| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹16.6 L
EMD Value
₹16,600
Closing Date
18 Jan 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO (VP)
Olakkur
Olakkur/AGAMT 22-23/02
2023_RDTN_278378_1
OLAKKUR/AGAMT 2022-2023/02
Open Tender
Civil Works
Works
60 days
Olakkur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹16,600
Yes
18 Jan 2023
3 Jan 2023
18 Jan 2023
3 Jan 2023
18 Jan 2023
3 Jan 2023
Amount
Construction of Girls Toilet for PUM School @ Kilmavilangai Panchayat in Olakkur Union.
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Refilling the basement with excavated earth other than sand complying the Standard specification
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly for Foundation and flooring including labour charges for mixing concrete watering and laying the concrete in layers not more the 115cms thickcompacting etc complete complying with standard specification etc complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Centring charges for all RCC item of work including cost conveyence of all charges etc.,
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Paving the Floor with Best Quality Ceramic Tiles of any approved colour and size 300 mm x 300 mm x 8 mm shape and quality laid in Cement Mortor 1 : 2 to 20 mm thick in all floors and the Top Pointed with the white cement 0.40 kg mixed with the same colouring Pigments etc complete
Dadooing Walls with Colour Designed Ceramic Glazed Tiles of size 300 mm x 200 m x 6 mm of any shape and quality laid cement mortor 1 : 2 over 10 mm base layer in all floors and the Top Pointed with the white cement 0.40 kg mixed with the same colouring Pigments etc complete
White Washing Two Coats of Painting with Primer Coat over new plastered surface and conveyance of all materils to site and all labour charges etc complete
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of Primer paint including cost of all materials and labour charges etc complete
Painting two coats over new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete
Towards watersupply and sanitary arrangemens including all cost and conveyance of all at site etc., complete
4" PVC pipe
4" PVC Tee
4" PVC Y junction
3" PVC Air pipe
PVC tap 3/4"
PVC Elbow 3/4"
PVC pipe 3/4"
1000 liter sintex tank
Wash basin
Steel Mesh for Incinerator
Supply and fixing of Doors of size 0.75x 1.80 m
Supply and fixing of Doors of size0.75x1.20 m
Towards fixing of Steel Doors of Following Size including all Cot at Site etc.,
Roofing with best quality Tuflon sheet
Cost and supply Rcc Jolly
MS Squarw Tube of 25.0x25x2.60 mm alround
Water Supply and Sanitary arrangement
Provision for Water Supply HDPE TANK 500 litres
Provision for Soak pit for septic tank
Provision for RCC cover slab for inspection chamber
Provision for Name Board charges
Provision for Photographic charges
Construction of Drainage & Vertical Filter @ Kadavampakkam Colony to Annampakkam Salai in Kadavampakkam Panchayat. In Olakkur Panchayat Union
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly for Foundation and flooring including labour charges for mixing concrete watering and laying the concrete in layers not more the 115cms thickcompacting etc complete complying with standard specification etc complete.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Sunshade, etc.)
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Construction of Vertical Soak Pit
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly for Foundation and flooring including labour charges for mixing concrete watering and laying the concrete in layers not more the 115cms thickcompacting etc complete complying with standard specification etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Centring charges for all RCC item of work including cost conveyence of all charges etc.,
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying and fixing of RCC rings 900mm dia for Leach pit including all charges etc complete
Supplying and fixing of cover slab of 900mm dia including all charges etc complete
Supplying and fixing P.V.C rainwater down fall pipe of 110m dia with necessary shoes, bends,& clamps etc.,
Filling the soak pit with 225 mm boulders as per specification
Filling the soak pit with 20mm metal as per specification
Towards labour charges for filling metal into the pipe and fixing PVC pipe etc complete.,
Filling the soak pit with 40mm metal as per specification
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and approved colour over a priming coat including through scrapping, clean removal of dirt and including necessary plaster of pairs putty, wherever required etc complete complying with standard specification
Supply of Steel mesh including all charges etc complete
Provision for Name Board charges
Provision for Photographic charges
Construction of Drainage & Vertical Filter @ Karumariyamman Kovil Street in Kadavampakkam Panchayat. In Olakkur Panchayat Union
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly for Foundation and flooring including labour charges for mixing concrete watering and laying the concrete in layers not more the 115cms thickcompacting etc complete complying with standard specification etc complete.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Sunshade, etc.)
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Construction of Vertical Soak Pit
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly for Foundation and flooring including labour charges for mixing concrete watering and laying the concrete in layers not more the 115cms thickcompacting etc complete complying with standard specification etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Centring charges for all RCC item of work including cost conveyence of all charges etc.,
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying and fixing of RCC rings 900mm dia for Leach pit including all charges etc complete
Supplying and fixing of cover slab of 900mm dia including all charges etc complete
Supplying and fixing P.V.C rainwater down fall pipe of 110m dia with necessary shoes, bends,& clamps etc.,
Filling the soak pit with 225 mm boulders as per specification
Filling the soak pit with 20mm metal as per specification
Towards labour charges for filling metal into the pipe and fixing PVC pipe etc complete.,
Filling the soak pit with 40mm metal as per specification
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and approved colour over a priming coat including through scrapping, clean removal of dirt and including necessary plaster of pairs putty, wherever required etc complete complying with standard specification
Supply of Steel mesh including all charges etc complete
Provision for Name Board charges
Provision for Photographic charges
Construction of COMMUNITY SOAK PIT (VERTICAL FILTER) With Drainage @ Arunthiyar Colony in Kadavampakkam Panchayat. In Olakkur Panchayat Union
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly for Foundation and flooring including labour charges for mixing concrete watering and laying the concrete in layers not more the 115cms thickcompacting etc complete complying with standard specification etc complete.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Sunshade, etc.)
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Construction of Vertical Soak Pit
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly for Foundation and flooring including labour charges for mixing concrete watering and laying the concrete in layers not more the 115cms thickcompacting etc complete complying with standard specification etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Centring charges for all RCC item of work including cost conveyence of all charges etc.,
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying and fixing of RCC rings 900mm dia for Leach pit including all charges etc complete
Supplying and fixing of cover slab of 900mm dia including all charges etc complete
Supplying and fixing P.V.C rainwater down fall pipe of 110m dia with necessary shoes, bends,& clamps etc.,
Filling the soak pit with 225 mm boulders as per specification
Filling the soak pit with 20mm metal as per specification
Towards labour charges for filling metal into the pipe and fixing PVC pipe etc complete.,
Filling the soak pit with 40mm metal as per specification
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and approved colour over a priming coat including through scrapping, clean removal of dirt and including necessary plaster of pairs putty, wherever required etc complete complying with standard specification
Supply of Steel mesh including all charges etc complete
Provision for Name Board charges
Provision for Photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
TDR and Co
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .