Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 CrAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹16.4 Cr+₹39.7 L (2.48%)Rejected-Finance KASANA TOWER V FLOOR ALPHA 1 GR NOIDA COMMERCIAL BELT GAUTAM BUDDHA NAGAR UTTAR PRADESH 201307 | NOIDA | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201307 | L2 | Rejected-Finance L2 | |
| 3 | L3₹16.8 Cr+₹79.3 L (4.96%)Rejected-Finance MADHEPURA | L3 | Rejected-Finance L3 | |
| 4 | L4₹16.8 Cr+₹82.9 L (5.18%)Rejected-Finance FLAT NO 5 IIND FLOOR SIGNATURE APARTMENT SECTOR 3A AVAS VIKAS COLONY BODLA AGRA | AGRA | AGRA | UTTAR PRADESH | L4 | Rejected-Finance L4 | |
| 5 | L5₹17.2 Cr+₹1.2 Cr (7.62%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹20.0 Cr
EMD Value
₹30.0 L
Closing Date
24 Nov 2025, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of Common Infrastructure Facilities, Convention and Exhibition Center (Building-11) in Medical Devices Park, Sector-28, YEIDA. WC-04
2025_YEIDA_1089497_17
YEA/GM(PROJECT)/2025/437 DT-04/11/2025
Open Tender
Civil Works
Fixed-rate
365 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹6,770
₹30.0 L
23 Dec 2025
11 Nov 2025
25 Nov 2025
11 Nov 2025
24 Nov 2025
11 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil works Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | Cum | - | - |
| 2 | Cartage of ballast ,kakar, coal & sand including loading & unloading but excluding stacks on pakka roads.PWD/SOR/231a | - | cum | - | - |
| 3 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 20 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 1 | Cum | 1 | ₹1 |
| 4 | Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete.(DAR/2.27/Based on UPPWD/SOR-2020) | - | Cum | - | - |
| 5 | Supplying chemical emulsion in sealed containers including delivery as specified.Chlorpyriphos/ Lindane emulsifiable concentrate of 20% | - | Ltr | 174.35 | - |
| 6 | Providing and injecting chemical emlusions for pre-construction anti-termite treatement and creating continious chemical barrier under and all round the column pits, wall trenches, excavation top surface of plinth filling, junction, external perimeter of buildings, expamsion joins surrounding of pipes and conduit etc. complete as per technical specifications. (plinth area of the building at ground level shall only be measured for payment) with chlorpyriphos/Lindance E.C. 20% with 1% concentration or equivalent under 10 years guarantee.(DAR/2.35.3.1/Based on UPPWD/SOR-2020) | - | Sqm | - | - |
| 7 | Cement concrete with 4cm gauge approved stone ballast, Coarse sand & Cement in the proportion of in 8:4:1 (8 graded stone aggregate 40 mm nominal size : 4 Coarse sand :1 Cement ) including supply of all materials, Labour, Tools & Plants etc. reqired for proper completion of the work.(UPPWD/SOR/2020/281) | - | Cum | - | - |
| 8 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone - III) : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with Coarse sand, including necessary excavation, levelling & dressing & finishing the top smooth.(DAR/4.17/Based on UPPWD/SOR-2020) | - | Sqm | 1 | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for all heights Foundations, footings, bases of columns, etc. for mass concrete (DAR/5.9.1/Based on UPPWD/SOR-2020) | 1 | Sqm | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for all heights Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.(DAR/5.9.2/Based on UPPWD/SOR-2020) | 1 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.15 MB
17.pdf
Tender Documents • 1.39 MB
BOQ_2001092.xls
BOQ • 1.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .