Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.2 LAccepted-AOC MES COLONY KUMBHIGRAM AIRPORT CACHAR ASSAM 788109 | KUMBHIGRAM | CACHAR | ASSAM | 788109 | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹23.5 L+₹71,162.27 (3.12%)Rejected-Finance 01 CHANGSARI KAMRUP ASSAM 781101 | KAMRUP | ASSAM | 781101 | L2 | Rejected-Finance Other than L1 Bidder | |
| 3 | L3₹24.0 L+₹1.2 L (5.26%)Rejected-Finance 30 1 PULIN KHATICK ROAD TANGRA TANGRA KOLKATA WEST BENGAL 700015 | KOLKATA | WEST BENGAL | 700015 | L3 | Rejected-Finance Other than L1 Bidder |
| Sl No | Description | Qty | Unit | A K ENTERPRISE L2 | Goswami Traders L1 | M/s DAS AND CO L3 |
|---|---|---|---|---|---|---|
| 1.00 | Taking down Shutters of any description n exc 1 sq. m each removing to store complete all as specified and as directed. | 25 | Per Leaf | 40 ₹1,000 | 23 ₹575 Lowest | 25 ₹625 |
| 2.00 | Taking down Shutters of any description exc 1 sq. m and n exc 2 sq. m each removing to store complete all as specified and as directed. | 65 | Per Leaf | 45 ₹2,925 | 23 ₹1,495 Lowest | 25 ₹1,625 |
| 3.00 | Taking down chowkats or frames with shutters (without taking off shutters from the frame) area n.exc. 1.5 Sqm including builders hardware each complete all as specified and as directed. | 30 | Each | 70 ₹2,100 | 51 ₹1,530 | 30 ₹900 Lowest |
| 4.00 | Taking down chowkats or frames with shutters (without taking off shutters from the frame) area exceeding 1.5 Sqm but not exceeding 4 Sqm each including builders hardware complete all as specified and as directed. | 27 | Each | 70 ₹1,890 | 60 ₹1,620 | 30 ₹810 Lowest |
| 5.00 | Taking down shutter of any description exc 1 sqm but nexc 2 sqm each leaf and refixing in same opening after cutting or eased the same complete all as specified and as directed. | 20 | Each | 50 ₹1,000 | 29 ₹580 | 28 ₹560 Lowest |
| 6.00 | Hacking out old broken glass (any thickness, quality or description) from wooden frame or stone concrete or brick surrounds, glazed with putty or fixed with beads complete all as specified and directed. | 75 | Sqm | 10 ₹750 | 6 ₹450 Lowest | 25 ₹1,875 |
| 7.00 | Taking up or down GI tubing 15 mm bore from trenches/wall including all fittings segregated and stacking the pipe complete all as specified and directed. | 200 | RM | 20 ₹4,000 | 17 ₹3,400 | 15 ₹3,000 Lowest |
| 8.00 | Taking up or down GI tubing 20 mm bore from trenches/wall including all fittings segregated and stacking the pipe complete all as specified and directed. | 40 | RM | 20 ₹800 | 17 ₹680 Lowest | 18 ₹720 |
| 9.00 | Dismantling PVC (SWR) pipe of any description complete all as specified and as directed. | 35 | Rm | 10 ₹350 Lowest | 11 ₹385 | 35 ₹1,225 |
| 10.00 | Demolition of concrete in ground floors and pavings exc 15 cm thickness ( below or above ground level) & also removing the debris to the out side of MD land complete all as specified and as directed. | 2 | Cum | 400 ₹800 | 331 ₹662 Lowest | 350 ₹700 |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
11 Aug 2026, 6:00 pmClosed
GE Narangi
GE Narangi c/o 99 APO
CERTAIN PETTY B/R REPAIRS DAY TO DAY MAINTENANCE OF PH-I AREA UNDER GE NARANGI
2026_MES_778597_1
8245/B/E8
Open Tender
Civil Works
Item Rate
180 days
Guwahati
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE Narangi
₹50,000
Yes
30 Sept 2026
15 Jul 2026
13 Aug 2026
15 Jul 2026
11 Aug 2026
29 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down Shutters of any description n exc 1 sq. m each removing to store complete all as specified and as directed. | 25 | Per Leaf | - | - |
| 2 | Taking down Shutters of any description exc 1 sq. m and n exc 2 sq. m each removing to store complete all as specified and as directed. | 65 | Per Leaf | - | - |
| 3 | Taking down chowkats or frames with shutters (without taking off shutters from the frame) area n.exc. 1.5 Sqm including builders hardware each complete all as specified and as directed. | 30 | Each | - | - |
| 4 | Taking down chowkats or frames with shutters (without taking off shutters from the frame) area exceeding 1.5 Sqm but not exceeding 4 Sqm each including builders hardware complete all as specified and as directed. | 27 | Each | - | - |
| 5 | Taking down shutter of any description exc 1 sqm but nexc 2 sqm each leaf and refixing in same opening after cutting or eased the same complete all as specified and as directed. | 20 | Each | - | - |
| 6 | Hacking out old broken glass (any thickness, quality or description) from wooden frame or stone concrete or brick surrounds, glazed with putty or fixed with beads complete all as specified and directed. | 75 | Sqm | - | - |
| 7 | Taking up or down GI tubing 15 mm bore from trenches/wall including all fittings segregated and stacking the pipe complete all as specified and directed. | 200 | RM | - | - |
| 8 | Taking up or down GI tubing 20 mm bore from trenches/wall including all fittings segregated and stacking the pipe complete all as specified and directed. | 40 | RM | - | - |
| 9 | Dismantling PVC (SWR) pipe of any description complete all as specified and as directed. | 35 | Rm | - | - |
| 10 | Demolition of concrete in ground floors and pavings exc 15 cm thickness ( below or above ground level) & also removing the debris to the out side of MD land complete all as specified and as directed. | 2 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
8245Tender.pdf
Tender Documents • 0.49 MB
BOQ_872047.xls
BOQ • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .