| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹36.4 LAdmitted-Finance | -17.99% | ₹36.4 L | L1 | Admitted-Finance |
| 2 | L2₹38.1 L+₹1.8 L (4.87%)Admitted-Finance | -14.00% | ₹38.1 L+₹1.8 L (4.87%) | L2 | Admitted-Finance |
| 3 | L3₹46.1 L+₹9.8 L (26.8%)Admitted-Finance VILL CHANDERYAR PO SADHOT TEHSIL DHARAMPUR DISTT MANDI H P | +4.00% | ₹46.1 L+₹9.8 L (26.8%) | L3 | Admitted-Finance |
| 4 | L4₹46.6 L+₹10.2 L (28.0%)Admitted-Finance VILL SHALLAN P O PUJARK 2 TEHSIL ROHRU DISTT SHIMLA HP | ROHRU | SHIMLA | HIMACHAL PRADESH | +5.00% | ₹46.6 L+₹10.2 L (28.0%) | L4 | Admitted-Finance |
Tender Value
₹44.4 L
EMD Value
₹88,706
Closing Date
16 Apr 2026, 6:00 pmClosed
Executive Engineer
HPPWD Rohru
R R Damage to Pujarli koti saridhar km0 00 to 15 00 SH C o improvement of narrow reaches at various RD 1 800 to 1 820 12 700 to 12 715 4 500 to 4 515 13 405 to 13 420 B wall at Rd 3 500 to 3 520 7 200 to 7 230 10 900 to 10 930 6 600 to 6 630
2026_PWD_133648_29
448-57 DATED 7-4-2026
Open Tender
Civil Works - Roads
Percentage
120 days
Rohru
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,000
₹88,706
23 Jul 2026
8 Apr 2026
17 Apr 2026
8 Apr 2026
16 Apr 2026
8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in hilly area in all heights and depths in all kinds of soil by mechanical soil i/c saturated soil comprising of ordinary soil ,soft rocks,hard rocks, chiseling , wedging out of rock (where blasting is prohibited) and other intermediate classification of soil setting out true to the required line,grade,width, cutting and trimming of side slopes and level as shown on the drawings and as desired by the Engineer-in-charge at site according to the MORD Technical Specification Clause 1603.1,1603.2 sorting out useful material and stacking the same in all leads and lift in acquired width of the road and transportation of useful material for filling of roadway ,camber, embankment for improvement and disposal of all un-useful materials from the width of the road or on approved dumping sites through all mode of transportation i/c head load or animal transport or by mechanical means along with leveling ,fine dressing and carriage of machinery , material, tools ,and safety means and other incidentals necessary to complete the work by mechanical means or labour ,if required. All useful materials such as stone, shingle, aggregates, sand shall be sorted out and stacked along the road side which shall be not less than 1/3(one-third) for blasting work hard rock, 1/6(one-sixth) for soft blasting work and 1/10 (one-tenth) for jumper work in all cases failing which recovery shall be done at the prevailing market rates. Any loss to the public property shall be the absolute responsibility of the contractor which shall be duly compensated by him as per the directions of the Engineer-in Charge i/c carriage of material within all leads and lifts The rates includes octroi , roylity, Malkana,Toll-tax,sale tax or any other tax imposed by the Government. A recovery of useful stones for 751.62 cum @ Rs300 per cum shall be done on pro-rata basis in each running bill for this item. | 5,202.6 | CUM | 363.21 | ₹18,89,611.89 |
| 2 | Excavation in soil in hilly area by manual means including cutting and trimming of side slopes and disposing of excavation earth with a lead up to 1.5m and a lead up to 20m as per drawing and technical specification clause 1603.1 | - | CUM | - | - |
| 3 | Earth work in excavation for structure as per drawing and technical specifications clause 305.1 Including setting out, construction of shoring and bracing, removal of stumps and other deleterious Material and disposal up to a lead of 50 m dressing of sides and bottom and back filling in trenches with excavated suitable materials. | - | CUM | - | - |
| 4 | Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing & technical specifications per clauses 802, 803 ,1202,1203 P.C.C.(1:6:12) | - | CUM | - | - |
| 5 | Providing and laying concrete for plain/reinforced concrete in open foundation as per drawing and technical specifications clauses 802, 803, 1202, and 1203 (c/concrete 1:4:8). | - | CUM | - | - |
| 6 | Random rubble Stone masonry in Cement mortar for substructure complete as per drawing & technical specifications Clauses 702,704 1202&1204 in Cement mortar (1:6) | - | CUM | - | - |
| 7 | Construction of dry masonry in Retaining walls, breast walls, revetment walls and parapets etc. for structures complete as per drawing and technical specifications 704.6 &1302.5. | - | CUM | - | - |
| 8 | Providing and laying of boulder apron laid in wire crates with 4mm dia.GI wire conforming to IS:280 and IS:4826in 100mm mesh (woven diagonally) including 10 percent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications clause1301. | - | CUM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.26 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
SBD29.pdf
Tender Documents • 2.50 MB
BOQ_197706.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .