Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹50.2 L+₹61,744 (1.25%)Rejected-AOC B 1 1769 PREM NAGAR KOTKAPURA | L2 | Rejected-AOC L2 | |
| 3 | L3₹51.2 L+₹1.6 L (3.30%)Rejected-AOC | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | PAUL AND COMPANY L1 | INDO ENGINEERING WORKS L2 | SURJIT SINGH AND SONS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundations, trenches etc. In all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches , stacking the excavated soil clear from the edge of excavation and subsequent filling around masonary in 15 cm layers with compaction including diposal of all surplus soil as directed within a lead of 30 metres. | 1,110.77 | Cum | 162.5 ₹1,80,500 Lowest | 162.5 ₹1,80,500 Lowest | 162.5 ₹1,80,500 Lowest |
| 2.00 | Shuttering for faces of concrete foundations and foundation
beam & plinth beam (vertical or battering) | 325.4 | Sqm | 187.5 ₹61,013 Lowest | 187.5 ₹61,013 Lowest | 187.5 ₹61,013 Lowest |
| 3.00 | Centering and shuttering for columns (Square or rectangular
or poly gonal in plain) | 633.48 | Sqm | 425.89 ₹2,69,793 Lowest | 425.89 ₹2,69,793 Lowest | 425.89 ₹2,69,793 Lowest |
| 4.00 | Cement Concrete 1:8:16 With stone aggregates 40mm gauge (mixing by mechanical means using concrete mixer volumetric type) . | 3.42 | Cum | 2,298.15 ₹7,860 Lowest | 2,298.15 ₹7,860 Lowest | 2,298.15 ₹7,860 Lowest |
| 5.00 | Cement Concrete 1:6:12 with stone aggregate 40mm gauge(mixing by mechanical means using concrete mixer volumetric type) | 62.72 | Cum | 2,292.8 ₹1,43,804 Lowest | 2,292.8 ₹1,43,804 Lowest | 2,292.8 ₹1,43,804 Lowest |
| 6.00 | Cement concrete 1:5:10 with stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type | 9.8 | Cum | 2,286.31 ₹22,406 Lowest | 2,286.31 ₹22,406 Lowest | 2,286.31 ₹22,406 Lowest |
| 7.00 | Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type | 21.5 | Cum | 2,271.06 ₹48,828 Lowest | 2,271.06 ₹48,828 Lowest | 2,271.06 ₹48,828 Lowest |
| 8.00 | Cement concrete 1:2:4 With stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type | 60.55 | Cum | 2,386.43 ₹1,44,498 Lowest | 2,386.43 ₹1,44,498 Lowest | 2,386.43 ₹1,44,498 Lowest |
| 9.00 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. | 164.77 | Cum | 2,762.81 ₹4,55,228 Lowest | 2,762.81 ₹4,55,228 Lowest | 2,762.81 ₹4,55,228 Lowest |
| 10.00 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS : 1791 and vibrated by needle vibrator but excluding steel reinforcement centering and shuttering in superstructure . | 51.66 | Cum | 3,431.56 ₹1,77,274 Lowest | 3,431.56 ₹1,77,274 Lowest | 3,431.56 ₹1,77,274 Lowest |
Tender Value
₹48.2 L
EMD Value
₹96,320
Closing Date
2 Jul 2026, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sr. Xen, Civil Works Division, PSTCL, Jalandhar.
Room No. 301, Shakti Sadan, Jalandhar
Construction of Additional 220/66 kV Bus Bar System for 220 kV DC Line Dasuya at 220 kV Sub Station Hoshiarpur.
2026_POWER_169279_1
CWJ/T-06/2026-27.
Open Tender
Civil Works
Tender cum Auction
195 days
at 220 kV Sub Station Hoshiarpur.
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹96,320
Yes
28 Oct 2026
3 Jun 2026
3 Jul 2026
3 Jun 2026
2 Jul 2026
3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundations, trenches etc. In all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches , stacking the excavated soil clear from the edge of excavation and subsequent filling around masonary in 15 cm layers with compaction including diposal of all surplus soil as directed within a lead of 30 metres. | 1,110.77 | Cum | 162.5 | ₹1,80,500.13 |
| 2 | Shuttering for faces of concrete foundations and foundation
beam & plinth beam (vertical or battering) | 325.4 | Sqm | 187.5 | ₹61,012.5 |
| 3 | Centering and shuttering for columns (Square or rectangular
or poly gonal in plain) | 633.48 | Sqm | 425.89 | ₹2,69,792.8 |
| 4 | Cement Concrete 1:8:16 With stone aggregates 40mm gauge (mixing by mechanical means using concrete mixer volumetric type) . | 1 | Cum | 2,298.15 | ₹2,295.85 |
| 5 | Cement Concrete 1:6:12 with stone aggregate 40mm gauge(mixing by mechanical means using concrete mixer volumetric type) | 62.72 | Cum | 2,292.8 | ₹1,43,804.42 |
| 6 | Cement concrete 1:5:10 with stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type | 9.8 | Cum | 2,286.31 | ₹22,405.84 |
| 7 | Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type | 21.5 | Cum | 2,271.06 | ₹48,827.79 |
| 8 | Cement concrete 1:2:4 With stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type | 60.55 | Cum | 2,386.43 | ₹1,44,498.34 |
| 9 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. | 164.77 | Cum | 2,762.81 | ₹4,55,228.2 |
| 10 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS : 1791 and vibrated by needle vibrator but excluding steel reinforcement centering and shuttering in superstructure . | 1 | Cum | 3,431.56 | ₹3,428.13 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.92 MB
TC.pdf
Tender Documents • 3.12 MB
TCA.pdf
Tender Documents • 0.34 MB
DNIT.pdf
Tender Documents • 6.19 MB
TECHSPEC1.pdf
Tender Documents • 9.95 MB
TECHSPEC2.pdf
Tender Documents • 19.10 MB
BOQ_344682.xls
BOQ • 0.30 MB
Corr01.pdf
PDF • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .