| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-AOC | ₹3.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.2 Cr+₹6.7 L (2.14%)Rejected-AOC | ₹3.2 Cr+₹6.7 L (2.14%) | L2 | Rejected-AOC L2 |
Tender Value
₹3.1 Cr
EMD Value
₹6.1 L
Closing Date
16 Jul 2024, 3:00 pmClosed
Additional Collector (Development)
DRDA, Salem
Salem District - Veerapandi Block T01-Maramangathupatty to Keerapappampadi Road (Via) Malaiyanur at PMGSY III 2023-2024 - Batch - I TN15-255.
2024_RDTN_134407_1
TN15255
Open Tender
Civil Works - Roads
Item Rate
270 days
DRDA
As per tender Document
3 documents required · 3 mandatory
₹0
₹6.1 L
DRDA, Salem
14 Sept 2024
18 May 2024
16 Jul 2024
18 May 2024
16 Jul 2024
18 May 2024
29 May 2024
Amount
T 01 Maramangalathupatty to keerapappampady via Malaiyur Km. 4/200 - 7/950
Clearing and grubbing road land including uprooting wild vegetation,grass ,bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MORD Technical Specification Clause 201.
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Excavation for road work in soil with hydraulic excavator of 9.0 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000m as per technical specification clause 302.3 (cutting)
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with cut earth)
Construction of embankment with approved materials obtained from Borrow pits with a lift upto 1.5m transporting to site, spreading, grading to requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Carted Earth)
Construction of embankment using tractor with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)
Providing layer spreading and compacting graded stone aggregate to wet mix macadam specifaction inculding premixing the material with water at OMC in mechanical mixer Pug mill carring of mixed material by tipper to site, laying in uniform layers in sub base/base course on a well prepared sub -base and compacting with smooth wheel roller of 80 to 100 KN weight to achieve the desired density inculding lighting.
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and applying Tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 502.
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Using Waste Plastic 6%)
Mix Seal Surfacing Using Waste Plastic:-Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 510
Provision of Rumble Strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre-to-centre approved locations to control speed, marked with while strips of road marking paint. Rumble Strips = 3 X 3.75 X 0.25 = 2.81
Painting lines, dashes, arrows, etc., on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/ concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and technical specification clause 1702
Providing and fixing Name board
Providing and Fixing 'Logo' of PMGSY Project
Providing and Fixing 'Citizen information Board' of PMGSY Project
Providing and Fixing 'Maintenance information Board' of PMGSY Project
Providing and fixing of Retro Reflectorised Cautionary , Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5mm thick Aluminium Sheet fixed on back support Frame of 25mm x 25mm x 3mm Mild steel angle Iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M15 Grade cement concrete 45cm x 45cm x 60cm below Ground level etc complete including 7 Years warrenty for the Retro Reflective Sheeting as per Clause 6.9 of IRC 67 - 2010 Specification ( as per MORTH & Speccification no : 801 )
90CM Equilateral Trainagle (Cautinary) Sign Board
60CM Circular (Mandatory) Sign Board
chevron sign 90cm octogon
Reflector
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
(ii) Ordinary Kilometer Stone (Precast)
(iii) 200 m stone (precast)
Guard stone
Sub Estimates for CC Pavement
Construction of single Row pipe culvert at ch. 4491m
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Removal of pipes @ ch.4491m
Removal of Body wall @ ch.4491m
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Culvert @ ch.4491
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Culvert @ ch.4491
Providing and laying Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202 & 1203 M 15 (1:2.5:5)
Culvert @ Ch.4491
Providing and laying Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202 & 1203 M 20 ( 1:2:4) Below sill
Culvert @ Ch.4491
Providing and laying Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202 & 1203 M 20 ( 1:2:4) Below sill.(Above Sill Level)
Culvert @ Ch.4491
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Culvert @ Ch.4491
Providing and Laying reinforced Cement Concrete pipe NP3 for Culverts on first bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection works backfilling concrete and masonry works in head walls and parapets
Culvert @ 0/400
Construction of Gravel/Soil-aggregate Base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 401 Grading III (GSB).
Culvert @ 0/400
Construction of 2.0 m RCC Slab culvert 4/0-5/0
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Culvert @ 4/570
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Culvert @ 4/570
Providing and laying Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202 & 1203 M 15 (1:2.5:5)
Culvert @ 4/570
Providing and laying Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202 & 1203 M 20 ( 1:2:4) Below sill
Culvert @ 4/570
Providing and laying Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202 & 1203 M 20 ( 1:2:4) Below sill.(Above Sill Level)
Culvert @ 4/570
Providing and laying Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202 & 1203 M 20 ( 1:2:4)
Culvert @ 4/570
Providing and laying Concrete for Reinforced Concrete in Super structure complete as per drawings and MORD technical specification Clauses 800,1205.4 & 1205.5 (RCC M25)
Culvert @ 4/570
Supplying, Fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and MORD technical specification Clauses 1002, 1010 and 1202
Culvert @ 4/570
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Culvert @ 4/570
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Culvert @ 4/570
Providing Weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V): 2(H) towards drawing face complete as per drawing and technical specification.
Culvert @ 4/570
Backfilling behaind abutment, wing wall and return wall complete as per drawings & MORD technical specification clause 1204.3.8
Culvert @ 4/570
Protective work km 4/0-5/0
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Protective wall @ Ch.4216m
Protective wall @ Ch.4280m
Protective wall @ Ch.4370m
Protective wall @ Ch.4403m
Protective wall @ Ch.4638
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Protective wall @ Ch.4216m
Protective wall @ Ch.4280m
Protective wall @ Ch.4370m
Protective wall @ Ch.4403m
Protective wall @ Ch.4638
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Protective wall @ Ch.4216m
Protective wall @ Ch.4280m
Protective wall @ Ch.4370m
Protective wall @ Ch.4403m
Protective wall @ Ch.4638
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing
Protective wall @ Ch.4216m
Protective wall @ Ch.4280m
Protective wall @ Ch.4370m
Protective wall @ Ch.4403m
Protective wall @ Ch.4638
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall
Protective wall @ Ch.4216m
Protective wall @ Ch.4280m
Protective wall @ Ch.4370m
Protective wall @ Ch.4403m
Protective wall @ Ch.4638
Providing Weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V): 2(H) towards drawing face complete as per drawing and technical specification.
Protective wall @ Ch.4216m
Protective wall @ Ch.4280m
Protective wall @ Ch.4370m
Protective wall @ Ch.4403m
Protective wall @ Ch.4638
Protective work km 5/0-6/0
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Protective wall @ Ch.5380m
Protective wall @ Ch.5460m
Protective wall @ Ch.5570m
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Protective wall @ Ch.5380m
Protective wall @ Ch.5460m
Protective wall @ Ch.5570m
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Protective wall @ Ch.5380m
Protective wall @ Ch.5460m
Protective wall @ Ch.5570m
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing
Protective wall @ Ch.5380m
Protective wall @ Ch.5460m
Protective wall @ Ch.5570m
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall
Protective wall @ Ch.5380m
Protective wall @ Ch.5460m
Protective wall @ Ch.5570m
Providing Weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V): 2(H) towards drawing face complete as per drawing and technical specification.
Protective wall @ Ch.5380m
Protective wall @ Ch.5460m
Protective wall @ Ch.5570m
Protective work km 6/0-7/0
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Protective wall @ ch.6810
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Protective wall @ ch.6810
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Protective wall @ ch.6810
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing
Protective wall @ ch.6810
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall
Protective wall @ ch.6810
Providing Weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V): 2(H) towards drawing face complete as per drawing and technical specification.
Protective wall @ ch.6810
Protective work km 7/0-8/0
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Protective wall @ ch.7180m
Protective wall @ ch.7205m
Protective wall @ ch.7350m
Protective wall @ ch.7730m
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Protective wall @ ch.7180m
Protective wall @ ch.7205m
Protective wall @ ch.7350m
Protective wall @ ch.7730m
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Protective wall @ ch.7180m
Protective wall @ ch.7205m
Protective wall @ ch.7350m
Protective wall @ ch.7730m
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing
Protective wall @ ch.7180m
Protective wall @ ch.7205m
Protective wall @ ch.7350m
Protective wall @ ch.7730m
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall
Protective wall @ ch.7180m
Protective wall @ ch.7205m
Protective wall @ ch.7350m
Protective wall @ ch.7730m
Providing Weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V): 2(H) towards drawing face complete as per drawing and technical specification.
Protective wall @ ch.7180m
Protective wall @ ch.7205m
Protective wall @ ch.7350m
Protective wall @ ch.7730m
Providing for side drain at 6050m
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Side drain @ ch.6050m
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Side drain @ ch.6050m
Providing concrete for Plain/reinforced concrete in open foundations & Sub structure Nominal Mix 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers., compacting etc., complete complying with standard specifications as per drawings and technical specififcations clause 802, 803, 1202 & 1203 and as directed.
Side drain @ ch.6050m
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
R Subramanian
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .