Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹49.9 L
EMD Value
₹49,860
Closing Date
3 Aug 2023, 4:00 pmClosed
Block Development officer tenaksi
Block Development officer tenkasi
Construction of Community Hall Building in Ambedhkar Nagar in Thiruchitrambalam Village and Panchayat in Tenkasi Panchayat Union in Tenkasi District under NNT FUND 2023-24
2023_RDTN_350377_1
BDOBLK-92-2023-A3
Open Tender
Civil Construction Goods
Item Wise
180 days
Tenkasi Panchayat Union
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹49,860
Yes
3 Aug 2023
26 Jul 2023
3 Aug 2023
26 Jul 2023
3 Aug 2023
26 Jul 2023
Amount
1.Construction of Community Hall Building in Ambedhkar Nagar in Thiruchitrambalam Village and Panchayat in Tenkasi Panchayat Union.
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for corewall etc., complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 10cum
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Above basement
Below Basement
Above Basement
Refilling the basement with excavated earth including all labour charges such as watering and ramming etc complete.
Supplying and filling of conveyed Earth by lorry in basement filling including stacking for premeasurement, conveyance loading, and unloading charges and all other incidential charges and including filling laying watering and consolidating etc., complete
Supplying and fixing of Steel Door size 0.90 mx2.10m including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and fixing of Steel Door size 1.80 mx2.10m including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and fixing of PVC Door size 0.75 mx2.10m including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and fixing window of size 1.20x1.30 including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and fixing window of size 1.50x1.30 including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and fixing of Steel Ventilators of size 0.90x0.45m including cost and conveyance of all materials to site and all labour charges etc complete.
Labour charges for fixing of steel door including cost and conveyance of all materials to site and all labour charges etc complete.
Labour charges for fixing of steel window,Ventilators including cost and conveyance of all materials to site and all labour charges etc complete.
Plastering with cement mortar 1:3 mix to 10 mm thick including Cost and Conveyance of all materials to site and all labour charges etc complete for 10 sqm.
Plastering with cement mortar 1:5 mix to 12 mm thick including Cost and Conveyance of all materials to site and all labour charges etc complete for 10 sqm.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for 10 cum
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.
White wasting two coat using shalline Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Color wasting two coat using cobt Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over New iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Supplying and fixing in Position best quality PVC Rain water pipe having ISI Mark and providing leak proof joints including fixing to the wall with special PVC/MS Clamps etc.
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
INDHU CONTRACTOR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .