| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Finance | ₹4.6 L | L1 | Admitted-Finance |
| 2 | L2₹5.0 L+₹35,140.40 (7.57%)Admitted-Finance | ₹5.0 L+₹35,140.40 (7.57%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/s Jaswantpur Filling Station L1 | M/s APOORWA ELECTRICALS L2 |
|---|---|---|---|---|---|
| 1.00 | Repairing / strengthening of 9/11 mtr. Long Steel Tubular pole by carrying out the following works including the cost of all required material.
a- Digging of pit around the pole upto suitable depth for fixing of angle support.
b- Supply and fixing of 4 nos. 1000 mm. long MS angle of size 90x90x6 mm. and welding the same around the pole for supporting the damaged area of pole, 600 mm below and above the ground level.
c- Grouting of pole in ratio 1:2:4 (cement, sand and brick ballast) and making plinth along the full length of the support angle iron 5" round the pole in ratio 1:2:4 (cement, sand and brick ballast) and 12 mm thick plastering around the plinth. | 120 | Nos. | 2,730 ₹3,86,568 | 1,803 ₹2,55,304.8 Lowest |
| 2.00 | Repairing / strengthening of 9/11 mtr. Long Steel Tubular pole by carrying out the following works including the cost of all required material.
a- Digging of pit around the pole upto suitable depth for grouting.
B- Grouting of pole in ratio 1:2:4 (cement, sand and brick ballast) and making plinth along the full length of the support angle iron 5" round the pole in ratio 1:2:4 (cement, sand and brick ballast) and 12 mm thick plastering around the plinth. | 110 | Nos. | 600 ₹77,880 Lowest | 1,882 ₹2,44,283.6 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
9 Mar 2026, 10:00 amClosed
SE EUDC FIROZABAD
SE EUDC FIROZABAD
For the work of repairing/strengthening of 9 /11 meter ST pole at various places in 04 substations under Electricity Urban Distribution Circle, Firozabad
2026_DVVNL_1114016_1
EUDC/F/T-23/2025-26
Open Tender
Electrical Works
Lump-sum
365 days
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Superintending Engineer EUDC Firozabad
₹5,000
13 Mar 2026
9 Feb 2026
9 Mar 2026
9 Feb 2026
9 Mar 2026
9 Feb 2026
Repairing / strengthening of 9/11 mtr. Long Steel Tubular pole by carrying out the following works including the cost of all required material. a- Digging of pit around the pole upto suitable depth for fixing of angle support. b- Supply and fixing of 4 nos. 1000 mm. long MS angle of size 90x90x6 mm. and welding the same around the pole for supporting the damaged area of pole, 600 mm below and above the ground level. c- Grouting of pole in ratio 1:2:4 (cement, sand and brick ballast) and making plinth along the full length of the support angle iron 5" round the pole in ratio 1:2:4 (cement, sand and brick ballast) and 12 mm thick plastering around the plinth.
Repairing / strengthening of 9/11 mtr. Long Steel Tubular pole by carrying out the following works including the cost of all required material. a- Digging of pit around the pole upto suitable depth for grouting. B- Grouting of pole in ratio 1:2:4 (cement, sand and brick ballast) and making plinth along the full length of the support angle iron 5" round the pole in ratio 1:2:4 (cement, sand and brick ballast) and 12 mm thick plastering around the plinth.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
T23.rar
Tender Documents • 19.15 MB
BOQ_2064708.xls
BOQ • 0.29 MB
DateExtension_2.pdf
PDF • 0.24 MB
DateExtension_1.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .