Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-Finance | ₹1.5 L | L1 | Accepted-Finance 1st Lowest |
| 2 | L2₹1.5 LAccepted-Finance | ₹1.5 L | L2 | Accepted-Finance 2nd Lowest |
| 3 | L3₹1.6 LAccepted-Finance B 108A SECTOR 36 GREATER NOIDA DISTT G B NAGAR UP | GREATER NOIDA | GAUTAM BUDH NAGAR | UTTAR PRADESH | ₹1.6 L | L3 | Accepted-Finance 3rd Lowest |
| Sl No | Description | Qty | Unit | M/S ABHAY CONTRACTOR L1 | SHRI HANUMAN ENTERPRISES L2 | M/s Virat Construction L3 |
|---|---|---|---|---|---|---|
| 1.00Supply of Materials | ||||||
| 1.01 | MS Nut Bolt of various size. | 10 | Kg | 160 ₹1,600 | 165 ₹1,650 | 170 ₹1,700 |
| 1.02 | PG Clamp with Nut & Bolt | 44 | No | 255 ₹11,220 | 260 ₹11,440 | 265 ₹11,660 |
| 1.03 | Stone Pad | 21 | No | 115 ₹2,415 | 120 ₹2,520 | 125 ₹2,625 |
| 2.00Errection Work | ||||||
| 2.01 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 0-30 K.M.) and unloading, with errection of 8.5 meter long PCC Pole with complete fitting as per respo norms. | 19 | No | 2,950 ₹56,050 | 3,000 ₹57,000 | 3,100 ₹58,900 |
| 3.00 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 0-30 K.M.) and unloading, with errection of 11 meter STP Pole with complete fitting as per respo norms. | 2 | No | 3,490 ₹6,980 | 3,500 ₹7,000 | 3,600 ₹7,200 |
| 4.00 | Safe Loading, Carriage from Store Center Chilbila Pratpagarh to work site (Distance 10-70 K.M.), unloading, and laying of 11 KV XLPE 3x70 sq.mm. overhead cable with other line Materials and supporting | 1,300 | Meter | 45 ₹58,500 | 50 ₹65,000 | 55 ₹71,500 |
| 5.00 | Filling of 11 KV 3x70 sq.mm. XLPE outdoor Cable Jointing kit with cable end | 2 | No | 2,995 ₹5,990 | 3,000 ₹6,000 | 3,100 ₹6,200 |
| 6.00 | Erection of 11 KV 3x70 sq.mm. XLPE Cable Jointing straight through kit. | 2 | No | 995 ₹1,990 | 1,000 ₹2,000 | 1,100 ₹2,200 |
Tender Value
₹1.5 L
EMD Value
₹1,550
Closing Date
28 Feb 2026, 12:00 pmClosed
Superintending Engineer
Electricity Distribution Circle, Near Electricity Workshop Chilbila Pratapgarh
Electrification work in Critical Gaps Scheme of Electricity Distribution Division Pratapgarh on semi turnkey basis including loading and unloading of material.
2026_PVVNV_1112400_2
62/EDCP/2025-26
Open Tender
Electrical Works
30 days
E.E. EDD Pratapgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
S.E. EDC Pratapgarh
₹1,550
9 Mar 2026
20 Feb 2026
28 Feb 2026
20 Feb 2026
28 Feb 2026
20 Feb 2026
Supply of Materials
MS Nut Bolt of various size.
PG Clamp with Nut & Bolt
Stone Pad
Errection Work
Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 0-30 K.M.) and unloading, with errection of 8.5 meter long PCC Pole with complete fitting as per respo norms.
Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 0-30 K.M.) and unloading, with errection of 11 meter STP Pole with complete fitting as per respo norms.
Safe Loading, Carriage from Store Center Chilbila Pratpagarh to work site (Distance 10-70 K.M.), unloading, and laying of 11 KV XLPE 3x70 sq.mm. overhead cable with other line Materials and supporting
Filling of 11 KV 3x70 sq.mm. XLPE outdoor Cable Jointing kit with cable end
Erection of 11 KV 3x70 sq.mm. XLPE Cable Jointing straight through kit.
Carriage of stay Wire 7/10 SWG (500 KG) and Stringing along with 11 KV XLPE Cable as per respo norms (0-30 K.M.)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_2079283.xls
BOQ • 0.22 MB
Specification_62R.rar
Tender Documents • 0.75 MB
Download all tender documents and submit your bid