Tender Value
₹24.4 L
EMD Value
₹50,000
Closing Date
10 Oct 2023, 9:00 amClosed
SE EUDC ALIGARH
LAL DIGGI ALIGARH
Various electric work against Business Plan 2023-24 for quality power supply in Aligarh City on Semi Turn-key Basis under the area EUDD-4 Aligarh
2023_DVVNL_837998_1
EUDCA-36/2023-24
Open Tender
Electrical Works
Turn-key
90 days
EUDD-3 ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
DVVNL AGRA
₹50,000
17 Oct 2023
14 Sept 2023
10 Oct 2023
14 Sept 2023
10 Oct 2023
14 Sept 2023
Amount
Safe carriage of following material from Store Centre, Sarsol, Aligarh to the respective site of work including the work of its loading & unloading at the repective ends and its erection as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work as per RESSPO Norms:-
ST Pole 11 Mtrs.
Earthing Complete
11 KV XLPE Cable 3x120sq.mm.
ACSR Dog Conductor
Distribution Box with Clamp
AB Cable 3x120+1x95+x16 sq.mm.
Distribution Transformer 250 KVA
Distribution Transformer 400 KVA
11 KV D.O. Fuse Set
11 KV TPMO
11 KV Pin Insulator with Pin
11KV Disc Insulator
11KV Disc fitting
GI Wire 8 SWG
Stone Pad
Suspension Clamp with I Hook
Deadend Clamp with I Hook
11 KV cable Jointing Kit 3x120sq.mm.
Top Channel size 125x65x2240 mm.
Dropper Channel size 100x50x2028 mm.
Tee off Chennal size 125x65x1300 mm.
Clamp with nut bolt
Base Angle size 75x75x6x2028 mm.
Neutral & body earthing of Distribution Transformer by digging of pit upto water level depth (approx. 125 feet) and then inserting 1-¼” dia GI pipe of ‘A’ grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 40x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material labour, T&P, carrier etc. required for proper completion of work. The aforesaid work shall be carried out as per RESSPO norms.
Neutral & body earthing of Power Transformer by digging of pit upto water level depth (approx. 150 feet) and then inserting 1-¼” dia GI pipe of ‘A’ grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 40x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material labour, T&P, carrier etc. required for proper completion of work. The aforesaid work shall be carried out as per RESSPO norms.
Construction of plinth at various 11/0.4 KV Sub-station suitable for distribution transformer having size 5’x 5’ x 5’ out which 2’ below the ground. Work will include digging of foundation 2’ deep & brick work with Ist class bricks having cement and sand mortar of ratio 1:6 on all the walls, each of 9” thickness. The area inside the wall shall be duly filled by mud up to the height of appropriate level from ground level and shall be duly watered & rammed. Above the filling C.C. of ration 1:6:12 (Cement sand and brick ballast) giving 4” layer shall be provided. Above C.C. layer RCC layer having 4” thickness and with ratio 1:2:4 of cement sand and stone ballast shall be provided Re-enforcement shall be provided by providing net of (8 Nos. + 8 Nos.) M.S. rods of size 10 mm dia and each of 5’ length in the middle of the top of C.C. layer. The plinth shall be plastered with 12mm thick plaster in ratio 1:4 at all sides. This work will include cost of labour, T&P and all material required for construction of plinth which shall be provided by the contractor as per RESSPO Norms.
Providing and fixing of welded wire mesh fencing around transformer plinth with M.S. Angle of size 35X35X6 mm. length and 1.20 Meters height, such panels shall be supported on M.S. Angle from of size 40X40X6 mm. having 04 Nos. corner supports of height 1.65 Meters including extended legs for grouting which will be used as a door for entry of the personnel or removal/shifting of transformer with welded hinges, sliding belt etc. for locking the arrangement as per drawing and specifications the fencing will be painted one coat of red oxide primer and then two coats of bus green synthetic enamel paint. The rates should be inclusive of all materials required for proper completion of above work (length of each fencing approx. 11 Meters)
Dismantling and removal of following material from the existing line and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work.
Dismentling of 100KVA Distribution Transformer
Dismentling of 250KVA Distribution Transformer
SHARMA ELECTRIC WORKS
SANJAY ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .