BREAKDOWN MTCE OVERHAULING OF VALVES
2022_EB_229732_1
OT 6
Open Tender
Electrical Works
Works
180 days
Oo SE ES MTPS2
PLS REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹18,120
Yes
7 May 2022
20 Apr 2022
6 May 2022
20 Apr 2022
5 May 2022
20 Apr 2022
Amount
Charges for Cutting and welding of new SS Globe valve (3/8”) DN10mm, (5/8”) DN14mm, 1500/2500 class HO valves or equivalent joints by IBR welder with required T&P and consumables.
Charges for cutting and welding of new Gate/Globe valve 1” 1500/2500 Class HO/MO valves or equivalent joints by IBR with required T&P and consumables.
Charges for cutting and welding of new Gate/Globe valve 1” 800/1500 Class HO/MO valves or equivalent joints by non IBR welder with required T&P and consumables.
Charges for Gasket renewing for 250/300/350 mm valve, this work involves removing the valve from line, cleaning the flange surface on both sides, preparation of gaskets for both ends, positioning the valve in the line with gaskets and tightening the flange bolts & nuts with required T&P and consumables.
Charges for Gasket renewing for 400/500/600 mm valve, this work involves removing the valve from line, cleaning the flange surface on both sides, preparation of gaskets for both ends, positioning the valve in the line with gaskets and tightening the flange bolts & nuts with required T&P and consumables.
Charges for Removing the safety Relief valve size 20/25mm from the system, Disassembling the Safety Relief valve, cleaning all the parts of the SRV, checking the seating surfaces and Lapping the seat surfaces and Lapping the seat disc for perfect blue matching. Setting the pressure for rated lifting the SRV with hydraulic pump. Reassembling the SRV with new inlet and outlet flange gaskets with required T&P and consumables.
Charges for Overhauling of GV, GLV 300 mm / 16 ATA MOV, GV 300/40 ATA HO, Control valve 10” X 10” and 12” X 12”. This work involves dismantling the valve, cleaning all the parts of the valve, checking the seating surfaces and actuator bearings. Lapping the gate / seat / disc / flap for perfect blue matching. Reassembling the valve with new bonnet gaskets and gland packings with required T&P and consumables.
Charges for Overhauling of GV,GLV 200 mm / 40 ATA MOV, GV 250/40 ATA HO, SCNRV 250 / 300 / 40 ATA, Control valve 06” X 06 “and 08” X 08”. This work involves dismantling the valve, cleaning all the parts of the valve, checking the seating surfaces and actuator bearings. Lapping the gate / seat / disc / flap for perfect blue matching. Reassembling the valve with new bonnet gaskets and gland packings with required T&P and consumbales.
Charges for Overhauling of GV, GLV 250 / 300 mm / 64 ATA MOV, GV 300 / 400 mm /100 ATA HO. This work involves dismantling the valve, cleaning all the parts of the valve, checking the seating surfaces and actuator bearings. Lapping the gate / seat / disc / flap for perfect blue matching. Reassembling the valve with new bonnet gaskets and gland packings with required T&P and consumables.
Charges for Overhauling of GV, GLV 400/450 mm / 64 ATA MOV. This work involves dismantling the valve, cleaning all the parts of the valve, checking the seating surfaces and actuator bearings. Lapping the gate / seat / disc / flap for perfect blue matching. Reassembling the valve with new bonnet gaskets and gland packings with required T&P and consumables.
Charges for Overhauling of Butterfly valve 400/450 /600 mm MOV. This work involves Dismantling the actuator and valve, Releasing all mounting bolts and plate segments for releasing the seal, Rethreading the damaged threads, cleaning all the parts of the valve, Adjusting/renewal of rubber seal, Dismantling of BFV gear box, renewal of grease ,bearings and Reassembling the valve and checking open/close operations with required T&P's and consumables.
Charges for Gasket renewing for 700/850/900 mm Flange.This work involves dismantling the flange bolts & nuts, cleaning the flange surface on both sides, preparation of gaskets for both ends, positioning and assembling of flange in line with gaskets and tightening the flange bolts & nuts with required T&P's and consumables.
Charges for Cleaning & Gasket renewing of Strainers of size OD ϕ 450mm X 1000 mm length.This work involves dismantling the strainer cover bolts & nuts, opening of strainer manhole door, lifting the strainer from line , cleaning the strainers, checking and cleaning of impurities in strainer meshes, cleaning of impurities from the line, preparation of gaskets for strainer cover, positioning and assembling the strainer in line with gaskets and tightening the strainer bolts & nuts with required T&P's and consumables.
Charges for Overhauling & replacing of Safety valves.This work involves removing the safety Relief valve size 100 mm (4”) from the system, Disassembling the Safety Relief valve, cleaning all the parts of the SRV, checking the seating surface area and Lapping the seat surfaces and disc for perfect blue matching. Setting the pressure for rated lifting the SRV with hydraulic pump. Reassembling the SRV with new inlet and outlet flange gaskets with required T&P's and consumables.
Charges for inspection and cleaning of condensate inlet to Deaerator nozzle.Thisa work involves removal of bend pipe, dismantling the upoper flange,lifting of flanges and removal of lower flanges inside the deaerator tank and removal of nozzle using chain blocks. After removal of nozzle, inspection and cleaning by air and jet water then assembling of nozzles, flanges and pipe bend with suitable gaskets.
Charges for Overhauling of HP/LP dosing pumps: a) Decoupling the motor and the liquid well assembly, draining the oil from the pump,dismantling the speed reduction assembly,dismantling the plungerand the pump bodies and connected flanges. (b) Dismantling the crosshead piston and connecting rod,removing the bearings properly,dismantling of worm and worm wheel assemblies,cleaning and inspection of all the above parts for wear and replacement if necessary. Reassembling all the above after overhauling as per the procedure. (c) Dismantling of the pump,plunger assembly,valve and valve seats, inspection and replacing the wornout parts if necessary and reassembling the pump.(d) Inspection of couplings, coupling pads and replacing if necessary,coupling the motor and the liquid well assembly,connecting the sump,assembling the speed reduction assembly,connecting the plunger and the pump bodies and connected flanges, checking of alignment with the motor and sucessful commissioning of the pump . Cleaning & painting the complete pump assembly & base structure , painting the connected pipelines and painting of the pump baseconcrete structure with oil Distemper.(Paint under Contractor scope)with required T&P's and consumables.
TAM AND CO
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .