| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.1 LAdmitted-Finance SURAJ HOUSE KOTHI NO 1614 SECTOR 7E FARIDABAD HR | FARIDABAD | FARIDABAD | HARYANA | ₹38.1 L | L1 | Admitted-Finance |
| 2 | L2₹39.4 L+₹1.3 L (3.41%)Admitted-Finance FLAT NO F2 BLOCK A FIRST FLOOR THE LEGACY APARTMENT AIRPORT ROAD GOLA KA MANDIR GWALIOR MP 474005 | GWALIOR | GWALIOR | MADHYA PRADESH | 474005 | ₹39.4 L+₹1.3 L (3.41%) | L2 | Admitted-Finance |
| 3 | L3₹41.2 L+₹3.1 L (8.13%)Admitted-Finance D 662 WZ 1598 R 1 NANGAL RAYA NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | ₹41.2 L+₹3.1 L (8.13%) | L3 | Admitted-Finance |
| 4 | L4₹42.5 L+₹4.4 L (11.5%)Admitted-Finance | ₹42.5 L+₹4.4 L (11.5%) | L4 | Admitted-Finance |
| 5 | L5₹44.3 L+₹6.2 L (16.4%)Admitted-Finance HOUSE NO 142 GALI NO 07 PREM VIHAR NANGLI SAKRAWATI NAJAFGARH NEW DELHI 110043 | NEW DELHI | NAJAFGARH | DELHI | 110043 | ₹44.3 L+₹6.2 L (16.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Tushar engineers L12 | B.R. Enterprises L11 | Deven Associates L8 | jain associates L4 | SHIVA ENTERPRISES L3 | PRASAD ELECTRICALS L6 | AMIT ENTERPRISES L9 | Jai Mahakaal Construction L2 | Yadav Enterprises L7 | SALUJA CONSTRUCTION CO L10 | S K ENGINEERS AND CONTRACTOR L5 | AJIT PARKASH BREJA L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1.5 metre depth and getting out in any type of soil for taking out/laying of pipe complete all as specified and as directed | 610 | CUM | 380 ₹2,31,800 | 150 ₹91,500 | 199 ₹1,21,390 | 185 ₹1,12,850 | 199 ₹1,21,390 | 255 ₹1,55,550 | 222 ₹1,35,420 | 220 ₹1,34,200 | 120 ₹73,200 Lowest | 150 ₹91,500 | 200 ₹1,22,000 | 250 ₹1,52,500 |
| 2.00 | Returning filling in, including spreading, leveling, watering and well ramming in layers not exc. 25 cm thick complete all as specified and directed. | 549 | CUM | 300 ₹1,64,700 | 90 ₹49,410 | 69 ₹37,881 | 105 ₹57,645 | 19 ₹10,431 Lowest | 133 ₹73,017 | 222 ₹1,21,878 | 100 ₹54,900 | 40 ₹21,960 | 45 ₹24,705 | 30 ₹16,470 | 110 ₹60,390 |
| 3.00 | Removal of excavated material from site to a distance not exceeding 50 meters away and depositing where directed at a level not exceeding 1.5 meters above the starting point complete all as specified and directed. | 61 | CUM | 290 ₹17,690 | 90 ₹5,490 | 119 ₹7,259 | 155 ₹9,455 | 31 ₹1,891 | 143 ₹8,723 | 222 ₹13,542 | 100 ₹6,100 | 40 ₹2,440 | 45 ₹2,745 | 30 ₹1,830 Lowest | 250 ₹15,250 |
| 4.00 | Excavation in trenches by cutting of road crossing, PCC hard standing for taking out/laying of pipe lines including PCC (1:2:4) type B-2 (with 40 mm graded aggregate) in foundations,filling and mass concrete complete including making good the existing surface complete all as specified and directed. | 0.5 | CUM | 3,190 ₹1,595 | 2,500 ₹1,250 | 769 ₹384.5 | 2,620 ₹1,310 | 4,500 ₹2,250 | 2,354 ₹1,177 | 444 ₹222 Lowest | 3,000 ₹1,500 | 6,000 ₹3,000 | 2,500 ₹1,250 | 5,000 ₹2,500 | 2,500 ₹1,250 |
| 5.00Taking up GI/CI/MS Pipes including all fitting of the following sizes as specified and directed by Engineer-in-Charge :- | |||||||||||||||
| 5.01 | 80 mm bore | 99 | RM | 50 ₹4,950 | 170 ₹16,830 | 69 ₹6,831 | 30 ₹2,970 | 29 ₹2,871 | 55 ₹5,445 | 9 ₹891 Lowest | 50 ₹4,950 | 20 ₹1,980 | 25 ₹2,475 | 50 ₹4,950 | 35 ₹3,465 |
| 5.02 | 100 mm bore | 490 | RM | 70 ₹34,300 | 190 ₹93,100 | 89 ₹43,610 | 32 ₹15,680 | 39 ₹19,110 | 55 ₹26,950 | 9 ₹4,410 Lowest | 60 ₹29,400 | 20 ₹9,800 | 25 ₹12,250 | 50 ₹24,500 | 35 ₹17,150 |
| 5.03 | 150 mm bore | 440 | RM | 80 ₹35,200 | 240 ₹1,05,600 | 99 ₹43,560 | 68 ₹29,920 | 49 ₹21,560 | 55 ₹24,200 | 9 ₹3,960 Lowest | 65 ₹28,600 | 30 ₹13,200 | 25 ₹11,000 | 50 ₹22,000 | 55 ₹24,200 |
| 5.04 | 200 mm bore | 150 | RM | 90 ₹13,500 | 295 ₹44,250 | 139 ₹20,850 | 99 ₹14,850 | 59 ₹8,850 | 55 ₹8,250 | 9 ₹1,350 Lowest | 70 ₹10,500 | 30 ₹4,500 | 25 ₹3,750 | 50 ₹7,500 | 110 ₹16,500 |
| 6.00Supply, laying jointing, testing of DI pipe with class-K-7 spigot socketed ends, conforming to IS-8329 laid in trenches including providing route indicators of suitable height and laying at spacing of @ 50m center to center at GL mentioning name of contractor, date of execution & CA No with name of work & rubber gasket (Tyton) joints with jointing material & route indicators of the following sizes including taking down of existing CI/DI pipe complete all as specified and directed by Engineer-in-Charge. Note 1: - Excavation & earth work shall be measured and paid seperately under respective items of BOQ. Note 2:- Contractors will provide route indicators mild steel body with top 150 mm plate 3mm thick and height not less than 300mm above finished GL at suitable intervals as directed by EIC. Cost of route indicators shall be deemed included in quoted unit rates. Note 3:- Layout plan for laying of DI pipe shall be given by EIC in writing. | |||||||||||||||
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
6 Aug 2026, 6:00 pmClosed
GE U WATER SUPPLY DELHI CANTT 10
GE U WATER SUPPLY DELHI CANTT 10
REPAIR MAINTAINANCE REPLACEMENT OF WATER PIPE LINE AT MOUDE ROAD AREA ARJAN VIHAR CARRIAPPA VIHAR AREA PRATAP CHOWK KHYBER LINES MANEKSHAW CENTRE PUMP HOUSE BAIRD PLACE IN THE AREA OF AGE U WATER SUPPLY NO II UNDER GE U WATER SUPPLY DELHI CANTT 10
2026_MES_778927_1
GE/WS/Token No-32 OF 2026-27
Open Tender
Civil Works
Item Rate
270 days
GE U WATER SUPPLY DELHI CANTT 10
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
GE U WATER SUPPLY DELHI CANTT 10
₹96,000
Yes
8 Sept 2026
16 Jul 2026
8 Aug 2026
16 Jul 2026
6 Aug 2026
31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1.5 metre depth and getting out in any type of soil for taking out/laying of pipe complete all as specified and as directed | 610 | CUM | 22 | ₹13,420 |
| 2 | Returning filling in, including spreading, leveling, watering and well ramming in layers not exc. 25 cm thick complete all as specified and directed. | 549 | CUM | 22 | ₹12,078 |
| 3 | Removal of excavated material from site to a distance not exceeding 50 meters away and depositing where directed at a level not exceeding 1.5 meters above the starting point complete all as specified and directed. | 61 | CUM | 22 | ₹1,342 |
| 4 | Excavation in trenches by cutting of road crossing, PCC hard standing for taking out/laying of pipe lines including PCC (1:2:4) type B-2 (with 40 mm graded aggregate) in foundations,filling and mass concrete complete including making good the existing surface complete all as specified and directed. | 0.5 | CUM | 22 | ₹11 |
| 5Taking up GI/CI/MS Pipes including all fitting of the following sizes as specified and directed by Engineer-in-Charge :- | |||||
| 5.01 | 80 mm bore | 99 | RM | 22 | ₹2,178 |
| 5.02 | 100 mm bore | 490 | RM | 22 | ₹10,780 |
| 5.03 | 150 mm bore | 440 | RM | 22 | ₹9,680 |
| 5.04 | 200 mm bore | 150 | RM | 22 | ₹3,300 |
| 6Supply, laying jointing, testing of DI pipe with class-K-7 spigot socketed ends, conforming to IS-8329 laid in trenches including providing route indicators of suitable height and laying at spacing of @ 50m center to center at GL mentioning name of contractor, date of execution & CA No with name of work & rubber gasket (Tyton) joints with jointing material & route indicators of the following sizes including taking down of existing CI/DI pipe complete all as specified and directed by Engineer-in-Charge. Note 1: - Excavation & earth work shall be measured and paid seperately under respective items of BOQ. Note 2:- Contractors will provide route indicators mild steel body with top 150 mm plate 3mm thick and height not less than 300mm above finished GL at suitable intervals as directed by EIC. Cost of route indicators shall be deemed included in quoted unit rates. Note 3:- Layout plan for laying of DI pipe shall be given by EIC in writing. | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_872431.xls
BOQ • 0.49 MB
tender.pdf
Tender Documents • 0.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .