Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹8.1 L
EMD Value
₹8,100
Closing Date
19 Feb 2024, 2:00 pmClosed
SE EUDC-X
EUDC-X PURINIYA ALIGANJ LESA TG LUCKNOW
Testing of protective system of power transformer, 11 KV switchgear, 33 KV control panels and 33KV VCBs installed at various 33 11 KV Sub-Stations Under work area of EUTD X LESA Transgomti Lucknow.
2024_MVVNL_893980_1
74/EUDC-X/2023-24
Open Tender
Electrical Works
Item Wise
365 days
EUTD-X LESA LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EE EDD BKT LESA LUCKNOW
₹8,100
27 Feb 2024
10 Feb 2024
19 Feb 2024
10 Feb 2024
19 Feb 2024
10 Feb 2024
Amount
Testing of 11 KV VCBs PANEL
Testing of CT's with primary injection set of its metering core and protection core at various ratios and current. Testing for equipment to earth megger value.
Testing of PT with three phase supply for ratio and polarity check. Insulation check by 5KV Megger.
Testing of all relays of the breaker being tested for its proper functioning and tripping within set time and fault clearance timing.
Testing of mastertrip relay that it is operating in time from getting signal and operates for tripping coil.
Testing of breaker operation and functionality that each part of breaker (gear, tripping coil, plunger, springs etc.) operates and break supply and measurement of total fault clearance time.
Providing and installation of TRIPPING COIL/CLOSING COIL 11kV VCB Panel schneider/CGL/STELMEC/PASCAL etc make .
Providing and installation of auxilliary/Rotary switch 11kV VCB Panel schneider/CGL/STELMEC/PASCAL etc make .
Measurement of leakage current of VCB.
Testing of battery and battery charger.
Testing of earthing of VCBs with earth resistivity tester for earth results.
Testing of 33 KV VCBs.
Testing of 33 KV CTs, PTS
Testing and functionality of 33KV relays.
Overall testing of tripping mechanism for local and remote.
Routine Testing of power transformer (Ratio, Megger, Magnetic Balance,Magnetizing Current,Short Circuit, Temperature Setting and Tripping. Bucholz, Winding Resistance, Differential if operative.
Testing of earthing of transformer body and neutral earthing.
Emergency Routine Testing of power transformer (Ratio, Megger, Magnetic Balance,Magnetizing Current,Short Circuit, Temperature Setting and Tripping. Bucholz, Winding Resistance, Differential if operative.
Testing of transformer oil BDV from NABL Accredieted Lab
Replacement of E/F,O/C relays works includes Opening of wiring of defective relay and dismantling from panel.If required Making housing in existing panel according to new relay size and fitting in panel.(Metal plate with colour code as existing panel/screw required for fixing of new relay in panel will be provided by contractor.)Making Interconnection and termination of wire with ferulle and lug of suitable size according to new relay.(Ferulle & lug will be provided by the contractor.Relays will be provided by dept.)After replacement contractor also will have to do testing of relays and checking VCB tripping by both E/F,O/C signal
Replacement of master trip relays works includes Opening of wiring of defective relay and dismantling from panel.If required Making housing in existing panel according to new relay size and fitting in panel.(Metal plate with colour code as existing panel/screw required for fixing of new relay in panel will be provided by contractor.)Making Interconnection and termination of wire with ferulle and lug of suitable size according to new relay.(Ferulle & lug will be provided by the contractor.Relays will be provided by dept.)After replacement contractor also will have to do testing of relays and checking VCB tripping by both E/F,O/C signal
Opening of termination from both ends and dismantling of defective/damage 11kV Panel CT of different ratio.Installation,commissioning and testing of new 11kV Main Panel CT of different ratio.
Opening of termination from both ends and dismantling of defective/damage 11kV Panel PT. Installation,commissioning and testing of new 11kV Main Panel PT.
Providing and installation of 11kV Panel PT HT Fuse.
Providing and installation of 33kV VCB Panel schneider/CGL/STELMEC/PASCAL etc make TRIPPING COIL/CLOSING COIL.
Providing and installation of 33kV VCB Panel schneider/CGL/STELMEC/PASCAL etc make auxilliary/Rotary switch.
PRITHVI ENTERPRISES
P. K. POWER SOLUTIONS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .