| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.7 LAccepted-AOC GATE NO 3 DIBRUGARH NEAR LANCO POWER PLANT ANPARA SONEBHADRA | ANPARA | SONEBHADRA | UTTAR PRADESH | L1 | Accepted-AOC L-1 bidder. | |
| 2 | L2₹32.5 L+₹1.2 L (3.93%)Rejected-AOC | L2 | Rejected-AOC Not L-1 bidder. | |
| 3 | L3₹33.2 L+₹2.0 L (6.26%)Rejected-AOC ADARSH NAGAR AURIMORE ANPARA SONEBHADRA UTTAR PRADESH PIN 231225 | SONBHADRA | UTTAR PRADESH | 231225 | L3 | Rejected-AOC Not L-1 bidder. |
Tender Value
₹24.7 L
EMD Value
₹50,000
Closing Date
28 Aug 2023, 4:00 pmClosed
SE OMC-III BTPS ANPARA
OFFICE OF SE OMC-III BTPS ANPARA SONEBHADRA
Daily Routine maintenance of intra-site communication system, telephone exchange-IOX-1200(1200-lines)with intercom system, Operation of Photocopier machine and providing assistance for the maintenance work of various C and I system of main turbine an
2023_RVUNL_825789_1
N-ANP/B/OMC3/IMD1/6000002976
Open Tender
Repair and Maintenance Works
Lump-sum
730 days
BTPS, Anpara, Sonebhadra UP
AS PER PQC
3 documents required · 3 mandatory
₹1,180
Dy. CAO CFA and BO BTPS
₹50,000
4 Nov 2023
2 Aug 2023
31 Aug 2023
3 Aug 2023
28 Aug 2023
3 Aug 2023
Amount
PART A
Daily Routine maintenance of Intrasite Communication System (loudophone) of Unit No.4 ,5 & BOP Area except coal handling plant and Associated telelephone lines of EPABX telephone exchange (Model IOX 1200 ). The work includes day to day maintenance i.e. ( running / preventive / breakdown) of following equipments at various locations of 2 x 500 MW BTPS, Anpara.(1 Job = work of 1 month)
Operation of Photocopier machine of Ricoh make, Model No 2550 B in general shift. (1 Job = work of 1 month)
Providing routine assistance in terms of skilled manpower for the maintenance of following control systems as per Scope of Works of Unit 4&5. a) DEHC system of Main Turbine. b) Turbine Sequence Control System (TSQ) c) Turbo Supervisory Instruments (TSI) d) Turbine Measurement Cabinet (TMC) e) EHG system of BFPs f) Vibration Monitoring System g) Turbine VDDC System. h) Turbine Relay Panels. i) Recorders & Indicators. j) Steam Water Analyzer System (SWAS). k) PLC – of WTP l) PLC – of CPP m) ACW, CW & SRW System . n) Compressed Air System). (1 Job = work of 1 month)
Removal of dust particles by thorough cleaning & mopping from out side of the following panels & Control equipments installed in Unit Control Room No. 4&5 BTPS. a. Unit Control desks. b. Unit Control Panels. c. Water quality monitoring panels. d. Electrical protection relay panels. e. Fire system panels. f. Soot blower panels, APC Printers. g. Vibration monitoring system console. h. APC Operator station/Key board.(1 Job/Day)
Removal of dust particles by thorough cleaning & mopping from out side of the following control panels & equipments installed in control equipment room & APC operator station room of Unit No. 4&5 BTPS. a. APC cabinets. b. BMS cabinets with RC feeder, flame scanner & MFT cabinets. c. Vibration monitoring panels. d. BFP control & measurement cabinets. e. BSQ panels. f. Boiler & Turbine interlock relay panels. g. Main turbine DEHC cabinets. h. TSI cabinets. i. On-line vibration monitoring panels. j. Turbine measurement cabinet. k. TSQ panels. l. Boiler annunciation aux. cabinets. m. Turbine annunciation aux. cabinets. n. TLC power electronic control cabinets. o. TLC Tosmap panels. p. Annunciation cabinets. q. Electronics master clock cabinets. r. Inverter cabinets of APC operator station. s. MAX_1 control station equipments. t. BFP-T-EHG maintenance tool (computer). u. RMS maintenance facility console (computer) (1 Job=alternate Day)
Weekly Removal of dust particles by thorough cleaning & mopping from out side of the following local control panels/cabinets, junction boxes & control equipments mounted at side/field on turbine side including CPP mixed beds of both Unit Jobs 4&5 BTPS. a. BLPs of BFP – 6 nos. b. BFP gauge panels – 8 nos. c. BFP local control panels – 2 nos. d. T-BFP test panels – 2 nos. e. Oil tank gauge panels of BFP & Mot.-5 nos. f. Debris filter control panels – 2 nos. g. Condenser tube cleaning control panels-2nos h. Turbine local monitoring panels – 2 nos. i. Turbine local panels – 93 nos. j. Turbine marshalling board panels – 12 nos. k. Local junction boxes & terminal boxes. l. Field equipments & local panels of Regeneration system of CPP & WTP (1 Job/week)
Cleaning and mopping of PVC tile’s floors of unit control room, control equipment room. APC operator room of unit Jobs 4&5 BTPS including analyzer rooms and sample water table room of units (Total floor area about 600 sq. meter.).(2Job/Day)
Proper cleaning of dust, dirt and webs from side walls, false ceiling, door, windows and ventilators of these rooms (Total side walls false ceiling etc. area about 1350 sq. meter). (1 Job/week)
Removal of dust particles by cleaning & mopping from outside the cabinets/panels inside telephone exchange room (SHB ground floor). (1 Job/week)
Removal of dust particles by cleaning & mopping from out side the following panels/equipments inside Intrasite Communication equipment room (+7M). a. P&P Master equipment panel 0.6X1.8X2.4 M b. P&P Master panels – 2 Sets 0.6X1.8X2.4 M. each c. UPS panel 0.8X1.8X2.4 Meters. (1 Job/week)
Cleaning and mopping of PVC/tiled floors of room at Sl.No. 1 to 6 above, 03 Nos. C&I lab rooms & one no., C&I spares parts room including cleaning of jalas from walls and false ceiling & cleaning of glass panels of windows ventilators doors so as to provide dust free atmosphere inside various rooms total floors area 670 Sq. Mtr. of unit 4&5 BTPS
Removal of dust particles by cleaning & mopping room out side the following DAS cabinets of unit 4 & 5: - a) Each DAS room consists of DAS Input termination cabinets. b) DAS main cabinets. c) DAS power distribution board cabinet. d) Programmers console & printer with CRT desk etc. e) CRTs and panels etc. in shift engineer’s room. (1 Job=alternate Day)
Unit Control Room, CER, APC operator station room floor of unit #4&5 (approx. area 607 m²/Unit.) (2Job/Day)
Removal of dust particles by cleaning & mopping from inside & out side the computer cabinets (14 Nos.), APC cabinets (02 Nos.) program instructor console (06 Nos.), Printer, 09 Nos., hard copiers (02 Nos.) Field terminal device (01 Nos.) Fire protection and alarm panels (01 No) Power distribution board panels (01 No) Relay panel (01 No) UCP one set of 04 Nos., VCD one set of 04 Nos.) Station control panels (One set of 03 Nos.) various instruments mentioned there and all other left over equipment inside computer room, Simulator room and instructor console room. (1 Job/week)
Cleaning and mopping of PVC tiled jack floor of simulator room, computer room and instructor console room including cleaning of wall, false ceiling and windows ventilators and partition walls etc. so as to provide best cleaned dust free atmosphere for continuous working of sophisticated electronics/ computer equipments. (1 Job/week)
PART B
16 nos. of Oil firing control system instrumentation (Igniters, oil gun solenoids and associated equipments)
6 nos. of Firing station valves.
(a) Coal mill control system (bunker feeder outlet ball filling gates inlet & Bypass air damper)- 32 nos (b)Cold hot air damper-16 nos ( c)PC pipe mill outlet gates.- 32 nos. (d) Cold & hot air pneumatic shutoff gates & air filter and pressure regulator metallic pipe connection limit switches power cylinder and air lines.- 16 nos
Instruments panels related to coal mills delta P measurement system noise level system. Oil station gauges and switches and switch boards.- 8 nos.
Secondary air control damper along with associated regulator filters etc.- 68 nos.
Other electrically, pneumatically operated control valves and dampers.- 128 nos
Soot Blowers Panels.
HP bypass station and field panel.
Control panels in UCR, CER of unit #4&5. Approx. area 950 m².
Other local control panel BJBs, BMBs, MMBs, BLPs etc.
Side walls and ceilings of UCR, CER & APC operator station room of #4&5 approx. area 1350 m².
Removal of dust particles by cleaning & mopping from outside the following UPS cabinets of unit 4 & 5. Each UPS room cabinets: - (a) DAS UPS cabinets: 04 Nos. (b) Boiler UPS cabinets: 04 Nos. (c) Turbine UPS cabinets: 04 Nos
Removals of dust particles by cleaning & mopping from outside the panels/equipments inside CW pump house DAS room inside HT Switch gear.
Cleaning and washing on both sides of 160 nos. Acrylic covers of flush type tube light fittings installed in various rooms at SL. No. 1 to 6, C&I lab (21 M) and C&I spare parts room, so as give clear visibility. The cleaning is to be done very carefully so as to avoid damage of Acrylic covers.
Cleaning and mopping of both sides of 351 Nos. acrylic sheets each of size 0.6x0.6 Sq. meter installed in simulator room. The cleaning is to be done very carefully so as to avoid damage of Acrylic sheets and covers.
Cleaning and washing on both sides of acrylic sheets of each size 0.6X0.6 sq. meter installed in UCB Job 4&5 BTPS, so as to give clear visibility inside control room (331 Nos.)
M/S SANJAY ELECTRONICS
M/S Electrotec Controls
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .