Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-AOC | ₹3.0 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹3.1 Cr+₹6.0 L (1.97%)Rejected-Finance | ₹3.1 Cr+₹6.0 L (1.97%) | L2 | Rejected-Finance L2 |
Tender Value
₹3.1 Cr
EMD Value
₹3.1 L
Closing Date
9 Jan 2025, 3:00 pmClosed
Additional Collector(Dev)
DRDA,4thfloor,Collectorate,Erode
Erode District Construction of High level Bridge at Km 0.150 of Sellampooramman kovil to Check Post road across sellampooramman odai in Anthiyur Block under State Scheme for the year 2024-25.
2024_RDTN_512461_1
DIPR/5540/Tender/2024 Dt. 19.12.2024
Open Tender
Civil Works - Bridges
Item Rate
540 days
Anthiyur Block
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹3.1 L
DRDA,4thfloor,Collectorate,Erode
23 Jan 2025
20 Dec 2024
9 Jan 2025
20 Dec 2024
9 Jan 2025
27 Dec 2024
27 Dec 2024
Amount
Provision for Dismantling of Existing Structures
Dismantling the the existing RR Masonry in Cement Mortar in the existing causeway and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.
Dismantling the existing Plain Cement Concrete in the existing causeway and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.
Construction of Bridge
Earth work excavation in all classes of soil except kankar requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring strutting, walling and forming protective bunds whereever necessary etc., complete as per relevent standard specification for DRESSING THE BED UPTO SILL LEVEL. UNDER ABUTMENTS AND PIERS LOCATION.
Earthwork excavation in all classes of soil except kankar and soft rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF FOOTINGS UNDER ABUTMENTS AND PIERS.
Earthwork excavation in soft disintegrated rock not requiring blasting except hard rock requiring blastin and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF FOOTINGS UNDER ABUTMENTS AND PIERS.
Vibrated Cement Concrete of grade M-15, Nominal Mix, 1:2:4 using 20mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELLING COURSE UNDER FOOTINGS OF ABUTMENTS, WINGS AND PIERS.
Vibrated Plain Cement Concrete of grade M 20 (Design Mix 1:1.5:3) using 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for cut off wall concrete
Vibrated reinforced cement concrete M30 grade Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for FOOTINGS UNDER ABUTMENTS, RETURN WALLS AND PIERS.
Vibrated reinforced cement concrete M-30 Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for ABUTMENTS AND RETURN WALL STEM BELOW SILL.
Vibrated reinforced cement concrete M30 grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for PIER COLUMNS BELOW SILL.
Vibrated reinforced cement concrete M-30 Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for ABUTMENTS AND RETURN WALLS ABOVE SILL LEVEL.
Vibrated reinforced cement concrete M30 grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for PIER COLUMNS ABOVE SILL.
Vibrated reinforced cement concrete M-30 Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for BED BLOCK CUM DIRT WALL OVER ABUTMENTS.
Vibrated reinforced cement concrete M30 (Design mix) using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for CAPPING BEAM OVER PIER COLUMNS.
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to work site, labour charges for fixing the same in the correct position and all other incidental charges et., complete.
Vibrated reinforced cement concrete M-30, Grade, Design Mix using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges,including inspection chamber, inclusive of 150mm ducts and other accessories of footpath etc., complete for DECK SLAB as per MOST DRG NO. SD/241 & SD/205.
Vibrated reinforced Concrete M-30, Grade, Design Mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for RCC HAND RAILS AND POSTS OVER DECK SLAB.
Providing and fixing of Galvinised Iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.
Vibrated Cement Concrete M15, Grade, Nominal Mix, 1:2:4 using 20mm ISS hard granite broken metal including cost and conveyance of all materials to site and cement at site including cost of formwork,lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in heights and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for BASE COURSE BELOW APPROACH SLAB
Vibrated Reinforced Cement Concrete M-30, Grade, Design Mix, using ISS graded hard granite broken metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, laying, curing concrete, working at heights,hire charges for tools and plants, including all other incidental chages etc., complete for APPROACH SLABS.
Vibrated Cement Concrete M-20, Grade, Design Mix 1:1.5:5 , using 20mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing,transporting, laying, and curing concrete,working at heights,hire charges for tools and plants, including all other incidental rges,etc.,complete as per standard specification for PCC PARAPET OVER APPROACHES.
Vibrated Cement Concrete M-30, Grade, Design Mix, using 65% of 25mm, 25% of 12mm and 10% of 6mm IRC size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for wearing cost of 75mm uniform thickness over deck slab and approach slab.
supplying & fixing 300 mm wide PVC Expansion joint in the 20 mm expansion gap provided in between Decks over Piers and in between deck and dirt wall over abutment as shown in the drawing including cost & conveyance of expansion joints including Shalimar Pad and Joint sealant etc., complete.
Providing and fixing seepage pipes of 100mm dia. PVC pipes of requied lengths for abutments and wngs including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill IN BETWEEN THE ABUTMENTS AND WINGS, -
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges " Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.
Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc,complete.
Supply and Fabrication of High Yield Strength Deformed Bar with Grade Designation Fe-500, conforming to IS:1786-1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlaping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete,Fe-500 grade.
Upto 16mm dia.
Above 16mm dia.
Whitewashing for Abutment and Pier Substructure using two coats of freshly burnt Shell lime
Enamel painting for Crashbarrier and Deck both end face using two coat of enamel paint
Provision for RCC Retaining wall
Earth work excavation in al classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS208, including cost of all labour, equipments and all other incidental charges such as bailing out water providing and maintaining necessary cofferdams, sheeting, shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and constructions, trimming bottom of excavation backfilling, and clearing the sits and disposal of all surplus materials etc, complete as per relevant standard specification for FOUNDATION OF RETAINING WALLS.
Vibrated Cement Concrete of Grade M-15, Nominal Mix, 1:2:4, using 20mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELLING COURSE BELOW THE FOOTINGS OF RCC RETAINING WALLS.
Vibrated Reinforced Cement Concrete M30 Design Mix Using 20mm &12mm Metal, including cost and conveyance of all materials to site and cost cement at site but excluding cost and fabrication of steel, but, including all labour charges for mixing concrete, laying, curing concrete, working at heights, soft water, hire charges for tools and plants, including all other incidental charges, etc., complete for FOOTINGS OF RCC RETAINING WALLS.
Providing and fixing PVC seepage pipes of 100mm dia. PVC pipes of requied lengths for abutments and wngs including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill IN BETWEEN THE RETAINING WALLS.
Vibrated Reinforced Cement Concrete M30 Design Mix Using 20mm &12mm Metal, including cost and conveyance of all materials to site and cost cement at site but excluding cost and fabrication of steel, but, including all labour charges for mixing concrete, laying, curing concrete, working at heights, soft water, hire charges for tools and plants, including all other incidental charges, etc., complete for STEM OF RCC RETAINING WALLS.
Supply and Fabrication of High Yield Strength Deformed Bar with Grade Designation Fe-500, conforming to IS:1786-1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete,Fe-500 grade.
Provision for PCC Retaining wall
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Cement Concrete M15 Grade, Nominal mix using 20mm&12mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification Levelling course
Cement Concrete M20 Grade, Design mix using 20mm&12mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification (Footing)
Cement Concrete M20 Grade, Design mix using 20mm&12mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification (Stem)
Providing and fixing seepage pipes of 100mm dia. PVC pipes of required length for Retaining wall including cost and conveyance of all materials to work site, cost and labour charges for for fixing complete.
White washing one coat with freshly burnt white shell lime in all floors including cost of lime, blue powder, fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed by the departmental officers.
Approach Road
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Eath for formation of Approach Road.
98% COMPACTION
100% COMPACTION
Providing and Laying Granular Sub base as per table No 400-1/400-2 and Grading I of MORTH Revision IV with and any other Granular material or a combination those of for 200 mm thick to give a CBR of 30 % on prepared sub grade in accordance with the requirements of the specifications For Aggregate Mix
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Bituminous Concrete of 25 mm thick shall consist of Construction in a single couse of compacted crushed aggregates premixed with bituminous binder of 80/100 grade at the rate of 3.5 % by weight of total mix to serve as base / binder course in accordance with MORTH rev IV cl.504 specification and in confirmity with drawing.
Supply and fixing of NP 3 class RCC 900 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 1989 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete for culvert.
Name Board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package}
ANBURAJ K C (BID ID -1224868)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .