| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹408.5 CrAccepted-Finance | ₹408.5 Cr | l1 | Accepted-Finance l1 |
| 2 | L2₹41.2 L−₹408.1 Cr (99.9%)Rejected-Finance ESD NO II UHL STAGE III BVPCL CHULLAH | LANGNA | MANDYA | KARNATAKA | 571401 | ₹41.2 L−₹408.1 Cr (99.9%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical HIMACHAL PRADESH HP | - | - | Rejected-Technical NOT FULLFILL THE QUALIFING CRITERIA |
| 4 | Rejected-Technical | - | - | Rejected-Technical NOT FULLFILL THE QUALIFING CRITERIA |
Tender Value
Refer Docs
EMD Value
₹79,000
Closing Date
17 Jul 2026, 5:00 pmClosed
EE HPPWD SARAHAN
EE HPPWD SARAHAN
R/R damages on Dungaghat Kila Klanch road Km 0/0 to 22/0 (SH- C/O 6.00 mtr slab culvert at RD 18/625 ) (Sohal Ka Khala-No.2)
2026_PWD_138685_1
3874-3924
Open Tender
Civil Works - Roads
Percentage
90 days
Saarahn
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,000
₹79,000
16 Sept 2026
10 Jul 2026
18 Jul 2026
10 Jul 2026
17 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavations for structure as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material Ordinary upto 3 metre depth including carriage of materials within all leads and lifts as per drawing and technical specification 305.1 | 237.69 | Per cum | 261 | ₹62,037.09 |
| 2 | Providing concrete for plain/reinforced concrete in open foundations complete as par drawings and technical specifications C- 802, 803, 1202 & 1203 P.C.C grade M 10 (i) Nominal mix 1:3:6. aggregate 20 mm nominal size.including carriage of all labour equipments and materials to various locations through all modes of transportation in all leads and lifts to the entire satisfaction of the Engineer-in-Charge. | 16.13 | Per cum | 6,029 | ₹97,247.77 |
| 3 | Providing concrete for plain reinforced concrete in sub structure complete as per drawing and technical specification clause 802,804,805 ,806,807,1202 &1204 Nominal mix RCC/PCC M-20 (C.C1:2:4)including carriage of all labour equipments and materials to various locations through all modes of transportation in all leads and lifts to the entire satisfaction of the Engineer-in-Charge. | - | Per cum | 6,925.1 | - |
| 4 | Providing concrete for plain reinforced concrete in open foundation complete as perr drawings and technical specifications clause 802,803,1202 &1203 RCC grade M-20 Nominal Mix 1:1.5:3 (one cement one and half sand three gradedstone aggregate including carriage of material with in all leads and lifts as per direction of Engineer in charge. | - | Per Cum | 8,775.8 | - |
| 5 | Providing concrete for plain reinforced concrete in open foundation complete as per drawing and technical specifications clause 802,803,1202 & 1203 PCC grade M-10 Nominal mix 1:3:6 ( one cement: three sand:six graded stone aggregate) including carriage of materials with in all leads and lifts as per direction of Engineer-in- charge | 6.86 | Per Cum | 6,029 | ₹41,358.94 |
| 6 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202.including carriage of all labour equipments and materials to various locations through all modes of transportation in all leads and lifts to the entire satisfaction of the Engineer-in-Charge. | 7.99 | Per MT | 91,770.6 | ₹7,33,247.09 |
| 7 | Providing weep holes in brick masonry/ stone masonry, plain/reinforced concrete abutment, wing walls, return wall with 100mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20 (H) towards drawing face complete as per drawing and technical specification clauses 614, 709,1204.3.7. including carriage of all labour equipments and materials to various locations through all modes of transportation in all leads and lifts to the entire satisfaction of the Engineer-in-Charge. | 62 | Each | 280 | ₹17,360 |
| 8 | Drainage spout complete as per drawing and technical specification clause 1209including carriage of all labour equipments and materials to various locations through all modes of transportation in all leads and lifts to the entire satisfaction of the Engineer-in-Charge. | 5.4 | Per Rmt. | 1,616.9 | ₹8,731.26 |
| 9 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 in granular material.including carriage of all labour equipments and materials to various locations through all modes of transportation in all leads and lifts to the entire satisfaction of the Engineer-in-Charge. | 135.58 | Per cum | 789.6 | ₹1,07,053.97 |
| 10 | Stone soling properly hand-packed filling interstices with kharanja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materails moorum or earth etc. complete as per HPPWD specification 100 mm spread thickness (finished work including materials and labour) | 6.3 | Per cum | 872.43 | ₹5,496.31 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_205425.xls
BOQ • 0.25 MB
SBD.pdf
Tender Documents • 3.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .