials of the work site and stacking them to the departmental gauge for premeasurement heating the bitumen in bitumen boiler heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet appklication of bitumen for seal coat over premix carpet including labour charges for spreading seal coat seperately over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete as per clause 509 of MOST specifications.
Providing and laying gravel for berms including cost and conveyance of all materials to site and stacking to depart mental for premeasurement and labour charges for spreading and hire charges including all labour charges etc., complete.
Provision for HM Stones
Provision for KM Stones
Improvements to Velaripatti Road GAS Factory (Via) Road in Km 0/0 -1/450 in Maruthangonviduthi Panchayat
Clearing and grubbing road land including uprooting wild Vegetation grass ,Bushes,scrubbs ,sapling and trees of girths upto 300mm,removal of stumps of such trees cut earlie and disposalof unserviceable material and stacking of serviceable materials to be used or auctioned,upto a lead of 1000 m including removel and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201
Earth Work excavation and depositing on bank with initial lead and lift in all clauses of soils such as hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams as per SS20A including sectioning and breaking clods for widenting and raising the berms.
Picking the existing Wornout BT Surface 50mm to 100mm thick including all labour charges etc .. Complete
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24cum of gravel for blindage per 10 sqm including cost and conveyance of all materials and stacking to department gauge for premeasurement, labour charges for spreading metal and gravel hand packing to camber, watering with all leads for water and compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM unprimed surface using 4.00 kg of emulsion bitumen for 10 sqm area including cost of bitumen including labour charges for preparing the surface and applying the required quantity of emulsio bitumen as tack coat etc.
Providing and laying premix carpet with seal coat type A for 20mm thickness using 0.18cum of 13.2mm IRC HBG metal and 0.09cum of 11.2mm IRC with 14.6kg of bitumen for premixing 10sqm of premix carpet and 0.09cum of 6.70mm IRC HBG metal with 9.8kg of bitumen for seal coat type A per 10 sqm including cost and conveyance of all materials of the work site and stacking them to the departmental gauge for premeasurement heating the bitumen in bitumen boiler heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet appklication of bitumen for seal coat over premix carpet including labour charges for spreading seal coat seperately over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete as per clause 509 of MOST specifications.
Providing and laying gravel for berms including cost and conveyance of all materials to site and stacking to depart mental for premeasurement and labour charges for spreading and hire charges including all labour charges etc., complete.
Provision for HM Stones
Provision for KM Stones
Improvements to the Road From Navallodaikulam Road Km 0/0-1/0 in Vandanviduthi Panchayat
Clearing and grubbing road land including uprooting wild Vegetation grass ,Bushes,scrubbs ,sapling and trees of girths upto 300mm,removal of stumps of such trees cut earlie and disposalof unserviceable material and stacking of serviceable materials to be used or auctioned,upto a lead of 1000 m including removel and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201
Earth Work excavation and depositing on bank with initial lead and lift in all clauses of soils such as hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams as per SS20A including sectioning and breaking clods for widenting and raising the berms.
Picking the existing Wornout BT Surface 50mm to 100mm thick including all labour charges etc .. Complete
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24cum of gravel for blindage per 10 sqm including cost and conveyance of all materials and stacking to department gauge for premeasurement, labour charges for spreading metal and gravel hand packing to camber, watering with all leads for water and compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM unprimed surface using 4.00 kg of emulsion bitumen for 10 sqm area including cost of bitumen including labour charges for preparing the surface and applying the required quantity of emulsio bitumen as tack coat etc.
Providing and laying premix carpet with seal coat type A for 20mm thickness using 0.18cum of 13.2mm IRC HBG metal and 0.09cum of 11.2mm IRC with 14.6kg of bitumen for premixing 10sqm of premix carpet and 0.09cum of 6.70mm IRC HBG metal with 9.8kg of bitumen for seal coat type A per 10 sqm including cost and conveyance of all materials of the work site and stacking them to the departmental gauge for premeasurement heating the bitumen in bitumen boiler heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet appklication of bitumen for seal coat over premix carpet including labour charges for spreading seal coat seperately over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete as per clause 509 of MOST specifications.
Providing and laying gravel for berms including cost and conveyance of all materials to site and stacking to depart mental for premeasurement and labour charges for spreading and hire charges including all labour charges etc., complete.
Provision for HM Stones
Provision for KM Stones
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M. Surulirajan
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .