| 3 | L3₹16.1 L+₹24,484.92 (1.55%)Rejected-Finance P 22 C I T ROAD 10TH FLOOR C I T ROAD ENTALLY KOLKATA WEST BENGAL 700014 | KOLKATA | WEST BENGAL | 700014 | L3 | Rejected-Finance Highest rate |
| Sl No | Description | Qty | Unit | EFFLUENT AND WATERTREATMENT ENGINEERS PVT LTD L3 | JDJ ENTERPRISE. A UNIT OF JDJ TRADERS PRIVATE LIMITED L1 | ALOK ENTERPRISE. A Unit of Saket Trexim Pvt. Ltd. L2 |
|---|---|---|---|---|---|---|
| 1.00Day to day operation of all the electromechanical accessories pertaining to the entlre AIRP unit such as panel, valves, compressors, blowers, voltagr stabilizer, disinfection arrangement, level sensors, pressure transmitters, flow meters valve actuators, high lift pumps, iron elimination vaIve, arsenic removal valves etc. by engaging operating person and performing backwash whenever system asks for, re-circulation of water from sludge tank using recirculation pump etc. including engagement of competent technical person having sufficient knowledge to monitor daily basis onsite SCADA operation activities for smooth operation through HMI including overall monitoring of the SCADA enabled system = 365 days. | ||||||
| 1.10 | Karimpur-Jalangi (Zone-VI) PWSS | 365 | days | 704 ₹2,56,960 | 691 ₹2,52,215 Lowest | 700 ₹2,55,500 |
| 1.11 | Karimpur-Jalangi (Zone-VII) PWSS | 365 | days | 704 ₹2,56,960 | 691 ₹2,52,215 Lowest | 700 ₹2,55,500 |
| 1.12 | Arabpur PWSS | 365 | days | 704 ₹2,56,960 | 691 ₹2,52,215 Lowest | 700 ₹2,55,500 |
| 2.00Day to day /Weekly/Preventive maintenance of compressor,Blower, Pressure transmitters, LeveI Sensor, FIow meter, Valve actuator etc., and changing of gland packing of high lift and Recirculation pump as and when required. Cleaning of contacts once in a month by CRC LT panel, including cleaning of all terminals, sockets, coils once in a month in presence of Electric Supervisor/Electrician. Routine and periodical inspection of entire SCADA System,physical maintenance of SCADA software system etc., including recharging of SIM for data transfer to central server. This includes refilling of compressor oil cheaking of performance of compressor, cheaking of all field instruments and SCADA by deployment of SCADA technician for data transmission and dash board data generation alongwith charging of Lead Packing, CTC or CRC for contact cleaning etc.= 12 months. | ||||||
| 2.10 | Karimpur-Jalangi (Zone-VI) PWSS | 12 | months | 14,200 ₹1,70,400 | 14,000 ₹1,68,000 Lowest | 14,050 ₹1,68,600 |
| 2.11 | Karimpur-Jalangi (Zone-VII) PWSS | 12 | months | 14,200 ₹1,70,400 | 14,000 ₹1,68,000 Lowest | 14,050 ₹1,68,600 |
| 2.12 | Arabpur PWSS | 12 | months | 14,200 ₹1,70,400 | 14,000 ₹1,68,000 Lowest | 14,050 ₹1,68,600 |
| 3.00Supervision charges for electrical installation by Licensed Electrician as per IE Rules, 1956 read with latest amendments,Overhead Expenditure as per specification & direction of the EIC.= 12 months. | ||||||
| 3.10 | Karimpur-Jalangi (Zone-VI) PWSS | 12 | months | 8,600 ₹1,03,200 | 8,522 ₹1,02,264 Lowest | 8,570 ₹1,02,840 |
Tender Value
Refer Docs
EMD Value
₹32,600
Closing Date
25 Sept 2026, 5:00 pmClosed
Executive Engineer Eastern Mechanical Division P.
Executive Engineer EMD, PHED, P-16, CIT ANNEX BLDG Kol 73
Operation and Guarding of SCADA based fully automatic SMART Arsenic cum Iron Removal Plant based on Zero discharge facility at 3(three) nos. different PWSS in NADIA District under Eastern Mechanical Division, PHE Dte.
2026_PHED_5023152_7
WBPHED/EE/EMD/NIET-07/2026-27
Open Tender
MECHANICAL
Item Rate
365 days
Executive Engineer EMD, PHED, P-16, CIT ANNEX BLDG
Please refer Tender documents.
6 documents required · 6 mandatory
₹32,600
29 Sept 2026
10 Sept 2026
28 Sept 2026
10 Sept 2026
25 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Day to day operation of all the electromechanical accessories pertaining to the entlre AIRP unit such as panel, valves, compressors, blowers, voltagr stabilizer, disinfection arrangement, level sensors, pressure transmitters, flow meters valve actuators, high lift pumps, iron elimination vaIve, arsenic removal valves etc. by engaging operating person and performing backwash whenever system asks for, re-circulation of water from sludge tank using recirculation pump etc. including engagement of competent technical person having sufficient knowledge to monitor daily basis onsite SCADA operation activities for smooth operation through HMI including overall monitoring of the SCADA enabled system = 365 days. | |||||
| 1.1 | Karimpur-Jalangi (Zone-VI) PWSS | 365 | days | - | - |
| 1.11 | Karimpur-Jalangi (Zone-VII) PWSS | 365 | days | - | - |
| 1.12 | Arabpur PWSS | 365 | days | - | - |
| 2Day to day /Weekly/Preventive maintenance of compressor,Blower, Pressure transmitters, LeveI Sensor, FIow meter, Valve actuator etc., and changing of gland packing of high lift and Recirculation pump as and when required. Cleaning of contacts once in a month by CRC LT panel, including cleaning of all terminals, sockets, coils once in a month in presence of Electric Supervisor/Electrician. Routine and periodical inspection of entire SCADA System,physical maintenance of SCADA software system etc., including recharging of SIM for data transfer to central server. This includes refilling of compressor oil cheaking of performance of compressor, cheaking of all field instruments and SCADA by deployment of SCADA technician for data transmission and dash board data generation alongwith charging of Lead Packing, CTC or CRC for contact cleaning etc.= 12 months. | |||||
| 2.1 | Karimpur-Jalangi (Zone-VI) PWSS | 12 | months | - | - |
| 2.11 | Karimpur-Jalangi (Zone-VII) PWSS | 12 | months | - | - |
| 2.12 | Arabpur PWSS | 12 | months | - | - |
| 3Supervision charges for electrical installation by Licensed Electrician as per IE Rules, 1956 read with latest amendments,Overhead Expenditure as per specification & direction of the EIC.= 12 months. | |||||
| 3.1 | Karimpur-Jalangi (Zone-VI) PWSS | 12 | months | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
Tendernotice_2.pdf
PDF • 1.65 MB
Tendernotice_3.pdf
PDF • 2.33 MB
Tendernotice_4.pdf
PDF • 0.86 MB
BOQ_5106662.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .