Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.1 LAdmitted-Finance | -36.11% | ₹6.1 L | L1 | Admitted-Finance |
| 2 | L2₹6.3 LAdmitted-Finance | -33.40% | ₹6.3 L | L2 | Admitted-Finance |
| 3 | L3₹6.6 LAdmitted-Finance | -29.99% | ₹6.6 L | L3 | Admitted-Finance |
| 4 | L4₹7.1 LAdmitted-Finance | -25.10% | ₹7.1 L | L4 | Admitted-Finance |
| 5 | L5₹8.0 LAdmitted-Finance | -16.00% | ₹8.0 L | L5 | Admitted-Finance |
Tender Value
₹9.5 L
EMD Value
₹18,960
Closing Date
23 Apr 2026, 6:00 pmClosed
Executive Engineer PWD (RandB) Division Ramnagar
Executive Engineer PWD (RandB) Division Ramnagar
BOQ
2026_PWDJK_307977_5
e-NIT No. 03 of 2026-27 Dated- 16-04-2026
Open Tender
Civil Works
60 days
RAMNAGAR
NIT
2 documents required · 2 mandatory
₹600
Executive Engineer PWD (RandB) Division Ramnagar
₹18,960
4 May 2026
16 Apr 2026
24 Apr 2026
16 Apr 2026
23 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil 80% + Ordinary rock 20% | - | CUM | - | - | BI01010001010000000000000515BI0100001112 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering , all works upto plinth level ( 1 : 4 : 8)1 cement 4 coasre sand 8 stone aggregate grade , with 40mm nominal size . crushed | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering , all works upto plinth level ( 1 : 3 : 6 ) with 20% boulders 1 cement 3 coasre sand 6 stone aggregate grade , with 20mm nominal size .crushed | - | CUM | - | - | BI01010001010000000000000515BI0100001114 |
| 4 | Brick work with common burnt clay F.P.S (Non-modular) brick of class designation 75 in foundation and plinth in 1:6 (1 cement : 6 coarse sand) | - | CUM | - | - | BI01010001010000000000000515BI0100001115 |
| 5 | Extra for brick work in Super structure above plinth level upto floor V level (By manual means) | - | CUM | - | - | BI01010001010000000000000515BI0100001116 |
| 6 | Centering and shittering including strutting propping etc and removal of form work Foundation footing bases of columns etc | - | SQM | - | - | BI01010001010000000000000515BI0100001117 |
| 7 | Providing nd laying Damp Proof course 50 mm thick cement concrete 1:2:4 and curing complete | - | SQM | - | - | BI01010001010000000000000515BI0100001118 |
| 8 | 12 mm cement plaster on the rough side of single or half brick wall of mix 1:6 ( 1 cement 6 fine sand ) | - | SQM | - | - | BI01010001010000000000000515BI0100001119 |
| 9 | Finishing walls with water proofing cement paint of requried shade New work(two or more coat )applied @384 kg /10 sqm | - | SQM | - | - | BI01010001010000000000000515BI0100001120 |
| 10 | Steel work welded in built up section, trusses and framed works including cutting , hoising, fixing in position and applying a priming coat of approved steel primer and painting all complete | - | KG | - | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_998599.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid