Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 LAdmitted-Finance | ₹13.0 L | L1 | Admitted-Finance |
| 2 | L2₹18.9 LAdmitted-Finance | ₹18.9 L | L2 | Admitted-Finance |
| 3 | L3₹19.5 LAdmitted-Finance | ₹19.5 L | L3 | Admitted-Finance |
| 4 | L4₹20.9 LAdmitted-Finance | ₹20.9 L | L4 | Admitted-Finance |
| 5 | L5₹21.2 LAdmitted-Finance 215 G 27 SECTOR 3 ROHINI DELHI 110085 | NORTH WEST | DELHI | 110085 | ₹21.2 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Parkash Construction Co. L7 | RAKESH KUMAR SHARMA L6 | Mahesh Chand Gupta L1 | Hortitech India L5 | SUNIL KUMAR MITTAL L3 | manish kumar tanwar L2 | VED PAL BHARDWAJ L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Pruning, trimming, shaping of trees /shrubs (ht 15 feet and above) i/c removal of cut materials upto 50mt. Lead, as per direction of officer in charge. T&P shall be arranged by the contractor | 2,995 | per tree | 50 ₹1.5 L | 115 ₹3.4 L | 40 ₹1.2 L | 47 ₹1.4 L | 55 ₹1.6 L | 40 ₹1.2 L | 100 ₹3.0 L |
| 2.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 4,047 | Sqm | 15 ₹60,705 | 15 ₹60,705 | 5 ₹20,235 | 15 ₹60,705 | 18.7 ₹75,678.90 | 12 ₹48,564 | 9.98 ₹40,389.06 |
| 3.00Digging holes in all kind of soil and refilling the same with the excavated earth mixed with manure or sludge in ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lift ( cost of manure , sludge or extra good earth if needed to be paid for separately); | ||||||||||
| 3.01 | Holes. 0.60m. dia and 0.60m. deep | 5,500 | Each | 30 ₹1.6 L | 30 ₹1.6 L | 10 ₹55,000 | 42 ₹2.3 L | 40 ₹2.2 L | 40 ₹2.2 L | 20 ₹1.1 L |
| 3.02 | Holes. 0.45m. dia and 0.45m. deep | 10,000 | Each | 15 ₹1.5 L | 15 ₹1.5 L | 5 ₹50,000 | 16 ₹1.6 L | 18 ₹1.8 L | 10 ₹1 L | 15 ₹1.5 L |
| 4.00Tree Plants at site. | ||||||||||
| 4.01 | Providing and stacking of Ficus religiosa (Peepal) of height 150-165 cm. in big poly bags of size 30 cm as per direction of the officer-in-charge. | 300 | Each | 72.2 ₹21,660 | 66 ₹19,800 | 60 ₹18,000 | 65 ₹19,500 | 60 ₹18,000 | 55 ₹16,500 | 85 ₹25,500 |
| 4.02 | Providing and stacking of Azadirachta indica ( Neem ) of height 120-130cm in big polybag of size 25 cm as per direction of the officer-in-charge. | 450 | Each | 75.85 ₹34,132.50 | 66 ₹29,700 | 40 ₹18,000 | 55 ₹24,750 | 60 ₹27,000 | 55 ₹24,750 | 85 ₹38,250 |
| 4.03 | Providing and stacking of Bombax ceiba of height 150-165 cm. in big poly bags of size 25 cm as per direction of the officer-in-charge. | 250 | Each | 68.6 ₹17,150 | 70 ₹17,500 | 50 ₹12,500 | 68 ₹17,000 | 60 ₹15,000 | 55 ₹13,750 | 90 ₹22,500 |
| 4.04 | Providing and stacking of Ficus infectoria (Pilkhan) of height 150-165 cm. in big polybag of size 25 cm as per direction of the officer-in-charge. | 600 | Each | 69.8 ₹41,880 | 65 ₹39,000 | 30 ₹18,000 | 70 ₹42,000 | 60 ₹36,000 | 55 ₹33,000 | 80 ₹48,000 |
Tender Value
₹28.3 L
EMD Value
₹56,528
Closing Date
15 Apr 2026, 3:00 pmClosed
DY DIRECTOR
Dy Director HORT VIII B2B JANAKPURI
Completed Scheme under NA-II/Horticulture Zone Eco restoration Central ridge.SH-Supply of the Good earth, Cattle manure, Neem oil cake and plants, Digging of holes, supply of water tankers, pruning of Invasive species and clearing of jungle, etc.
2026_DDA_904995_1
17/DD/HD-8/DDA/2025-26 Re-Invite
Open Tender
Civil Works
180 days
Dy Director HORT VIII B2B JANAKPURI
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹56,528
20 Apr 2026
9 Apr 2026
16 Apr 2026
9 Apr 2026
15 Apr 2026
9 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Pruning, trimming, shaping of trees /shrubs (ht 15 feet and above) i/c removal of cut materials upto 50mt. Lead, as per direction of officer in charge. T&P shall be arranged by the contractor | 2,995 | per tree | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 4,047 | Sqm | - | - | BI01010001010000000000000515BI0100001114 |
| 3Digging holes in all kind of soil and refilling the same with the excavated earth mixed with manure or sludge in ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lift ( cost of manure , sludge or extra good earth if needed to be paid for separately); | ||||||
| 3.01 | Holes. 0.60m. dia and 0.60m. deep | 5,500 | Each | - | - | BI01010001010000000000000515BI0100001116 |
| 3.02 | Holes. 0.45m. dia and 0.45m. deep | 10,000 | Each | - | - | BI01010001010000000000000515BI0100001117 |
| 4Tree Plants at site. | ||||||
| 4.01 | Providing and stacking of Ficus religiosa (Peepal) of height 150-165 cm. in big poly bags of size 30 cm as per direction of the officer-in-charge. | 300 | Each | - | - | BI01010001010000000000000515BI0100001119 |
| 4.02 | Providing and stacking of Azadirachta indica ( Neem ) of height 120-130cm in big polybag of size 25 cm as per direction of the officer-in-charge. | 450 | Each | - | - | BI01010001010000000000000515BI0100001120 |
| 4.03 | Providing and stacking of Bombax ceiba of height 150-165 cm. in big poly bags of size 25 cm as per direction of the officer-in-charge. | 250 | Each | - | - | BI01010001010000000000000515BI0100001121 |
| 4.04 | Providing and stacking of Ficus infectoria (Pilkhan) of height 150-165 cm. in big polybag of size 25 cm as per direction of the officer-in-charge. | 600 | Each | - | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.16 MB
BOQ_951247.xls
BOQ • 0.29 MB
tender17re.pdf
Tender Documents • 2.00 MB
Download all tender documents and submit your bid