Loading…
Loading…
Tender Value
₹8.5 L
EMD Value
₹8,470
Closing Date
14 Jul 2026, 5:00 pmDue tomorrow
Divisional Officer
RURAL WORKS DIVISION, DEOGARH
Palasama to Hadsanhar Road_Road_Repair such as repair of Potholes and depressions and Fixing of sign boards,KM stones,berm dressing, jungle clearance etc._0.000 to 4.700
2026_CERWI_133962_1
SERWDGH-Online-02 of 2026-27
Open Tender
Civil Works - Roads
30 days
Deogarh
2 documents required · 2 mandatory
₹4,000
₹8,470
Yes
1 Jul 2026
1 Jul 2026
15 Jul 2026
1 Jul 2026
14 Jul 2026
1 Jul 2026
1 Jul 2026 - 13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness etc. complete as per specification and direction of the Engineering in charge. | 1,296 | sqm | 8.63 | ₹11,184.48 |
| 2 | Labour for applying Tack coat using Emulsion including cost of Emulsion Labour etc complete as per direction of the Engineer in Charge. | 2,025 | sqm | 19.2 | ₹38,880 |
| 3 | Labour for laying 20mm thick premix carpet using 0.27cum of 13.20mm to 5.60mm size crushed stone chipping and 14.60kg penetration grade of bitumen for 10sqm including hand packing to proper camber and consolidation with PRR including hire and running charges of PRR,hot mix plant,bitumen boiller and all other T&P articles including cost and conveyance of chips and bitumen complete as per specification and direction of the Engineering in charge. | 2,025 | sqm | 258.24 | ₹5,22,936 |
| 4 | Labour for laying 6mm thick precoated sealcoat Type-B using 6.8kg Bitumen and 0.06cum of 6mm size chips per 10 sqm etc. complete as per direction of the Engineering in charge. | 2,025 | sqm | 120.2 | ₹2,43,405 |
| 5 | Conveying from stacks and spreading moorum on road surface to proper thickness and camber for topping including cost and carriage of materials etc.complete as per direction of Engineer in charge . | 40.39 | cum | 767.19 | ₹30,986.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.34 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_599096.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid