| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC | L1 | Accepted-AOC Found 1st Lowest | |
| 2 | L2₹1.3 L+₹2,900 (2.37%)Rejected-AOC KHUTLA NEAR IMAM BADA MAIDAN BANDA BANDA BANDA UTTAR PRADESH 210001 | BANDA | UTTAR PRADESH | 210001 | L2 | Rejected-AOC Found 2nd Higher | |
| 3 | L3₹1.3 L+₹6,485 (5.30%)Rejected-AOC | L3 | Rejected-AOC Found 3rd Highest |
Tender Value
₹1.3 L
EMD Value
₹1,500
Closing Date
29 May 2020, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER, EDC, BANDA
INDIRA NAGAR, BANDA
Electrification of New Bas Station Campus, Banda under Full Deposit Scheme under EUDD, Banda
2020_DVVNL_442675_2
97/SE/EDCB/2019-20
Open Tender
Electrical Works
Item Rate
60 days
BANDA TOWN
AS PER ANNEXURED
2 documents required · 2 mandatory
₹1,180
DVVNL
₹1,500
O/O SE, EDC, BANDA
19 Aug 2021
12 May 2020
29 May 2020
12 May 2020
29 May 2020
12 May 2020
28 May 2020
180 days
Amount
The work of ERECTION of 100 KVA CAPACITY SUB-STATION & PLINTH ALONGWITH FANCING OF SUB-STATION on 11 Mtr. long ST Poles with ACSR Weasel Conductor/XLPE Cable for giving new connection to New Bus Station Campus, Civil Line, Banda fed from 33/11 KV SUB-STATION, CHILLA ROAD, BANDA at EDSD, CHILLA ROAD, BANDA at EDSD, CHILLA ROAD, BANDA under FULL DEPOSIT SCHEME YEAR 2019-20 as per Passed Package No. 24/BT/DEP./2019-20 under EUDD, BANDA, detail of the work as given below :-
Safely cartage of 11 Mtr. long ST poles from store centre to the work site through the Kachha Pacca road including the work of loading, unloading & dragging at the respective ends.
Safely cartage of line material from store centre to the work site through the Kachha Pacca road including the work of loading, unloading & dragging at the respective ends.
Erection of Single Support Structure on 11 Mtr. long ST poles, including complete HT/LT fittings as per direction of Engineer incharge/RESSPO manual, including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection of Double Pole Structure on 11 Mtr. long ST poles, including complete HT/LT fittings as per direction of Engineer incharge/RESSPO manual, including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection and grouting of stay set including the work of nozelling etc. as per RESSPO manual and also including the cost of all grouting material.
Earth of each support by earthing rod with complete fittings as per RESSPO schedule.
Laying, Sagging & Stringing of ACSR Weasel Conductor of all the 3 Phase with proper binding of conductor with insulator fixing of armour rod, jumpering & jointing of conductor (where necessary) as laid down in RESSPO schedule.
Concreting/Grouting of newly erected Single Support Structure on 11 Mtr. long ST poles as per direction of supervising engineer/RESSPO manual. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement, including the cost of labour, T&P and carrier etc. required for proper completion of work.
Concreting/Grouting of newly erected Double Pole Structure on 11 Mtr. long ST poles as per direction of supervising engineer/RESSPO manual. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement, including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing of T-Off Channel with fitting of all accessories as per norms.
Fixing of Top Channel with fitting of all accessories as per norms.
Fixing of Dropper Channel with fitting of all accessories as per norms.
Digging of trench 600x600 deep for 11 kV XLPE Cable 3x70 mm2 protecting through first class brick layer arround the cable with sand filling.
Laying of 11 KV under ground XLPE Cable 3x70 mm2 with sand & bricks.
Filling of 11 KV XLPE cable jointing kit of indoor type of size 3x70 sq.mm.
Filling of 11 KV XLPE cable jointing kit of outdoor type of size 3x70 sq.mm.
Cartage, erection & installation of pilfer proof metering cubicle equipment as per RESSPO manual.
Cartage, erection & installation of 3 Phase 4 Wire Static TVM 11 KV Meter as per RESSPO manual.
Mounting of cable boxes with G.I. pipe 6 inch dia for the protection of cable with clamping the same on D/P.
Fixing of Danger Board on 11 KV single/double pole structure
Cartage, erection & installation of 11 KV CT/PT Combined Unit Pole mounted as per RESSPO manual.
ERECTION, INSTALLATION, FIXING CAREFULLY & SAFELY OF FOLLOWING MATERIALS ALONG WITH IT'S CARTAGE/TRANSPORTATION FROM ESC TO WORK SITE :-
Construction of new 100 KVA Transformer plinth of size 3460x4460x550 mm above ground level and one ft. below the ground level of 9”. After excavation of 4” earth, brick ballast shall be provided and rammering will be done properly. After that a retaining wall of 9” width by first class brick in ratio 1:5 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. After this brick ballast shall be provided up to 6” from the earth level and proper rammering shall be done. One No. Jail of 12 mm MS tore shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervising Engineer.
Safely cartage of 100 KVA Capacity Transformer complete from store centre to the work site through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work.
Installation of 100 KVA Capacity Transformer complete on the newly erected double pole structure/plinth in proper alignment and as per direction of supervising engineer/RESSPO manual.
Construction of Pale fencing & painting of Sub-Stations
Construction of toe wall 9" wide 1' high above ground, all around the plinth/DP structure in 1:6 ratio of cement and coarse sand. The toe wall shall have pocket of 1200 mm size at the center of toe wall at appropriate places for grouting of MS Angle iron frames toe wall may very as per site conditions.
Grouting & fixing of MS Angle iron frame in 1:2:4 ratio of cement, stone grit & coarse sand and bolting the frames with at joining frames by 35x8 mm bolt with nut. The size of MS Angle Iron frame may very as per requirement of site.
Fabrication & Providing Gate in front of plinth/DP made in two leaves of size 900x1500 mm each. Each leave shall be made by MS Angle iron of 37x37x5 mm MS Angle and fitted with wire mesh or pale fencing of 18 SWG with the help of MS Strip of 35x5 mm size welded all around the frame. The leaves shall be fitted with hinges on MS Angle of size of 50x50x6 mm and shall have locking arrangement. Two gates shall be provided on such sub-station where more than one T/F are installed and that shall be counted two sub-stations.
Fixing & Grouting of main gate at S.No. 29 made of MS Angle iron frame of 37x37x5 mm and 50x50x6 mm in the ratio 1:2:4 of cement, stone grit & coarse sand in front of DP/Plinth and to provide arrangement for locking the fencing with provision of lock & key.
Plastering 10 mm thickness with cement, Mortar in ratio 1:4 cement and fine sand, including cost of all required material, labour & T&P etc.
Painting of entire metal works including wire mesh or pale fencing with super enameled primer coat of Red Oxide in two coats of British/Asian Paint thereafter painting of same work with dark blue super enameled paint in again two coats of British/Asian Paint.
Painting of Main Gate including wire mesh or pale fencing with super enameled primer coat of Red Oxide in two coats of British/Asian Paint thereafter painting of same work with dark blue super enameled paint in again two coats of British/Asian Paint.
Safe carriage of MS Angle iron frame from nearest S/S to site of work, labour cost including loading and unloading at both ends.
Safe carriage of MS Angle iron main gate from nearest S/S to site of work, labour cost including loading and unloading at both ends.
Supply of MS Clamp for MS Angle Iron frame with nut & Bolts, washer four clamp.
Supply of MS Angle Iron frame size of 37x37x5 mm for fixing of MS welded wire mesh 18 SWG or pale fencing made from MS Sheet size 1500 mm x 75 mm x 18 SWG with MS Strip of size 35x5 mm size of full frame.
M/s. SHIVOM CONSTRUCTION AND SUPPLIERS
Vijaylaxmi Arthmovers
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .