| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 CrAccepted-AOC D 172 SAKET MEERUT DISTRICT MEERUT | MEERUT | MEERUT | UTTAR PRADESH | ₹9.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹12.4 Cr+₹2.5 Cr (24.7%)Rejected-Finance | ₹12.4 Cr+₹2.5 Cr (24.7%) | L2 | Rejected-Finance L2 |
| 3 | L3₹13.0 Cr+₹3.0 Cr (30.5%)Rejected-Finance ANWALKHEDA MR | ₹13.0 Cr+₹3.0 Cr (30.5%) | L3 | Rejected-Finance L3 |
| 4 | L4₹13.0 Cr+₹3.1 Cr (31.2%)Rejected-Finance DAULAT RAM MARKET RAILWAY ROAD DADRI GAUTAM BUDH NAGAR U P | DADRI | GAUTAM BUDH NAGAR | UTTAR PRADESH | ₹13.0 Cr+₹3.1 Cr (31.2%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technical Bid Rejected by Committee |
Tender Value
₹13.1 Cr
EMD Value
₹26.2 L
Closing Date
11 Jun 2020, 4:00 pmClosed
SE MEERUT CIRCLE PWD MEERUT
SE MEERUT CIRCLE PWD MEERUT
Widening and Strengthening of Baraut-Kotana road (ODR) in District Baghpat.
2020_CEMRT_472052_1
1162/11 Cashier (CB BAG) MRT CIR/20 DT. 04.05.2020
Open Tender
Civil Works
Item Rate
360 days
EE CD PWD BAGHPAT
CLASS A
3 documents required · 3 mandatory
₹2,354
EE CD PWD BAGHPAT
₹26.2 L
Yes
SE MEERUT CIRCLE PWD MEERUT
23 Jul 2020
19 May 2020
12 Jun 2020
19 May 2020
11 Jun 2020
19 May 2020
19 May 2020
Amount
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Construction of embankment with approved material obtained from borrow pits with all lifts (Distance 1.00 km) and all leads, transporting to site, spreading, grading to required slope and mechanicalley compacting to meet requirement of table 300-2. (Ref. to Mort&H Specification No.305) Rate as per PWD SI No.253 With Royalty. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Dismantling of existing structures,like Brick soling, culverts,bridges,retaining wall and other structure comprising of brick masonary,including unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.Rate as per PWD SI No.10.29. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Resoling with dismantelled Bricks assumming 60% of the dismanteleed bricks to be non-usable (60% of Item 12)(Labur Only) .Rate as per PWD SI No.785. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Dismantling of existing structures,like Interlocking Tiles, culverts, bridges, retaining wall and other structure comprising of brick masonary,including unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202..Rate as per PWD SI No.10.29 New Item 4. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Resoling with dismantelled Interloking assumming 60% of the dismanteleed bricks to be non-usable (60% of Item 6)(Labur Only). Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam mixing 3.50% emulsion SS and 1% cement (as per ENC letter no. 368dSEi&iz0v0 fodkl@01 ljdqyj@16 fnukad 04-09-16½ specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base withn 43 grade cement or any other type as per clause 1501.2.2 (1:1.5:3) coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25mm. mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design. laid in approved fixed side form work. (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing) spreading the concrete with shovels. rakes, compacted using needle, screed and plate vibrators and finished in continuous poeration including provision of contractiion and expansion, construction joints as per norms, applying debonding strips primer, sealant, dowel bars, near approaches to bridge/ culvert and construction, joints, admixtures as approved, curing of concrete slabs for 14- days, curing conpound (where specified) and water finishing to lines and grade as per drawing and Techical specification clause 1501 including cost of polythene sheet and dowel bar and also including conplete shifting of matrials & concrete etc. (Item no. New item 9 page no 48). Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Excavation in foundation in ordinary soil (loam clay and sand) including lift upto 1.50 M and lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the side of foundation treches as per S.I. No. 251. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Cement concrete with 4 cm gauge with brick ballast, fine sand and cement in proportion 1:6:12 in foundation, mechanically mixed and vibrated including supply of all material, labour and T&P etc. required for proper completion of work. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Cement concrete with 2 cm gauge approved stone aggregate, coarse sand and cement in proportion 4:2:1 in foundation, mechanically mixed and vibrated including supply of all material, labour and T&P etc. required for proper completion of work. 279A. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Coarse Sand below Pipe. Including all taxes, labour, cess material & T.P. but excluding cost of G.S.T
Cost of RCC NP3 350mm ØHP . Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Add laying & fixing charges as per New Schedule item no. 10.27. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
M-150 class brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. (as per PWD SI No. 307). Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications SI.No. 574. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
12 mm thick plaster with 1 part of cement and 3 part of coarse sand over brick work including supply of all materials, labour and T&P etc. required for proper completion of work. As per PWD SI No. 582). Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
R.C.C. work with cement, approved coarse sand and 20 mm gauge approved stone grit in proportion of 1:1.5:3 in slabs excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. required for proper completion of work, binding wire to be supplied by the contractor free of cost. as per SI 284. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
M.S. torsteel in plain work such as R.C.C. or R.B. work including binding for proper shape and including supply of steel and its wastage, bend hooks and autorised overlapping shall be measured. As per SI 504. Including all taxes, labour, material & T.P. but excluding cost of G.S.T
White Washing two Coat in two trunks including of all materials labour tools plants etc required for proper complition of work SI No. 672. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Colour Washing two Coat in one trunks Using aooroved Colouring Brown including of all materials labour tools plants etc required for proper complition of work SI No. 675. Including all taxes, labour cess material & T.P. but excluding cost of G.S.T
Dev Yash Projects and Infrastructure Pvt. Ltd.
M/S ANIL KUMAR
M/S R.K.Gupta Contractor
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .