| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹39.4 LAdmitted-Finance | -23.10% | ₹39.4 L | L1 | Admitted-Finance |
| 2 | L2₹39.8 L+₹41,454.21 (1.05%)Admitted-Finance 44 A LAXMI NAGAR JHOTWARA JAIPUR JAIPUR | JAIPUR | RAJASTHAN | 302001 | -15.51% | ₹39.8 L+₹41,454.21 (1.05%) | L2 | Admitted-Finance |
| 3 | L3₹41.2 L+₹1.8 L (4.63%)Admitted-Finance | -20.11% | ₹41.2 L+₹1.8 L (4.63%) | L3 | Admitted-Finance |
| 4 | L4₹42.3 L+₹2.9 L (7.38%)Admitted-Finance 45 GANPATI NAGAR SHIPRA PATH MANSAROVAR JAIPUR RAJASTHAN 302020 | JAIPUR | RAJASTHAN | 302020 | -13.40% | ₹42.3 L+₹2.9 L (7.38%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical technicaly not qualified |
| Sl No | Description | Qty | Unit | Goyal Construction L4 | M/S SINGODIA AND SONS L1 | TANU ENTERPRISES L2 | V P TRADING COMPANY L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | wall painting artistic work along with scrapping and preparing base with acrylic primer and painting same with base coat of acryalic emulssion to obtain smooth and clear finish (one or more coat) followed by multicolor wall painting artistic, 3D. landscape, graphity work with designing and skeching along with coat of exterior paint or rubber based exterior paint of highquality, sheding or mixing (ultima or shine) of approved brand one or more for even and smooth finished wall as directed by eng. incharge for pre approved design. | 1,000 | Sqm | 450 ₹4,50,000 | 98 ₹98,000 Lowest | 250 ₹2,50,000 | 405 ₹4,05,000 |
Tender Value
₹49.9 L
EMD Value
₹99,780
Closing Date
10 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER CIVIL LINE ZONE
JAIPUR NAGAR NIGAM PANDIT DEENDAYAL UPPADHYAY BHAWAN LALKOTHI TONK ROAD JAIPUR
CIVIL REPAIR WORK IN VARIOUS PARK AS PER REQUIREMENT SITUATED IN CIVIL LINE ZONE AREA
2026_DLB_578464_1
21 EXECUTIVE ENGINEER CIVIL LINE ZONE
Open Tender
Repair and Maintenance Works
Percentage
240 days
JAIPUR
As Per Bid Documents
3 documents required · 3 mandatory
₹590
ONLINE PAY IN JAIPURMC WEBSITE
₹99,780
Yes
12 Aug 2026
29 Jul 2026
11 Aug 2026
29 Jul 2026
10 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 700 | cum | 46.6 | ₹32,620 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Lime Concrete, cement concrete grade M-10 (1:5:10) and below | 140 | cum | 393.5 | ₹55,090 |
| 3 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301.In all type of soil | 130 | cum | 235.5 | ₹30,615 |
| 4 | CARRIAGE OF MATERIALS (By Mechanical Means): Carriage of Materials by mechanical transport including loading, unloading and stacking :: The rates will be applicable to net quantities after deduction of prescribed percentage for voids mentioned in the specification under subhead "Carriage of Materials"Stone, boulders, gravelly material 10.00km | 140 | cum | 335.38 | ₹46,953.2 |
| 5 | CARRIAGE OF MATERIALS (By Mechanical Means): Carriage of Materials by mechanical transport including loading, unloading and stacking :: The rates will be applicable to net quantities after deduction of prescribed percentage for voids mentioned in the specification under subhead "Carriage of Materials" Earth 10.00km | 130 | cum | 356.36 | ₹46,326.8 |
| 6 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand) | 50 | cum | 4,860 | ₹2,43,000 |
| 7 | Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) | 40 | cum | 6,300 | ₹2,52,000 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 120 | cum | 4,575 | ₹5,49,000 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 10 | cum | 5,510 | ₹55,100 |
| 10 | Providing and fixing precast cement concrete M-20 grade (Using mechanical Concrete Mixer) kerb stone top and bottom width 115 and 165 mm respectively, 250 mm high on 150 mm thick PCC M-10 grade foundation as per design, including fixing at site as per clause 408 of MoRT&H Specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 300 | mtr | 326 | ₹97,800 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
eproc21xenclz.pdf
Tender Documents • 4.62 MB
BOQ_1028056.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .