Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹9.9 L
EMD Value
₹24,500
Closing Date
30 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Assistant Engineer (Ele)
Electrical Subdivision, Agatti
Various types of Electrical works in Distribution Lines (LT) at Electrical Subdivision Agatti
2026_UTL_3493_1
F. No. IV/14/AE-ELE/2021 Dated 16.10.2026
Open Tender
Electrical Works
Item Rate
365 days
Agatti
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹24,500
16 Oct 2026
16 Oct 2026
31 Oct 2026
17 Oct 2026
30 Oct 2026
17 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing New Service connections (Over Head line): Fixing Suitable cutout fuse, Fixing Energy Meter, Providing service line, providing line connections, etc. Over head Service lines should be clipped to the stay wire using proper cable tie. Service wire with stay wire tied at proper height and tight. (The distance between post and consumer meter point is up to 30 Mtrs length/ Above 30 Mtrs length). | |||||
| 1.1 | Single Phase Connection (Up to 30 Mtrs distance) | 50 | Nos. | - | - |
| 1.2 | Three Phase Connection (Up to 30 Mtrs distance) | 25 | Nos. | - | - |
| 1.3 | Single Phase Connection (Above 30 Mtrs distance) | 50 | Nos. | - | - |
| 1.4 | Three Phase Connection (Above 30 Mtrs distance) | 25 | Nos. | - | - |
| 2Providing New Service connections (UG Cable ): Fixing and clipping the UG cable to the wall with proper cable clip/tie , Fixing Energy Meter etc. | |||||
| 2.1 | Single Phase Connection | 150 | Nos. | - | - |
| 2.2 | Three Phase Connection | 50 | Nos. | - | - |
| 3UG Cable Joining LT 440V lines: Cutting cables, Removing insulations, Cable Joining with suitable Joint Kit as per the Procedure. Proper size of connectors should be used for a particular cable, proper tools and equipment are to be used, cuts and stripping should be very clean, proper technique is to be used for cable jointing and restoring the insulation, outer-sheath and Armour. | |||||
| 3.1 | LT Cables 3 Phase (95, 120 & 160 Sq mm) | 50 | Nos. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.00 MB
BOQ_3952.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .