| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.3 Cr+₹10.2 L (4.62%)Accepted-AOC | ₹2.3 Cr+₹10.2 L (4.62%) | L2 | Accepted-AOC L2 |
| 3 | L3₹2.3 Cr+₹12.6 L (5.74%)Accepted-AOC | ₹2.3 Cr+₹12.6 L (5.74%) | L3 | Accepted-AOC L3 |
| 4 | L4₹2.3 Cr+₹13.6 L (6.20%)Accepted-AOC | ₹2.3 Cr+₹13.6 L (6.20%) | L4 | Accepted-AOC L4 |
| 5 | L5₹2.9 Cr+₹71.6 L (32.6%)Accepted-AOC CHHAPRAULI | BAHRAICH | UTTAR PRADESH | 271801 | ₹2.9 Cr+₹71.6 L (32.6%) | L5 | Accepted-AOC L5 |
Tender Value
₹3.2 Cr
EMD Value
₹6.3 L
Closing Date
5 Dec 2024, 12:00 pmClosed
SE, M.G.C.C.C-1, MEERUT
Office Of Superintending Engineer Madhya Ganga Canal Construction Circle-1 Meerut
LOT1
2024_UPIDC_978628_1
05/SE/MRT/2024-25
Open Tender
Civil Works
Item Wise
180 days
Bulandshar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹6.3 L
Yes
13 Jan 2025
30 Nov 2024
5 Dec 2024
30 Nov 2024
5 Dec 2024
30 Nov 2024
Amount
Restoration works of Surjawali from Km. 0.000 to 11.000 M.G.C. Project First Stage.
Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge.
Earth work in embankment in ordinary soil excavation to be in the of irrregular pits and earth work in embankment to be in 20 Cm. layers, Including ramming and dressinig with machenical compaction.The surface to the required levels and slopes and also including 1.50 m. lift and 30.00 m. lead. as directed by Engineer-in-charge.
C.C. Lining Work on Surjawali Dy. of MGC Ist Stage
Earth work in foundation in dry in ordinary soil including ramming and dressing the surface, including 1.50m. Lift 30m. Lead i/c filling watering excavated earth into the plinth for proper complition of work.
Providing Shuttering and centring incl all material and T&P etc. for proper complition of work.
C.C. work for sleeper cost of material and T & P etc. in 1 : 2: 4 including cost of all material,labour T&P etc. and Shuttering required for proper completion of work
Supplying /filling Local Sand under CC lining as subgrade & filter i/c cost of all material,labour T&P etc required for proper completion of work
Supply & Laying of L.D.P.E. film i/c cost of labour & T&P etc.
75 MM. Thick Lining in M20 (1:1.5:3) in bed and side slope including cost of all material,labour T&P etc. and Shuttering required for proper completion of work
Making Constraction /Contraction joint in C.C. lining in bed and side slope filling with sealing compound including cost of all material,labour,T&P etc required for proper completion of work
Construction of Outlets at Right Bank and left Bank of Surjawali Dy. From km 0.00 to km 11.000
Excavation in foundation in ordinary soil (lome,clay or sand) including lift upto 1.50M and lead upto 30M. And including filling watering and ramming of Excavated earth ito trenches or into the space between the building and the side of foundation treches or into the plinth and removal and disposal of surplus earth upto a distence of 30M. from the trenches as ditected by the Engineer-in-Charge.
Providing & Laying cement concrete in foundation 1:3:6 stone grit, sand including supply of all material, labour, tools and plants etc
Brick work in M-150 Brick 1:4 cement and coarse sand f.m of 2.20 (1 cement :4 C/A) mortar in foundation, plinth level & Super structure including supply of all materials,labour and T&P .required for proper complition
Providing and fixing of 150/110 mm Diameter HDPE pressure pipe @6kg/sqm in required length as per site and complete the work all as specified and as directed by Engr-in-Charge.
Struck deep cement pointing in 1:2 CM incl cost of material & labour T&P etc
Providing & Laying cement conc in floring or copping of wall etc. in proportion of 1:2:4 using 10-20 mm stone grit including cost of all materials, labour, T&p, etc. required for proper completion of work.
Painting Work on cemented or brick surface one prime coat & 1 coat of dry distemper in new surface including all material labour etc.
Construction of Boundry Pillars of Surjawali Dy. From Km 0.00 to 11.000
Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m.
fixing of RCC precast boundry pillar incl cost of all materials, labour and T&P etc. required for proper complition of work as per directed by engr-in-Charge.
Providing & Laying cement concrete in foundation M-15 (1:2:4) stone grit, sand including supply of all material, labour, tools and plants etc
Providing & Laying R.C.C. M-20 1:1.5:3 nominal mix with cement coarse sand and stone agg i/c all cost of material labour T&P etc.
Steel Reinforcement for RCC work i/c cost of steel, bending, binding, cutting and placing in proper position etc. required for proper completion of work.
P/F Ordinary centering & shuttering for RCC & CC works including all labour T&P etc.required for proper completion of work.
Painting of RCC precast boundry pillars of size 250mm x250mm x 900 mm including cost of material & labour and T&P etc. and writing letters including cost of material upto 15 cm height.
Constraciton of Brick soling on sevrice road of Surjawali Dy. M.G.C.Project First Stage.
Brick on edge pavement with straight over burnt brick on parties with bricks, laid dry joints filled with fine sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8") depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work..
Repairng of VRB/DRB of Surjawali Dy. at Km.0.000 to 11.000 For Madhya Ganga Canal Ist Stage
Brick Work with M-100 bricks in 1:4 CM mortar including cost of all Materials, labour] T&P etc. required Proper completion of work
Sturk Deep Cement pointing in 1:2 CM on suraface including cost of all Materials, labour] T&P etc. required Proper completion of work
One prime coat and one coat of dry distember of new work including supply all material labour T&P etc. required for proper complition of work.
Providing and fixing of hazard maker including cost of all materias, labour, t&p etc. per VRB
Providing and fixing of sign board including cost of all materias, labour, t&p etc.
painting and printing letters upto 30cm hight including supply all material labour T&P etc. required for proper complition of work. at VRB
Constraciton of Pakka Dowla For Protection Surjawali Dy. M.G.C.Project First Stage.
Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge up to a distance of 30M from the foundation trenches:
Providing and laying Cement concrete (1:3:6) with cement , coarse sand , and 25mm to 37.25mm stone grit including cost of all material, labour and T&P etc.complete.
1sr class brick work 1:4 CM m-150 Brick including cost of all material, labour, T&P etc required proper completion of work
Centering & shuttering for RCC work in etc including cost of all material labour and T&P complete
Providing and laying Cement concrete (1:2:4) with cement , coarse sand , and 25mm to 10mm stone grit including cost of all material, labour and T&P etc.complete.
Sturk Deep Cement pointing in 1:2 CM on suraface including cost of all Materials, labour] T&P etc. required Proper completion of work
Distempering Ist coat with oil bound distemper of approved brand and manufacture and of required shade on undercoated wall surface to give an even shade over an including a priming coat cement primer of approved brand and manufacture such as Berger, J&N, Shalimar, Asian Paints after thoroughly brushing the Sqm. surface free from mortar dropping and other foreign matters and also including preparing the surface even with plaster of paris or approved synthetic material and sand papered smooth including cost of all materials.
M/S GEE PEE ASSOCIATES (BID ID -4763607)
Arvind Kumar (BID ID -4765504)
K V CONSTRUCTIONS (BID ID -4763871)
M/S AJAY KUMAR (BID ID -4765249)
RAJ BAHADUR SINGH (BID ID -4762558)
M/s Amrita Kapoor (BID ID -4764149)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .