| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.9 LAccepted-Finance 6 VISHNU SHREYA COMPLEX PLOT NO 87 87 A SECTOR 50 E OFF PALM BEACH ROAD SEAWOODS WEST NAVI MUMBAI 400706 | THANE | MAHARASHTRA | 400706 | ₹81.9 L | L1 | Accepted-Finance ACCEPTED |
| 2 | L2₹83.2 LAccepted-Finance KARIMPUR NAIHATI BIRBHUM 731243 | BIRBHUM | WEST BENGAL | 731243 | ₹83.2 L | L2 | Accepted-Finance ACCEPTED |
| 3 | L3₹88.1 LAccepted-Finance 184 SHIV NAGAR COLONY BHANPUR BHOPAL M P | ₹88.1 L | L3 | Accepted-Finance ACCEPTED |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹82.4 L
EMD Value
₹2.1 L
Closing Date
9 Apr 2026, 12:00 pmClosed
SA, ASI Mumbai Circle, Mumbai
O/o the Superintending Archaeologist, Archaeological Survey of India, Sion Fort, Sion (E) Mumbai- 400 022.
Execution of work under CDW to Restoration of Nagarkhana Structure at Raigad Fort, Tal-Mahad, Dist-Raigad. As specified in the BOQ.
2026_ASI_904158_1
West/Mumb/Raig/Raig/22486996
Open Tender
Miscellaneous Works
Raigad Fort, Tal-Mahad, Dist-Raigad.
AS PER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹0
₹2.1 L
Yes
10 Apr 2026
31 Mar 2026
10 Apr 2026
31 Mar 2026
9 Apr 2026
31 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0Description of Works | |||||
| 1Provision for carefully removing the old damaged/decentegrated lime / cement concrete laid over the roof of first level flooring of Nagarkhana structure including disposing the unwanted stuff beyond the ASI premises of Raigad Fort etc. complete as per the direction of archaeological officer / officials. | |||||
| 2Provision for laying lime surkhi concrete 1:1:1 with 20 mm brick agregate for water tightening the second stair flooring to prevent water retention and seephge which causing salt encrustation and development of vegetation growth , laying as per the requirement, beating the lime concrete layment for 7 days time to time till coming up the creamy layer of mortar on surface by pouring admixture of traditional ingradients by mixing pebbles, herbal plant's extracts for additional strengthening etc. complete as per the direction of archaeological officer / officials. | |||||
| 3Provision for strengthning the brick wall by plastering (internal sides) of second floor in Lime surkhi mortar 1:1:1 including removing all the algae liches from the brick walls , racking out joints and prepare the surface for plastering etc. complete as per the direction of archaeological officer / officials. | |||||
| 4Providing Lime Plaster 36 mm thick in two to three coats as per original for preparing/ mending of the missing stucco work as per existing pattern and clues like lotus petal-diamond cuts, flower design ,offsets and molding etc by using traditional Lime Mortar 1:1:1 , consolidation the admixture by adding the jaggery ,hirda fruit gum ,juit pieces ,water proof compound methibael fruit and potable water including erecting and removing of appropriate scaffolding as per requirement etc. complete as per the direction of archaeological officer / officials. | |||||
| 5Provision for pointing to the stone surfaces on the ground and first floor in Lime Surkhi Mortar1:1:1 including cleaning the stone surfaces by removing funges algae, salt encrustation and discloration , previus incongruous additions such as cement screding ,which damaged the structure,sapperance etc. complete as per the direction of archaeological officer / officials. | |||||
| 6Providing and fabricating G.I square pipe for column/post of size 200 x 200 x 6 mm in length of 2.75 M , with stuctural steel work in rolled sections like joists, channels, angles, tees etc. as per detailed design and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position making riveted/ bolted/ welded connections without connecting plates, braces etc. and including wooden cladding to the post , two coats of painting of approved quality and shade etc. complete as per the direction of archaeological officer / officials. | |||||
| 7Providing and fixing specially prepared dressed stone base of size 0.30 x0.30 x0.25 with GI plate of size 200 x200 mm beneath to the GI rectangular post with necessary screws and painting all over with a coat of red oxide, Zink chromate primer with surface duly prepared for painting etc. including two course of painting in enamel paint in approved shade etc. complete all as per the specification, Indian standards and drawings as directed. | |||||
| 8Providing structural steel work in trusses, other similar trussed purlins and members with all bracing, gusset plates etc. as per detailed designs and drawings or as directed including cutting, fabricating, hoisting, erecting fixing in position, Making riveted/ bolted/ welded connection and one coat of anticorrosive paint and over it 2 coats of oil painting approved quality and shade etc. complete. (For Gable Roof with truss) etc. complete as per the direction of the archaeological officer/ officials. ( As per the drawings) | |||||
| 9Providing and fixing Crossed Supporting Trusses and members over the triangular portion of upper roof made up of with GI square pipe of size 150 x 150 x 5 mm thick with 100 x 75 x 6 mm rafters with all web bracing, webs, timber connector, nut and bolts, nails etc., as per the detailed design and drawing or as directed by the engineers including cutting, fabricating, hoisting, erecting, fixing in position by checking the levels of all trusses, fastening the trusses as per the original, and one coat of anticorrosive paint and over it 2 coats of oil painting approved quality and shade etc. complete. (For Gable Roof with truss), erecting and removal of appropriate scaffolding etc. complete as per the direction of the archaeological officer/ officials. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 32.25 MB
TENDERDOCUMENTS.pdf
Tender Documents • 32.24 MB
BOQ_950348.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid